ML19225B307

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 79-18, Skylab Reentry. No Action Required
ML19225B307
Person / Time
Site: 07001113
Issue date: 07/06/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Alkema R
GENERAL ELECTRIC CO.
References
NUDOCS 7907240492
Download: ML19225B307 (1)


Text

f s uso, UNITED STATES

/

'o, ff' %

NUCLEAR REGULATORY COMMISSION 2-

")

E REGION 11 o,

[

101 M ARIETT A sT., N W., sulT E 3100 ATL ANT A, GEORGI A 30303 b'

e

JUL 6 1979 In Reply Refer To:

RII:JPO 70-1113 General Electric Company Attn:

R. J. Alkema, General Manager Wilmington Manufacturing Department P. O. Box 780 Wilmington, North Carolina 28401 Gentlemen:

This Information Notice is provided as an early notification of a possibly significant matter.

It is expected that recipients will review the infor-mation for possible applicability to their facilities. No specific action or response is requested at this time.

If you have questions regarding this matter, please contact the Director of the appropriate hTC Regional Office.

  • WZ'5

~v h James P. O'Reilly Director

Enclosure:

IE Information Notice No. 79-18 367 050 7 907 240W;2.

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 July 6, 1979 IE Information Notice No. 79-18 SKYLAB REENTRY Description of Circumstances:

The most recent dates for reentry of Skylab are July 10 to 14, 1979, with July 12, as the most probable date. Recognizing that a hit on a nuclear power plant would be highly unlikely by Skylab debris, the NRC believes it would be prudent for licensees to review their contingency plans in case such an event should actually occur.

The NRC is in communication with the Department of Energy (DOE), and will receive notification from them as soon as the reentry corridor can be established. This notification may occur within 1 to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> before reentry actually occurs.

If it is determined that there are any licensed nuclear power plants in the reentry corridor, the plants will receive notification from their respective Regional Office via the dedicated phone line.

This Information Notice is provided as an early notification of a possibly significant matter.

It is expected that recipients will review the informa-tion for possible applicability to their facilities.

No specific action or response is requested at this time.

If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licnesee actions.

If you have questions regarding the matter, please contact the Director of the appropriate NRC Regional Office.

No written response to this information notice is required.

r DUPLICATE DOCUMENT 5

Entire document previously entered into system under:

$$NA02cP?

ANO No. of pages:

F k hem.

.s--L/

  • s
u. A

, %.h w~

m

~

7907700387 Sg 051