ML19225B424
| ML19225B424 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 06/11/1979 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Clayton F ALABAMA POWER CO. |
| References | |
| NUDOCS 7907250148 | |
| Download: ML19225B424 (3) | |
Text
...
- pn nsa
\\(
u
'o UNITED STATES E'
,,, f ','n NUCLEAR REGULATORY COMMISSION
{.b Ap(. 8 E
REGION 11 h
101 MARIETT A sT., N.W., SUITE 310o o y
'V ATL ANTA. GEORGI A 30303 In Reply Refer To:
JVN111970 RII:VJT 50-348 Alabama Power Company ATTN:
F. L. Clayton, Jr.
Senior Vice President P. O. Box 2641 Birmingham, AL 35291 Gentlemen:
Region II has recently acquired a Measurecents Van to be utilized by Inspectors of the Fuel Facility and Materials Safety Branch in conducting confirmatory measurements at each power reactor facility. This letter and its enclosure will provide information relative to the Van and the three Inspectors who will accom-pany it.
It it our intention to initiate these announced inspections in June, 1979, following coordination by the Region II Inspectors with your onsite personnel.
In the interests of timely inspections and minimal impact on your security organization I am requesting that the Region II Measuremecis Van be granted the access privileges of a " licensee designated vehicle" as authorized in 10 CFR 73.55(d,4).
Specifically, I request that tue Van, following routine vehicle search, be granted a permanent parking location within the protected area, be secured by the Inspectors who will control the door keys, and allowed to reeain at that location until the completion of the inspection. Additionally, we have made provisions for self-contained illumination.of the Van in consideration of the lighting requirements committed to in your Security Plan.
William Tobin, Region II Security Section, will coordinate our request and he is available to you and yc.ar staff if there are any queations relative to this matter.
Thank yor for your cooperation.
Sin:erely, 417 083 oa$O wes P. O'Reilly
Enclosure:
1.
Ide.wification Data Sheet cc w/ encl:
(See Page 2)
])
~
. 907 250 W8 '
)
Alabama Power Company JU N 111979 cc w/ encl:
A. R. Barton Executive Vice President P. O. Box 2641 Birmingham, AL 35291 H. O. Thrash Manager-Nuclear Generation P. O. Box 2641 Birmingham, AL 35291 C. Biddinger, Jr.
Manager-Corporate Quality Assurance P. O. Box 2641 Birmingham, AL 35291 W. G. Hairston, III Plant Manager Drawer 470 Ashford, AL 36312 R. E. Hollands, Jr.
QA Supervisor P. O. Box U Ashford, AL 36312 4i7 084
JU N 111979 ENCLOSURE 1 Region II, Fuel Facility and Materials Safety Branch Inspectors Daniel Montgomery Badge C0163 Gregory Gibson Badge C0115 Peter McPhail Badge B0206 Measurement Van 1978, Boyertown, 27 foot van 11' x 9' White color 4i/
085 d