ML19225D113
| ML19225D113 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 07/19/1979 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Jeffery Grant TOLEDO EDISON CO. |
| References | |
| NUDOCS 7908070346 | |
| Download: ML19225D113 (1) | |
Text
TO
/f a arc %'o, o
UNITE D STATES y }, ".,_, 7 'g NUCLEAR REGULATORY COMMISSION 5(
/, c REGION 111 o,
A
[
799 ROOSEVELT ROAD
\\.e' [
GLEN ELLYN,ILLINolS 60137 Docket No. 50-346 JUL 191979 Toledo Edison Company ATTN:
Mr. James S. Grant Vice President - Energy Supply Edison Plaza 300 Madison Avenue Toledo, OH 43652 Gentlemen:
Since the Three Mile Island incident, the NRC Commissioners, the public and the media have expressed an increased interest in the status of operating nuclear power plants and fuel far.ilitice.
This interest has now reached a level where it is desirable to know, on a daily basis, the status of nuclear facilities with an operating license. We request your cooperation in obtaining this information. We plan to contact each operating facility on the dedicated phone during the last half of the 12:00 midnight to 8:00 a.m. shift each day.
This call will also be used as the check of the dedicated te'ephone line. The amount of time required should not exceed one or two minutes for any facility since we will only be asking for the operating status of each plant.
If a unit is not fully operational, we would like to have a very brief description of the reason for this. During prolonged outages, we will not make these status calls.
Implementation of this program will start Monday, July 23, 1979.
Please notify your responsibic plant personnel of this program.
If you have any questions call the Regional Office.
Sincerely,,
James G. Keppler Director cc:
Mr. T. D. Murray, Station Superintendent Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR
~
NSIC TIC Harold W. Kohn, Ohio Power Siting Commission Helen W. Evans, Director
]UJ pr State of Ohio
[
T908070 3%
+