ML19225B561
| ML19225B561 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 07/06/1979 |
| From: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| References | |
| NUDOCS 7907250509 | |
| Download: ML19225B561 (1) | |
Text
T:f<-
y4 arcg E[y "cj g o
UNITED STATEE g
NUCLEAR REGULATORY COMMISSION
/c c REGION I
[
631 PARK AVENUE
'V
[
KING OF PRUSSIA, PENNSYLVANIA 19406 Docket Nos. 50-245 JULg mg 50-336 Northeast Nuclear Energy Company ATTN:
Mr. W. G. Counsil Vice President - Nuclear Engineering and Operations P. O. Box 270 Hartford, Connecticut 06101 Gentlemen:
This Information Notice is provided as an early notification of a possibly significant matter.
It is expected that recipients will review the information for possible applicability to their facilities.
No specific action or response is requested at this time.
If you have questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.
Sincerely, Jdt Boyce H. Grier
~
Director
Enclosures:
1.
IE Information Notice No. 79-18 2.
List of IE Information Notices Issued in 1979 cc w/encls:
J. F. Opeka, Station Superintendent D. G. Diedrick, Manager of Quality Assurance J. R. Himmelwright, Licensing Safeguards Engineer K. W. Gray, Construction Quality Assurance Lead H. R. Nims, Director of Nuclear Projects A. Z. Roisman, Natural Resources Defense Council
.J /
O2 3 57 79072 5 c6c9
UNITED STATES NUCLEAR REtiULATORY COMMISSION OFFICE OF INSPECTION A*!C ENFORCEMENT WASHINGTON, P L.
20555 IE Information Notice No. 79-18 Date:
July 6, 1979 Page 1 of 1 SKYLAB REENTRY Description of Circumstances:
The most recent dates for reentry of Skylab are July 10 to 14, 1979, with July 12, as the most probable date.
Recognizing that a hit on a nuclear power plant would be highly unlikely by Skylab debris, the NRC believes it would be prudent for licensees to review their contingency plans in case such an event should actually occur.
The NRC is in communication with the Department of Energy (D0E), and will receive notification from them as soon as the reentry corridor can be established.
This notification may occur within 1 to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> before reentry actually occurs.
If it is determined that there are ar.y licensed nuclear power plants in the reentry corridor, the plants will receive notification from their respective Regional Office via the dedicated phone line.
This Information Notice is prov ded as an early notification of a possibly i
significant matter.
It is expected that recipients will review the informa-tion for possible applicability to their facilities.
No specific action or response is requested at this tima.
f further NRC evaltations so indicate, an IE Circular or Bulietin will be issued '.o recommend or request specific licnesee actions.
If you have questions regarding the matter, please contact the Director of the appropriate NRC Regional 3ffice.
No written response to this information notice is required.
412 38 0 7 907120397 M+Mitene..
ENCLOSURE 2 IE Information Notice No. 79-13 Date:
July 6, 1979 Page 1 of 2 LISTING 0F IE INFORMATION NOTICES ISSUEC IN 1979 Information Subject Date Issued to Notice No.
Issued 79-01 Bergen-Paterson Hydraulic 2/2/79 All power reactor Shock and Sway Arrestor facilities with an Operating License (0L) or Construct Permit (CP) 79-02 Attempted Extortion -
2/2/79 All ruel Facilities low Enriched Uranium 79-03 Limitorque Valve Geared 2/9/79 All power reactor Limit Switch Lubricant facilities with an OL or CP 79-04 Degrrdation of 2/16/79 All power reactor Engineered facilities with an Safety Features OL or CP 79-05 Use of Improper Materials 3/21/79 All power reactor in Safety-Related Components facilities with an OL or CP 79-06 Stress Analysis of 3/23/79 All power reactor Safety-Related Piping facilities with an OL or CP 79-07 Rupture of Radwaste Tanks 3/26/79 All power reactor fac lities with an OL 3r CP 79-08 Interconnection of 3/28/79 All power reactor Contaminated Systems with facilities with an Service Air Systems Used OL and Pu Processing As the Source of Breathing fuel facilities Air 79-09 Spill of Radioactivity 3/30/79 All power reactor Contaminated Resin facilities with an OL 79-10 Nonconforming Pipe 4/16/79 All power reactor Support Struts facilities with a CP 412 3t$1f IE Information Notice No. 79-18 Date:
July 6, 1979 Dage 2 of 2 LISTING OF IE INFORMATION NOTICES ISSUED IN 1979 Infcrmation Subject Date Issued to Notice No.
Issued 79-11 Lower Reactor Vessel Head 5/7/79 All power reactor Insulation Support Problem facilities with an OL or CP 79-12 Attempted Damage to New 5/11/79 All Fuel Facilities, Fuel Assei..slies Research Reactors, and Power Reactors with an OL or CP 79-13 Indication of Lc4 Water S/29/79 All power reactor Level in the Oyste.-
facilities with an Creek Reactor OL or CP 79-14 Safety Classification of 6/11/79 All applicants for, Electrical table Support and holders of a Systems power reactor CP 79-15 Deficient Procedures 6/7/79 All power reactor facilities with an OL or CP 79-16 Nuclear Incident at 6/22/79 All research and Three Mile Island test reactors with an OL 79-17 Source Holder Assembly 6/20/79 All power reactor Damage from Misfit Between facilities with an Assembly and Reactor Upper OL or CP Grid Plate 412 Jog 3a