Ofbl/
GRa
. p * "' %,'
UNITED STATES
,.4
- g gj' $
!3, NUCLEAR REGULATORY COMM!SSR N 3
w4semos. o. c. :csss t GUaf /
' %,, ',, /
JUL 6 69 Docket No: 50-461 APPLICANT:
Illinois Power Company FACILITY:
Clinton Nuclear Power 5tation, Unit 1
SUBJECT:
SU'V1ARY'0F JUNE 12-13,1979 FORECAST PANEL SITE VISIT TO CLINTON NUCLEAR POWER STATION, UNIT 1
Background:
The NRC Fcrecast Panel (W. Lovelace, R. Knop, H. bescott, B. Bud. ley; made a site visit to the Clinton Nuclear Power Station, Unit 1 in order to review the status of construction for fuel loading. A list of the meeting attendees i; enclosed.
Summary:
On the morning of June 12, 1979 we met with the applicant at their Corporative offices in Decatur, Illinois and discussed their organizational structure, finan-cial plans, loau forecast and their commitment to generating power.
Enclosure 1 is a list of attendees.
We then visited the site to discuss the status of construction, the schedule for completion of ccostruction and system turnover for beginning of the preoperational test program of the Clinton Nuclear Power Station, Unit 1 with representatives of the Illinois Power Company and their general contractors, Balc' win Associates and Sargent & Lundy. The applicant described the bulk material quantities installed to date and the total to be installed for several quantities of material as follows.
Total Estimated Quantity Percent fiaterial i
Quantity Installed Complete
. Concrete cu. yds.
296,800 212,649 71.672 Lg. Pipe Bldg. lin.ft.
167,500 24,923 14.9
.Small Pipe 169,100 7,491 a.4 (CableTray 113,750 14,073 12.4
! Conduit 278,770 360 0
Cable 4,211,880 154 0
l
!Tenninations 244,170 114 0
400 022 7908010$lN
/
~
~
JUL 6 :979 The applicant staP d that they had 156 days negative float based ca no over-time; however, they had instituted a recovery plan, using the distributed float technique, in April 1979 to recover the above cited lost time. The effectiveness of this recovery scheme will be known in July or August 1979.
Tne applicant's stated that construction is 47.6% complete and that their projected fuel load date is April 1,1982.
During 1978, the applicant stated that they had sustained an average 1.n per month completion rate and an average
- c. '.?% per month during 1979. They further stated that they will submit t.
Final Safety Analysis Report to the Commission on December 1, 1979. is a list of attendees at the site meeting.
We were favorably impressed with the management control activities at the site and the projected netwcrk for system turnover and start of the pre-operational test program. Nevertheless, based on the quantity of bulk material instalied to date and a general comparison of the completion of construction for Clinton, Unit I with other sites at similar stages, it was our view that the applicant's estimated fuel load date of Ap. il 1,1982 was optimistic.
We estimate that construction is approximately 32% complete and a nominal con-struction completion date of June 1983.
The aoplicant reaffimed their view that construction would be completed by April 1,1982 and requested that the Forecast Panel mcke a return visit in November / December 1979 to review the status of construction. We stated that we would make another visit at the above cited time frame. is a list of attendees at the exit meeting.
C &nzN Bartholomew C. Buckley, Project Manager Light Water Reactors Branch No.1 Division of Project Management
Enclosures:
As Stated cc:
See next page r7 k
Mr. L. J. Koch JUL 6 1979 Mr. L. J. Koch, Vice President Illinois Power Compai.)
500 Soutn 27th Street Decatur, Illinois 62325 cc:
Mr. Peter V. Fazio, Jr.
Schiff, Hardin & Waite 7200 Sears Tower 2 3 South Wacker Drive Chicago, Illinois 60606 Mr. George Wuller Licensing Coordinator Illinois Power Company 500 South 27th Street Decatur, Illinois 62525 t
i J
E a,
l r
?
i (y0 02.4
[.
4 I.
Ii =
b ll l
' *'l l'N n
I=
l =
m x
4
'9 si si
=l n
mr1 -
--__ ____...i..__._,.__...
Ef4 CLOSURE 1 List of Attendees NRC B. Buck. ley W. Lovelace IPC B. Blackburn G. Brashear J. Geier W. Gerstner L. Koch J. McHood S. Unks C. Wells G. Wuller wl
ENCLOSURE 2 List of Attendees NRC Baldwin Associates B. Buckley W. Harrington R. Knop R. Hyden W. Lovelace P. Hyzer H. Wescott
- 0. Junkert J. Stewart
- 1. iinois Power Co.
T. Yearick G. Brashear J. Geier Sargent f, Lundy J. Greev:'
R. Heider V. Holt scher V. Heward L. Koch J. PicHood S. Utiks J. Toning G. E. Wuller 400 026
ENCLOSURE 3 List of Attendees NRC Illinois Power Company B. Buckley J. Blackburn R. Knop G. Brashear W. Lovelace J. Geier H. Wescott D. Holtzscher L. Koch J. McHood J. Tonias S. Unks C. Wells G. Wuller 400 027