ML19225C041
| ML19225C041 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 08/12/2019 |
| From: | Diane Jackson Operations Branch I |
| To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
| References | |
| Download: ML19225C041 (3) | |
Text
D. Curtlan UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 August 12, 2019 Mr. Bryan C. Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNIT 2 - REQUALIFICATION PROGRAM INSPECTION
Dear Mr. Hanson:
In a telephone conversation on August 6, 2019, Mr. T. Fish, Senior Operations Engineer, and Mr. G. Elkins, Manager, Operations Training, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at Unit 2. The inspection is planned for the week of October 21, 2019, which coincides with your scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: (1) an index or summary of condition reports written in the past 2 years in which licensed operator errors were determined to be the root or contributing cause; (2) an index or summary of condition reports written in the past 2 years on simulator performance problems; (3) an index or summary of simulator performance test results in the past 2 years; and 4) the examination schedule, sample plan, and operating test scheduled for the week of the inspection to the NRC by October 7, 2019. Mr. Elkins has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.
B. Hanson 2
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52),
U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. T. Fish at (610) 337-5369.
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No.
50-410 License No.
NPF-69 cc:
Distribution via ListServ
B. Hanson 3
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNIT 2 - REQUALIFICATION PROGRAM INSPECTION DATED AUGUST 12, 2019 Distribution w/encl:
(via E-mail)
DLew, RA (R1ORAMAIL RESOURCE)
RLorson, DRA (R1ORAMAIL RESOURCE)
DPelton, DRP (R1DRPMAIL RESOURCE)
PKrohn, DRP (R1DRPMAIL RESOURCE)
JYerokun, DRS (R1DRSMAIL RESOURCE)
BWelling, DRS (R1DRSMAIL RESOURCE)
ECarfang, DRP SHaney, DRP SObadina, DRP NPerry, DRP, SRI JSchussler, DRP, RI KTennity, DRP CCook, RI OEDO RidsNrrPMREGinna Resource RidsNrrDorlLpl1 Resource DOCUMENT NAME: \\\\nrc.gov\\nrc\\R1\\Office\\DRS\\Operations Branch\\FISH\\Requal FY20 - NMP2 Oct2019\\2019 LOR CorpNotifLtr.docx ADAMS NO. ML19225C041 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS/OB RI/DRS/OB NAME TFish DEJackson DATE 8/09/19 8/12/19 OFFICIAL RECORD COPY