ML19225C551
| ML19225C551 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 07/06/1979 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| References | |
| NUDOCS 7908010032 | |
| Download: ML19225C551 (2) | |
Text
f'p* *
- coq (o UNITED STATES
'n NUCLE AR RELL L A'ORY COMMISSION E
R L' il ' ~ 4 11 2
.s I
o, f
101 MARIETT A b ' i W. SUIT E 3100 P
AT L ANT A, GE ORGI A 30303 g,
o JUL 6 1979 In Reply Refer To:
RII:JP0 50-259 50-260 50-296 Tennessee Valley Authority Attn:
H. G.
Parris Manager of Power 500A Chestnut Street Tower II Chattanooga, Tennessee 37401 Gentlemen:
This Information Notice is provided as an early notification of a possibly significant matter.
It is expected that recipients will review the infor-mation for possible applicability to their facilities.
No specific action or response is requested at this time.
If you have questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.
e N\\
y-
_7 ww A James P. O'Reilly Director
Enclosure:
IE Information Notice No. 79-18 4 0((
Y 7 908010( G
t JUL 6 1979 Tennessee Valley Authority cc w/ encl:
J. E. Gilleland Assistant Manager of Power 500C Chestnut Street Tower II Chattanooga, Tennessee 37401 J. G. DEwease Plant Superintendent Post Office Box 2000 Decatur, Alabama 35602 J. F. Cox 400 Comerce Street W10Cl31 C Knoxville, Tecressee 37902 D. E. McCloud Project Engineer 400 Chestnut Street Tower II Chattanooga, Tennessee 37401 k 0,
UNITED STATES M'CI. EAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 July 6, 1979 IE Information Notice No. 79-18 SKYLAB REENTRY Description of Circumstances:
The most recent dates for reentry of Skylab are July 10 to 14, 1979, with July 12, as the most probable date.
Recognizing that a hit on a nuclear power plant would be highly unlikely by Skylab debris, the NRC believes it would be prudent for licensees to review their contingency plans in case such an event should actually occur.
The NRC is in communication with the Department of Energy (DOE), and will receive notification from them as soon as the reentry corridor can be established.
This notification may occur within I to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> before reentry actually occurs.
If it is determined that there are any licensed nuclear power plants in the reentry corridor, the plants will receive notification from their respective Regional Office via the dedicated phone line.
This Information Notice is provided as an early notification of a possibly significant matter.
It is expected that recipients will review the baforma-tion for possible applicability to their facilities.
No specific action or response is requested at t hi s t ime.
If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licnesee actions.
If you have questions regarding the matter, please contact the Director of the appropriate NRC Regional Office.
No written response to this information notice is required.
kk
kWMMo 7907120387
IE Information Notice No. 79-18 Encloeure July 6, 1979 Page 1 of 2 LISTING OF IE INFORMATION NOTICES ISSUED IN 1979 Inf o rma t ion Subj ec t Date Issued To Notice No.
Issued 79-01 Bergen-Paterson Hydraulic 2/2/79 All power reactor Shock and Sway Arrestor facilities with an OL or a CP 79-02 Attempted Extortion -
2/2/79 All Fuel Facilities Low Enriched Uranium 79-03 Limitorque Valve Geared 2/9/79 All power reactor Limit Switch Lubricant facilities with an OL or a CP 79-04 Degradation of 2/16/79 All power reactor Engineered facilities with an Safety Features OL or a CP 79-05 Use of Loproper Materials 3/21/79 All power reactor in Safety-Related Components facilities with an OL or CP 79-06 Stress Analysis of 3/23/79 All Halders of Safety-Related Piping Reactor OL or CP 79-07 Rupture of Radwaste Tanks 3/26/79 All power reactor facilities with an OL or CP 79-08 Interconnection of 3/28/79 All power reactor Contaminated Systems with facilities with an Service Air Systems Used OL and Pu Processing As the Source of Breathing fuel facilities Air 79-09 Fpill of Radioactively 3/30/79 All power reactor Contaminated Resin facilities with an OL 79-10 Nonconforming Pipe 4/16/79 All power reactor Support Struts facilities with a CP 79-11 Lower Reactor Vessel Head 5/7/79 All holders of Reactor Insulation Support Problem OLs and cps
}
3 rM
IE Information Notice No. 79-18 Enclosure July 6, 1979 Page 2 of 2 LISTING OF IE INFORMATION NOTICES ISSUED IN 1979 In f o rma t ion Subj ec t Date Issued To Notice No.
Issued 79-12 Attempted Damage to New 5/11/79 All Fuel Facilities Fuel Assemblies Research Reactors, and Power Reactors with an OL or CP 79-13 Indication of Lov Water 5/29/79 All Holders of Reactor Level in the Oyster Creek OLs and cps Reactor 79-14 NRC Position of Electrical 6/11/79 All Power Reactor Cable Support Systems Facilities with a CP 79-15 Deficient Procedures 6/7/79 All Holders of Reactor OLs and cps 79-16 Nuclear Incident at Three 6/22/79 All Research Reactors Mile Island and Test Reactors with OLs 79-17 Source Holder Assembly Damage 6/20/79 All Holders of Reactor T)amage Frca Misfit Between OLs and cps Assembly and Reactor Upper Grid Plate OLi !'