ML19225A179

From kanterella
Jump to navigation Jump to search
Requests That Encl Cover Sheet Replace Current Cover Sheet for IE Insp Rept 50-456/79-05
ML19225A179
Person / Time
Site: Braidwood  
Issue date: 06/13/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
References
NUDOCS 7907180522
Download: ML19225A179 (2)


See also: IR 05000456/1979005

Text

T/C.s ,s

.

pm alcg

UNITE D STATES

,

)

[

og

NUCLEAR REGULATORY COMMISSION

y i c. . ( i ;

REGloN111

.'s

5 j {' l p

f

799 ADOSEVELT RO AD

.

9, g

a

cLEN ELLYN. ILLINOl5 60137

gvv....f

JUN 131979

_

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN:

Mr. Byron Lee, Jr.

Vice President

P. O. Box 767

Chicago, IL 60690

Gentlemen:

Please replace the cover sheet for inspection report

50-456/79-05; 50-457/79-05, from NRC Region III Reactor

Construction and Engineering Support Branch, with the

attached replacement.

The original was not signed.

Thank you.

Sincerely,

,YO'

!

G. Fiorelli, Chie

Reactor Construction and

Engineering Support Branch

Attachment:

As stated

cc w/ attachment:

Mr. R. Cosaro, Project

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General

?[ )

7

)7 gt /

r._ t{ '_.

i

p

7 907: Sos >>

I

h

U.S. NUCLEAR REGULATORY COMMISSION

OFFICL -Oi INSPECTION AND EhTORCEMENT

REGION III

-

Report No. 50-456/79-05; 50-457/79-05

Docket No. 50-456; 50-457

License No. CPPR-132; CPPR-133

Licensee:

Commonwealth Edison Company

P. O. Box 767

Chicago, IL 60690

Facility Name:

Braidwood Nuclear Power Station, Units 1 and 2

Inspection At:

Braidwood Site, Brsct tille, Illinois

Inspection Conducted:

April 19-;J and 26-27, 1979

[ - O ~7h

Inspectors:

C. E. Jo es

(April 19, 20, 26 and 27, 1979)

f$. S< vb

!

~ // - 7,9

P. A. Barrett

(April 19-20, 1979)

- M~

f

G. F.

x ell

(April 19-70, 1979)

kl hrf

Approved by:

R. C. Knop, Chief

V

[ - // - 77

Projects Section

Inspection Summary

Inspection _on April 19-20 and 26-27, 1979 (Reports No. 50-456/79-05;

50-457/79-03)

Areas Inspected: Electrical contractors quality assurance program

including organizational structure and personnel qualifications.

Implementing procedures for the program are scheduled for completion

in June 1979.

L. K. Comstock and Company, Incorporated, has been

granted interim approval by the licensee, his AE and the previous

electrical contractor to use the existing electrical procedures to

perform limited safety related activities. Resolved 23 previously

identified items of noncompliance and unresolved items. Completed

review of Reliance Truck t'ampany QA Program and implementing procedures.

The inspection involved a total of 55 inspector-hours onsite by

three NRC inspectors.

Results: No items of noncompliance or deviations were identified.

-