an arco

'o, UNITED STATES TIC 8'

' 'g NUCLEAR REGULATORY COMMISSION 3.,,

a

/. t REGION 111 o,,

f 799 ROOSEVELT ROAD As U

o GLEN E LLYN, lLLINOIS 60137 JUL 2 01979 Docket No. 50-346 Toledo Edisen Company ATTN:

Mr. James S. Grant Vice President - Energy Supply Edison Plaza 300 Madison Avente Toledo, OH 43652 Gentlemen:

IE Balletin No. 79-14 is revised to limit the scope of work required.

The changes are indicated on the enclosed replacement page for th-bulletin.

If you desire additional information regarding this matter, please contact this office.

Sincerely,

\\M g

Adames G. Keppler I

Director

Enclosure:

IE Bulletin No. 79-14, page 2, Revision 1 cc w/ encl:

Mr. T. Murray, Station Superintendent Central Files Director, NRR/oF' Director, NRR/ DOR l'DR Local PDR NSIC J

TIC Hrrold W. Kohn, Power

,hff

}]"

Siting Commission

/Dj

/7 Helen W. Evans, State of Ohio 790802 0355

IE Bulletin No. 79-14 July 18,1979 Revision 1 Page 2 of 3 Action to be taken by Licensees and Pemit Holders:

All power reactor facility licensees and construction permit holders are requested to verify, unless verified to an equivalent degree within the last :Z months, that the seismic analysis applies to the actuaT configura-tion of safety-related piping systems. The safety related pipin Seismic Category I systems as defined by Regulatory Guide 1.29, g includes Seismic Design Classification" Revision 1. dated August 1,1973 or as defined in the applicable FSAR. Jh_e action items that follow apply to all safety related piping 21/2-inches in diameter and greater and to seismic Category I piping,

~

regardless of size which was dynamically analyzed by computer. For older plants. Where Seismic Category I requirerrents did not exist at the time of licensir.g it must be shown that the actual configuration of f#ff( safety-related systems, utiliring piping 21/22 tes in diameter and greater, meets design requirements.

Specifically, each licensee is reo,sested to:

1.

Identify inspection eleme nts to be used in verifying tnut the seismic analysis input informatit'n conforms to the actual configuration of safety-related systems.

For eacr safety-related system, submit a list of design documents, including tit'e, identification number, revision, and date, which were sources or ing information for the seismic analyses. Also submit a description of the seismic analysis input infomation which is contained in each documnt.

Identify systems or portions of systems which are planned to N inspected during each sequential inspection ider.tified in Items 2 and 3. Submit all of this information within 30 days of the date of this bulletin.

2.

For port. ions of systems which are normally accessible *, inspect one system in each set of redundant systems and all nonredundant systems for con-fomance to the seismic analysis input infomation set forth in design documents.

Include in the inspection: pipe run geometry; support and restraint design, locations, function and clearance (including floor and wall penetration); embedments (excluding those covered in IE Bulletin 79-02); pipe attachements; and valve and valve operator locations and weights (excluding those covered in IE Bulletin 79-04).

Within 60 days of the date of this bulletin, submit a description of the results of this inspection. Where nonconformances are found which affect operability of any system, the licensee will ex;iedite completion of the inspection described in Item 3.

  • Nomally accessible refers to those areas of the plant which can be entered during reactcr operation.

42 gc; 90725 04 y a

-