JUN 131979
_M I_
.~
Docket No. 50-440
~
Docket No. 50-441 The Cleveland Electric Illuminating Company ATTN: Dalwyn R. Davidson Vice President-Engineering P. O. Box 5000 Cleveland, OH 44101 Gentlemen:
Thank you for your letter dated May 29, 1979, pursuant to 10 CFR 50.55(e) regarding fabrication of the Perry Intake Structures. We will review your final report on this matter upon receipt.
Your cooperction with us is appreciated.
Sincerely, G. Fiorelli, Chief Reactor Construction and Engineering Support Branch cc w/1tr dtd 5/29/79:
Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Harold W. Kohn, Ohio Power Siting Commission Mr. Daniel D. Wilt, Attorney le RII R II RIII l
- fysr Wi iams Fiore li 6/11/79 i
s' 6
- 7) [ 7 O(/
7907180 g 3 g
em
}
+
I
\\
l
. -J t
~
- b. i rLLiLL 4 i.
r e r i
rr i LL i L i 6-L-
l L L b 1.
'l.r
.ie s
4 i fL (LLUMiN ATING SLDG e PUBLIC SQUARE o CLEVILAND. OHIO 44101 e TELEPHONE (216) 623-1350 e MAIL ADDPE55 PO BCx box Darwyn R. Davidson
~
~
v-OfP&l5 Oft' Sv5tf u ENS Nf E E NG AND CON 5Tm C1 SON u
xay 29, 1 W9
, Mr. James G. Keppler,
~
-Director of Region III Office of Inspection and Enforcanent ifnited States Nuclear Regulatory Canaission 799 &>osevelt Boad Glen Ellyn, Illinois 60137 RE: Perry Ruclear Power Plant Locket Nos. 50-%0; 50-M1 Bignificant Deficiency RE: 8 & M Constructors, !ac.'s Quality Assurance Program Relative to Control eI B & M Bubcontractor: Se HAlvorsen Boiler and Eugineering Cea
Dear Mr. Keppler:
Se Interin Report regarding subject significant deficiency states the Final Report is scheduled to be in your office by June 1,1W9 As discussed with Mr. J. KemMin on May 23,1W9, we are continuing our evaluation of the Intake Structures. Until this evaluation is eczpleted, our Final Report earnnt be ocapleted.
It is anticipated that the evaluation will be completed so that a Final Report can be suhaitted by August 31, 1979 Very truly yours, i
//
L r2.rn.
e D. R. Davidson, Vice President-System Engineering and Construction Isz p ff se: John G. Davis, Director (Acting)