ML19225A179
| ML19225A179 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 06/13/1979 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Brian Lee COMMONWEALTH EDISON CO. |
| References | |
| NUDOCS 7907180522 | |
| Download: ML19225A179 (2) | |
See also: IR 05000456/1979005
Text
T/C.s ,s
.
pm alcg
UNITE D STATES
,
)
[
og
NUCLEAR REGULATORY COMMISSION
y i c. . ( i ;
REGloN111
.'s
5 j {' l p
f
.
9, g
a
cLEN ELLYN. ILLINOl5 60137
gvv....f
JUN 131979
_
Docket No. 50-456
Docket No. 50-457
Commonwealth Edison Company
ATTN:
Mr. Byron Lee, Jr.
Vice President
P. O. Box 767
Chicago, IL 60690
Gentlemen:
Please replace the cover sheet for inspection report
50-456/79-05; 50-457/79-05, from NRC Region III Reactor
Construction and Engineering Support Branch, with the
attached replacement.
The original was not signed.
Thank you.
Sincerely,
,YO'
!
G. Fiorelli, Chie
Reactor Construction and
Engineering Support Branch
Attachment:
As stated
cc w/ attachment:
Mr. R. Cosaro, Project
Superintendent
Central Files
Reproduction Unit NRC 20b
Local PDR
Mr. Dean Hansell, Office of
Assistant Attorney General
?[ )
7
)7 gt /
r._ t{ '_.
i
p
7 907: Sos >>
I
h
U.S. NUCLEAR REGULATORY COMMISSION
OFFICL -Oi INSPECTION AND EhTORCEMENT
REGION III
-
Report No. 50-456/79-05; 50-457/79-05
Docket No. 50-456; 50-457
License No. CPPR-132; CPPR-133
Licensee:
Commonwealth Edison Company
P. O. Box 767
Chicago, IL 60690
Facility Name:
Braidwood Nuclear Power Station, Units 1 and 2
Inspection At:
Braidwood Site, Brsct tille, Illinois
Inspection Conducted:
April 19-;J and 26-27, 1979
[ - O ~7h
Inspectors:
C. E. Jo es
(April 19, 20, 26 and 27, 1979)
f$. S< vb
!
~ // - 7,9
P. A. Barrett
(April 19-20, 1979)
- M~
f
G. F.
x ell
(April 19-70, 1979)
kl hrf
Approved by:
R. C. Knop, Chief
V
[ - // - 77
Projects Section
Inspection Summary
Inspection _on April 19-20 and 26-27, 1979 (Reports No. 50-456/79-05;
50-457/79-03)
Areas Inspected: Electrical contractors quality assurance program
including organizational structure and personnel qualifications.
Implementing procedures for the program are scheduled for completion
in June 1979.
L. K. Comstock and Company, Incorporated, has been
granted interim approval by the licensee, his AE and the previous
electrical contractor to use the existing electrical procedures to
perform limited safety related activities. Resolved 23 previously
identified items of noncompliance and unresolved items. Completed
review of Reliance Truck t'ampany QA Program and implementing procedures.
The inspection involved a total of 55 inspector-hours onsite by
three NRC inspectors.
Results: No items of noncompliance or deviations were identified.
-