ML19225B472

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-14,Revision 1, Seismic Analysis for As-Built Safety-Related Piping Sys. Action Required
ML19225B472
Person / Time
Site: Dresden, Byron, Braidwood, Quad Cities, Zion, LaSalle  Constellation icon.png
Issue date: 07/20/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
References
NUDOCS 7907250217
Download: ML19225B472 (1)


Text

[

'o UNITE D STATES 8 \\',,, cf(',j NUCLEAR REGULATORY COMMISSION

" //

r nrGIOfJIll o, '.

[

7.

t VELT ROAD gv....f GL E r. t a v N, ILUNOIS 60137 JUL 2 01979 Docket Nos. 50-10, 50-237, 50-249, 50-254, 50-265, 50-295, 50-304, 50-373, 50-374, 50-454, 50-455, 50-456 and 50-457 Commonwealth Edison Company ATTN:

Mr. Byron Lee, Jr.

Vice President Post Office Bcx 767 Chicago, IL 60690 Gentlemen:

IE Bulletin No. 79-14 is revised to limit the scope of work required.

The changes are indicated on the enclosed replacement page for the bulletin.

If you desire additional information rega: 2ng this matter, please contact this office, Sincerely, f

a 6A-f J ames G. Keppler

[

Director

Enclosure:

IE Bulletin No. 79-14, page 2, Revision 1 cc w/ enc 1:

Mr. B. B. Staphenson, Mr. R. Cosaro, Project Station Superintendent Superintendent Mr. N. Kalivianakis, Cer. tral Files Station Superintenden:

Director, NRR/DPM Mr. N. Wandke, Station Director, NRR/ DOR Superintendent PDR Mr. L. J. Burke, alte Local PDR Project Superintendent NSIC Mr. T. E. Quaka, Quality TIC Assurance Supervisor Anthony Roissan, Esq.,

Mr. R. H. Holyoak, Station Attorney Superintendent Mr. Dean Hansell, Office Mr. Gunner Sorensen, Site of Assistant Attorney Project Superintendent General qgon501\\)

h-74