ML19225A203
| ML19225A203 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/13/1979 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| TXX-3009, NUDOCS 7907180552 | |
| Download: ML19225A203 (1) | |
Text
TEXAS UTILITIES GENERATING CO.TIInNY 20811 Elit\\ AN T()\\\\ F.lt L)Al.LAS. TEX AS 7*2201 July 13, 1979 R J GARY Mr. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch U. S. fluclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan Plaza Dr., Suite 1000 Docket Nos.50-44b Arlington, Texas 76C12 50-446 COMANCHE PEAVs STEAM ELECTRIC STATION 1981-83 2300 MW INSTALLATION PIPE SUPPORTS FILE NO.
10110
Dear Mr. Seidle:
On flay 18, 1979, we verbally informed your Mr. R. G. Taylor that pipe supports as presently designed may not meet seismic requirements.
"a considered this "potentially" reportable under 10 CFR 50.55(e).
We are continuing our investigation and evaluation and will notify you as soon as we have reached a conclusion.
Very truly yours, f
R. J.' Gary RJG:dla cc:
NRC Region IV - (0 + 1 copy)
Director, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.
U. S. Nuclear Regulatory Commission Washington, D. C.
20555
(%
790718so 346 059