ML19225B880

From kanterella
Jump to navigation Jump to search
Notifies That Written Responses to IE Bulletin 79-15,Suppl 1,should Be Directed to IE Div of Reactor Const Insp
ML19225B880
Person / Time
Site: 05000484
Issue date: 07/18/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dienhart A
NORTHERN STATES POWER CO.
References
NUDOCS 7907260201
Download: ML19225B880 (1)


Text

V %g

  1. g UNITED Si ; irs

'c, b

E **

_cg[n NUCLEAR REGULAT

OMMISSION

$J' ' 'd/'

S REGION lli g

)

[

799 ROOSEVE LT HOAD v

e GLEN E LLYN, ILLirJOls 60137 JUL 181979 Docket No. 50-484 Northern States Power Company ATTN:

Mr. A. V. Dienhart Vice President - Tyrone Energy Park 100 North Barstow Street Eau Claire, WI 54701 Supplement No. I to IE Bulletin No. 79-15 Gentlemen:

Written responses and information requested in IE Bulletin No. 79-15 shall be suomitted to:

United States Nuclear Regulatory Commission Office of Inspection and Enforcement Uaahington, D.C.

20555 Attention: Director, Division of Reactor Construction Inspection with a copy to the NRC Regional Director.

Sincerely, ab2 bb.

gJamesG.Kep1r Director cc w/ encl:

Central Files Director, NRR.'DI-M Director, NRR/ DOR PDR Local PDR NSIC TIC Rcgions I & IV 398 340

(/

'7 9 0 7 26 C 29 {'