ML19225A141

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for June 1979
ML19225A141
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/11/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19225A142 List:
References
NUDOCS 7907180469
Download: ML19225A141 (1)


Text

a c.m e..

,1 3.

c.

- --,,~ '

y# \\;

.a

- :,.:s w w m

F. L CLA ON. JR.

Alabama power July 11, 1979 Director, Office of Management Inf ormation and Pro,; ram Control U.

S. Nuclear Regulatory Commission

.Ja s hing ton, D.C.

20555 RE:

Joseph M. Farley Nuclear Plant Unit No. 1 Docket No. 50-348 Monthly Operating Data Report

Dear Sir:

Attached are two (2) copies of the June, 1979 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 1, as required by Section

6. 9.1. 6 of the Appendix A Technical Specifications.

As requested by letter from Mr. John F.

Stolz to Mr. Alan R.

Barton, dated October 21, 1977, a "Narracive Su= mary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Very truly yours,

, w_.-

,e

- g-f j c.w 6&G '

F.-L.

Clayton, Jr.

FLCJ r / r.._.: bhj Attachment cc: Director, IE (10 copies)

Director, RII (1 copy)

Mr. Ted Cintula (1 copy) 4 e

/;

b \\

t 7907186P4 347 103