ML19225B896

From kanterella
Jump to navigation Jump to search
Notifies That Written Responses to IE Bulletin 79-15,Suppl 1,should Be Directed to IE Div of Reactor Const Insp
ML19225B896
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/18/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 7907260220
Download: ML19225B896 (1)


Text

[p" *n,o o

UNITED STATES TIC 8 \\

3.

'n NUCLEAR REGULATORY COMMISSION REGION lli 3-o,,

[h

/

799 ROOSEVELT ROAD be e

GLEN ELLYN, ILLINots 60137 JUL 181979 Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN:

Mr. Sol Burstein Executive Vice President Power Plants 231 West Michigan Milwaukee, WI 53201 Supplement No. I to IE Bulletin No. 79-15 Gentlemen:

Written responses and information requested in IE Bulletin No. 79-15 shall be submitted to:

United St.ates Nuclear Regulatory Commission Office of Inspection and Enforcement Washington, D.C.

20555 Attention: Director, Divisien of Reacter Construction Inspection with a copy to the hPC Regional Director.

Sincerely,

[% m})hb 0~-

/ James G. Ke r

Director cc w/ encl:

Mr. G. A. Reed, Plant Manager Central Files Director, NRR/DPM Director, NRR/ DOR C. M. Tremel, ORB /NRR PDR

~

Local PDR NSIC

}g@

349 TIC Sandra A. Bast, Lakeshore Citizens for Safe Energy f

l

'~.,/

19072602 2 6