ML19225B896
| ML19225B896 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 07/18/1979 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Burstein S WISCONSIN ELECTRIC POWER CO. |
| References | |
| NUDOCS 7907260220 | |
| Download: ML19225B896 (1) | |
Text
[p" *n,o o
UNITED STATES TIC 8 \\
3.
'n NUCLEAR REGULATORY COMMISSION REGION lli 3-o,,
[h
/
799 ROOSEVELT ROAD be e
GLEN ELLYN, ILLINots 60137 JUL 181979 Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN:
Mr. Sol Burstein Executive Vice President Power Plants 231 West Michigan Milwaukee, WI 53201 Supplement No. I to IE Bulletin No. 79-15 Gentlemen:
Written responses and information requested in IE Bulletin No. 79-15 shall be submitted to:
United St.ates Nuclear Regulatory Commission Office of Inspection and Enforcement Washington, D.C.
20555 Attention: Director, Divisien of Reacter Construction Inspection with a copy to the hPC Regional Director.
Sincerely,
[% m})hb 0~-
/ James G. Ke r
Director cc w/ encl:
Mr. G. A. Reed, Plant Manager Central Files Director, NRR/DPM Director, NRR/ DOR C. M. Tremel, ORB /NRR PDR
~
}g@
349 TIC Sandra A. Bast, Lakeshore Citizens for Safe Energy f
l
'~.,/
19072602 2 6