MONTHYEARML19212A5932019-07-31031 July 2019 GEH Transmittal of Request for a Revision of the GE Model No. 2000 Certificate of Compliance (USA/9228/B(U)-96) to Reintroduce BWR Irradiated Fuel Content Project stage: Request ML19232A0762019-08-26026 August 2019 Letter to S. Lamb Application for the Model No. 2000 Transport Package, Revision 28 - Accepted for Review Project stage: Other ML19296C2732019-10-23023 October 2019 Transmittal Letter and Enclosure - Request for Additional Information for Review of the Model No. 2000 Package Project stage: RAI ML20031C7042020-01-31031 January 2020 GEH Responses to the U.S. NRC RAIs ML19296C273 for the GE Model No. 2000 (GE2000) Project stage: Request ML20084J4102020-03-26026 March 2020 General Electric Hitachi Nuclear Energy Americas, LLC Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML20093B4682020-04-0202 April 2020 Supplemental Information for MCNP6 Area of Applicability and Qualification for NEDO-33866 Revision 6 Project stage: Request ML20108F5732020-04-23023 April 2020 Certificate of Compliance No. 9228, Revision No. 28, for the Model No. 2000 Package Transmittal Letter Project stage: Other ML20108F5722020-04-23023 April 2020 Certificate of Compliance No. 9228, Revision No. 28, for the Model No. 2000 Package Project stage: Other ML20108F5712020-04-23023 April 2020 Certificate of Compliance No. 9228, Revision No. 28, for the Model No. 2000 Package Safety Evaluation Report Project stage: Approval 2020-01-31
[Table View] |
|
---|
Category:Letter
MONTHYEARML22285A0972022-12-0101 December 2022 Renewal of Certificate of Compliance 2000 Transmittal Letter ML22161A9582022-06-10010 June 2022 GEH Request for Renewal - Certificate of Compliance No. 9228 for the Model No. 2000 Package, Revision 28, Docket No. 71-9228 ML20108F5732020-04-23023 April 2020 Certificate of Compliance No. 9228, Revision No. 28, for the Model No. 2000 Package Transmittal Letter ML20093B4532020-04-0202 April 2020 GE-Hitachi Nuclear Energy Americas, LLC - Revision of the GE Model No. 2000 (Docket No. 71-9228) to Clarify Irradiated Hardware Content and Update the Quality Assurance Program References ML20084J4102020-03-26026 March 2020 General Electric Hitachi Nuclear Energy Americas, LLC Request for Withholding Information from Public Disclosure ML20031C6992020-01-31031 January 2020 GEH - Responses to the NRC Requests for Additional Information for the GE Model No. 2000 ML19319A8522019-11-15015 November 2019 GEH Request for Additional Time to Respond to NRC Requests for Additional Information (RAI) for the GE Model No. 2000 (Docket No. 71-9228) to Reintroduce BWR Irradiated Fuel Content ML19296C2732019-10-23023 October 2019 Transmittal Letter and Enclosure - Request for Additional Information for Review of the Model No. 2000 Package ML19232A0762019-08-26026 August 2019 Letter to S. Lamb Application for the Model No. 2000 Transport Package, Revision 28 - Accepted for Review ML19212A5932019-07-31031 July 2019 GEH Transmittal of Request for a Revision of the GE Model No. 2000 Certificate of Compliance (USA/9228/B(U)-96) to Reintroduce BWR Irradiated Fuel Content ML19025A0112019-01-25025 January 2019 GE-Hitachi Nuclear Energy Americas, LLC - Presentation for February 5, 2019 GE2000 SAR Amendment Meeting ML18102B4472018-04-17017 April 2018 Letter to S. Murray Certificate of Compliance No. 9228, Revision No. 27, for the Model No. 2000 Package ML18058A1112018-02-27027 February 2018 Submittal of Revision 3 of GEH Public Version Safety Analysis Report for Certificate of Compliance Renewal of the Model No. 2000 Package ML18009A6912018-01-0909 January 2018 Transmittal Letter and Affidavit for Revision 2 of GEH Safety Analysis Report for Certificate of Compliance Renewal of the Model No. 2000 Package ML0702505212007-01-19019 January 2007 Request for NRC Consent to the Transfer of Control of GE Licenses to GE-Hitachi Nuclear Energy America, LLC and for Approval of Conforming Amendments 2022-06-10
[Table view] |
Text
August 26, 2019 Mr. Shawn Lamb Engineering Manager Industrial Nuclear Company, Inc.
3901 Castle Hayne Road Wilmington, NC 28401
SUBJECT:
APPLICATION FOR THE MODEL NO. 2000 TRANSPORT PACKAGE, REVISION 28 - ACCEPTED FOR REVIEW (EPID NO. L-2019-LLA-0168)
Dear Mr. Lamb:
By letter dated July 31, 2019 (Agencywide Documents Access and Management System Accession No. ML19212A593), you submitted an application to revise Certificate of Compliance (CoC) No. 9228, for the Model No. 2000 transport package. You submitted this amendment request to reintroduce GE 10x10 Boiling Water Reactor irradiated fuel as an approved content.
The U.S. Nuclear Regulatory Commission staff performed an acceptance review of your application and determined it contains sufficient technical information in scope and depth to allow the staff to complete a detailed technical review.
We have established a schedule for the review and estimated that the staff may need approximately 450 hours0.00521 days <br />0.125 hours <br />7.440476e-4 weeks <br />1.71225e-4 months <br /> to complete its review. The schedule allows for the staff to issue a request for additional information (RAI) in October 2019 and, if a second RAI is not needed, a CoC in February 2020, based on you responding to the first RAI in November 2019. In general, no additional changes to the application should be submitted except for changes resulting from your response to an RAI.
If you have any questions regarding this matter, please contact me at (301) 415-6877.
Sincerely,
/RA/
Chris Allen, Project Manager Spent Fuel Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Docket No. 71-9228 EPID No. L-2019-LLA-0168
ML19232A076 OFFICE:
NMSS\\DSFM NMSS\\DSFM NMSS\\DSFM NAME:
WAllen SFigueroa via e-mail JMcKirgan DATE:
8/16/19 8/19/19 8/26/19