ML19225A735

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 70-1113/79-12 on 790409-12.Notice of Violation Withheld (Ref 10CFR2.790)
ML19225A735
Person / Time
Site: 07001113
Issue date: 05/14/1979
From: Kenna W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Alkema R
GENERAL ELECTRIC CO.
Shared Package
ML19225A733 List:
References
NUDOCS 7907200049
Download: ML19225A735 (2)


Text

4 g..Trt!4 InUZ"lTTED PHY E 15 CJ.'.AI!3N C7;;'.q.1 (D sT ATEs w

pa sta NUCLEAR REGULATORY COMYlSSION o

.,s c/; g REGION H g

101 M ARIE TT A sT REET, N.W.

y g

ATL ANT A, GEORGI A 30303 (g

r

% g%.'

f f

f llAY 141979 In Reply Refer To:

RII:ELC 70-1113/79-12 General Electric Company ATIN:

R. J. Alkema, General Manager Wilmington Manuf acturing Department P. O. Box 780 Wilmington, N C 28401 Gentlemen:

conducted by E. L. Clay of this office on inspection This refers to the SNM-1097 at of activities authorized by NRC Lim, e No.to the discussion of April 9-12, 19 79, General Electric Company, Wilmington, North Carolina av inspection.

our findings held with W. J. Hendry at the conclusion of tt The area exacined during this inspection was your prograe for safeguarding f

special nuclear r=terial under the applicable provisions of Title 10, Co Federal Regulations, Part 70, "Special Nucleat Within this area, the inspection consisted of ments of the above license.

interviews selective exa=inations of procedures and representative records, with personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your licens This item and references appear to be in noncompliance with NRC requirecents. listed in the Notice of Vio to pertinent requirementsThis notice is sent to you pursuant to the provisions are herewith as Appendix A.

f of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code o to this office, Section 2.201 requires you to submit within 20 days of your receipt of this notice, a written statement or explana-Federal Regulations.

(1) corrective steps which have been taken by you tion in reply including:

(2) corrective steps which will be taken to avoid and the results achieved; further noncompliance; and (3) the date when full co:pliance vill be echieved involving safeguards and security measures are exeept Details of activities

'Iberefore, your response from disclosure in accordance with 10 CFR 2.790(d).

should be incorporated in a separate paper and referenced in your reply.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice," P involving safeguards and Title 10, Code of Federal Pegulat ions, activities security measures are exempt f rom public disclosure; therefore, the enclos letter with the exception of the report cover page, which is an

,to, thisinspection summary, vill not be placed in the Public Docur ent Room.

,. - p.

366 d'

i40 y.TFR Tt'r'"TTr0 PV'lml

~.

D CDST.*M 2E'- l 7907200049

~.~ __ _ _ _ _.__ -_ _ _

F'h II.AirF".t TT": !TTED !!iFCll. H T

CC:.it.i::S 2.70 I:.i3. i:.TIDH 1

}lp 14 1979 General Electric Company,

Should you have any questions concerning this letter, we vill be glad to discuss them with you.

Siocerely, 5c B. Kenrja, Chief Safeguards Branch

Enclosures:

1.

Appendix A, Notice of Violation (Exempt from Disclosure) 2.

Inspection Report No. 70-1113/79-12 (Exempt from Disclosure) 3.

Inspection Summary (Not Exempt) te v/ encl:

A. L. Kaplan, Manager Licensing and Compliance Audits F. O. Box 780 Wilmington, N C 28401 C. M. Vaughan, Manager Nuclear Materials Management P. O. Box 780, Mail Code K-88 Wilmington, F C 28401

/

/

  • I

,e lt l

3bb

}47 dur: tTr rrm e Un 3H c : a. t:: :. n r. u.i.: s

.,