ML19240A031

From kanterella
Jump to navigation Jump to search
Transmittal Supplemental Information 08162019
ML19240A031
Person / Time
Site: 07000157
Issue date: 08/16/2019
From: Whaley P
University of Texas at Austin
To: Ty Naquin
NRC/NMSS/DFCSE/FLB
Naquin T
References
Download: ML19240A031 (1)


Text

DEPARTMENT OF MECHANICAL ENGINEERING Nuclear Engineering Teaching Laboratory Pickle Research Campm R-9(}(}0

  • 512-232-5380
  • FAX 511-471-4589 1111clear.e11gr.11texas.ed11
  • wcl1arlto11@a11sti11.11texas.ed11 ATTN: Document Control Desk Nuclear Regulatory Commission Washington, D. C. 20555-0001 T. D. Naquin, CHP NMSS/DFCSE/FFLB

SUBJECT:

Docket No.70-157, License SNM-180 Supplemental Information Supporting License Amendment Request (ML19079A165)

REFERENCE:

(1) Docket NO,70-157, License Amendment Request to SNM-180 (Docket 70-157) Supporting Shipping Preparations (22 April 2019)

Sir:

(2) Docket No.70-157, Request for Authorized Use and Authorized Place of Use Change of License SNM-180 (ML19079A165)

(3) Docket No. 50-602, Request for Transfer of Pu Be Sources (Currently on Docket 70-157, License SNM-180) to License R-129 (ML19067A245)

Attached is supplemental information supporting the license amendment request for Special Nuclear Materials license SNM-180. The information is two instructions, one detailing resizing ofMCNZPR fuel elements and another resizing sub critical assembly fuel disks in preparations for shipping.

If there are any questions, please feel free to contact P. M. Whaley at 512-232-5373 or wha\\ey@maU.utxas,t:d u.

Sincerely, I declare under penalty of perjury that the foregoing is true and correct W. S. Charlton ATTACHMENTS

1.

NETL Project Instruction MCZPR Fuel Element Resizing 15 August 2019

2.

NETL Project Instruction Sub-Critical Assembly Fuel Disk Extraction and Resizing 15 August 2019