ML19225B852
| ML19225B852 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 07/18/1979 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Hines E DETROIT EDISON CO. |
| References | |
| NUDOCS 7907260181 | |
| Download: ML19225B852 (1) | |
Text
%
UNITED STATES TIC
,8' "n
NUCLEAR REGULATORY CO*4 MISSION e
3 <,,, ~,,
REGION lit
/' f 799 ROOSEVELT ROAD o,
8 g
s..e j
GLEN E LLYN, lLLINOIS 60137 JUL 181979 Docket No. 50-341 The Detroit Edison Company ATIN:
Mr. Edward Hines, Assistaut Vice President and Manager Quality Assurance 200? Second Avenue Detroit, MI 48226 Supplement No. I to IE Bulletin No. 79-15 Gentlemen:
Written responses and information requested in IE Bulletin No. 79-15 shall be submitted to:
United States Nuclear Regulatory Commission Office of Inspection and Enforcement Washington, D.C.
20555 Attention: Director, Division of Reactor Construction Inspection with a copy to the NRC Regional Director.
Sincerely, 2&
^
James G. Kepp er Director cc w/ encl:
Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Eugene B. Thomas, Jr.,
Attorney 369 301 7907260\\1(