Amends Section 5 of 790614 Ltr to NRC Re IE Bulletin 79-01. Replacement Solenoid Operated Valves Will Be Installed During First Appropriate Outage Following Receipt of Replacements
ML19225B499
Person / Time
Site: North Anna Dominion icon.png
Issue date: 07/19/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton
Office of Nuclear Reactor Regulation
References
591, NUDOCS 7907250260
Download: ML19225B499 (1)


Text

V IIIG I ilA 13 LI CTilIC A!i D l'OW H it C()M a% N Y H ICItMON D,VIHOIN IA 2026 8 N1y 19,1979 Mr. liarold R. Denton, Director Serial No. 591 Division of Operating Reactors P0/FHT:baw Office of Nuclear Reactor Regulation Docket No: 50-333 U. S. Nuclear Regulatory Commission License No. NPF-4 Washington, . C. 20555

Dear Mr. Denton:

Failure of Solenoid Operated Valves to Meet IE Bulletin 79-01 Environmental Oualification Requirements Please refer to our letter of June 14, 1979, Serial No. 466, on the above subject. We reported the corrective action that has been taken or will be taken to correct the lack of environmental qualification of ceveral ASCO solenoid valves used at North Anna and Surry Power Stations. Section V of that letter, Corrective Action, should be amended to state that the re-placement valves for North Arma Unit I will be installed during the "first appropriate outage following receipt of replacements".

Very truly yours, 2b.)??.vJia&.Q C. M. Stallings Vice President-Power Supply and Production Operations cc: Mr. James P. O'Reilly, Director Office of Inspection and Enforcement Region II Tc dY , hl

/ ,