ML19225A865
| ML19225A865 | |
| Person / Time | |
|---|---|
| Site: | Wood River Junction |
| Issue date: | 05/17/1979 |
| From: | Martin W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Bowers C UNITED NUCLEAR CORP. (SUBS. OF UNC, INC.) |
| Shared Package | |
| ML19225A866 | List: |
| References | |
| NUDOCS 7907200485 | |
| Download: ML19225A865 (2) | |
Text
'[g as(D NUCLEr' REGULATORY COMM!sslON o
[
REGION I o
631 PARK AVENUE f
KING O F PRUSSI A, PENNSYLV ANIA 19406 S
S p
+ ***
Docket No.70-820 MAY l 71979 United Nuclear Corporation ATTN: Mr. C. E. Bowers General Manager Fuel Recovery Operations Wood River Junction, Rhode Island 02894 Gentlemen:
Subject:
Inspection 79-09 This refers to the inspection conducted by Mr. P. Bissett of this office on April 2-4,1979 of activities authorized by NRC License No. SNM-777 and to the discussions of our findings held by Mr. Bissett with Mr. R. Gregg of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection and Enforcement Inspection Report which is enclosed with this letter. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, documentation of your control and accounting procedures for safeguarding special nuclear materials and your facility security precedures are exempt from disclosure; thr_refore, the enclosed inspection report will not be
- aced in the Public Document Rcom and will receive limited distribution.
No reply to this letter is required; however, should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
'0/ / '
/WY. ^s; / -
- akw
< > M~s Halter G. Martin, Chief Safeguards Branch 366 067 79M 2 001/ff
United fluclear Corporation 2
MAY 17 E79 Enciosure: Office of Inspection and Enforcement Irspection Report tiumber 79-09/70-820 (Contains 2.790 Info) cc (w report cover sheet):
D. F. Cronin, Manager, fluclear and Industrial Safety D. M. Schultz, Manager, Compliance
=
366 068