ML19225C550
| ML19225C550 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 07/06/1979 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| References | |
| NUDOCS 7908010031 | |
| Download: ML19225C550 (2) | |
Text
l s ** " %q'c, p
UNITED ST ATES NUCLE AR REGULATORY COMMISSION 8,'
.. f i
$ gij,;/
i REGION 11 o, gch f
101 M ARIE TT A sT. N w, SUIT E 3100 ATL ANT A. GEORGI A 30303
's j
- ...+
JUL C 1979 In Reply Refer To:
RII:JPO 50-321 50-366 Georgia Power Company Attn:
J. H. Miller, Jr.
Executive Vice President 270 Peachtree Street, N. W.
Atlanta, Georgia 30303 Gentlemen:
This Information Notice is provided as an early notification of a possibly significant matter.
It is expected that recipients will review the infor-mation for possible applicability to their facilities. No specific action this time.
If you have questions regarding or response is requested at this matter, please contact the Director of the appropriate h7C Regional Office.
'Q w/
James P. O'Reilly A
Director Fnclosure:
IE Information Notice No. 79-18 447 l44 7908010 C I!
JUL 6 1979 Georgia Power Company.
cc w/ encl:
M. Manry, Plant Manager Post Office Box 442 Parley, Georgia 31513 C. E. Belflower Site QA Supervisor Post Office Box 442 Baxlei, Ceorgia 31513 h, A ?
)hb t/
s UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 July 6, 1979 IE Inf ormation Not ice No. 79-18 SKYLAB REENTRY Description c'
.cumstances:
The most iecent dates for reentry of Skylab are July 10 to 14, 1979, with July 12, as the most probable date.
Recognizing that a hit on a nuclear power plant would be highly unlikely by Skylab debris, the NRC believes it would be prudent for licensees to review their contingency plans in case such an event should actually occur.
The NRC is in coccunication with the Department of Energy (DOE), and will receive notification from them as soon as the reentry corridor can be established. This notification may occur within 1 to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> before reentry actually occurs.
1.
it is determined that there are any licensed nuclear power plants in the reentry corridor, the plants will receive notification from their respective Regional Office via the dedicated phone line.
This Information Notice is provided as an early notification of a possibly' significant matter.
It is expected that recipients will review the Unforma-tion for possible applicability to their f acilities. No specific action or response is requested at this t ime.
If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licnesee actions.
If you have questions regarding the matter, please contact the Director of the appropriate NRC Regional Office.
No written response to this information notice is required.
hh 9997M 6@ M 7907120387
IE In f ormat ion Not ice No. 79-18 Enclosure July 6, 1979 Page 1 of 2 LISTING OF IE INFORMATION NOTICES ISSUED IN 1979 In f o rma't ion Subj ec t Date Issued To Notice Na.
Issued 79-01 Bergen-Paterson Hydraulic 2/2/79 All power reactor Shock and Sway Arrestor facilities with an OL or a CP 79-02 At t empt ed Extortion -
2/2/79 All Fuel Facilities Low Enriched Uranium 79-03 Limitorque Valve Geared 2/9/79 All power reactor Limit Switch Lubricant facilities with an OL or a CP 79-04 Degradation of 2/16/79 All power reactor Engineered facilities with an Safety Features OL or a CP 79-05 Use of Improper Materials 3/21/79 All power reactor in Safety-Related Components facilities with an OL or CP 79-06 Stress Analysis of 3/23/79 All Holders of Safety-Related Piping Reactor OL or CP 79-07 Rupture of Radwaste Tanks 3/26/79 All power reactor facilities with an OL or CP 79-08 Interconnection of 3/28/79 All power reactor Contaminated Systems with facilities with an Service Air Systems Used OL and Pu Processing As the Source of Breathing fuel facilities Air 79-09 Spill of Radioactively 3/30/79 All power reactor Contaminated Resin facilities with an OL 79-10 Nonconforming Pipe 4/16/79 All power reactor Support Struts facilities with a CF 79-11 Lower Reactor Vessel Head 5/7/79 All holders of Reactor Insulation Support Problem OLs and cps 447 147
IE Information Notice No. 79-18 Enclosure July 6, 1979 Page 2 of 2 LISTING OF IE INFORMATION NOTICES ISSUED IN 197';
In f o rma t ion Subject Date Issued To Notice No.
Issued 79-12 Attempted Damage tc New 5/11/79 All Fuel Facilities Fuel Assemblies Research Reactors, and Power Reactors with an OL or CP 79-13 Indication of Low Water 5/29/79 All Holders of Reactor Level in the Oyster Creek OLs and cps Reactor 79-14 NRC Position of Electrical 6/11/79 All Power Reactor Cable Support Systems Facilities with a CP 79-15 Deficient Procedures 6/7/79 All Holders of Reactor OLs and cps 79-16 Nuclear Incident at Three 6/22/79 A. ' Research Reactors Mile Island and Test Reactors with OLs 79-17 Source Holder nssembly Damage 6/20/79 All Holders of Reactor Damage From Misfit Between OLs and cps Assembly and Reactor Upper Crid Plate L\\ l