Forwards IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. Action Required
ML19224D655
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/02/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 7907130297
Download: ML19224D655 (1)


Text

[,km R E G'o, UNITED STATES

  • ! .
  • _, 7 ' 7, NUCLEAR REGULATORY COMMISSION 5-REGION 111
  • ^

J

'o,, h bf'f 799 ROOSEVELT RO AD

% ' be e'

GLEN E LLYN, ILLINOls 60137 JUI.

2BN Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN:

Mr. Sol Burstein Executive Vice President Power Plants 231 West Michigan Milwaukee, WI 53201 Gentlemen:

The enclosed IE Bulletin No. 79-14 is forwarded to you for action.

Written responses are required.

If you desire additional information regarding this matter, please contact this office.

Sincerely,

$1fnube a

James G. KeppV3f Director

Enclosure:

IE Bulletin No. 79-14 cc w/ enc 1:

Mr. G. A. Reed, Plant Manager Central Files Director, NRR/DPM Director, NRR/ DOR C. M. Tremmel, ORB /NRR PDR Local PDR NSIC

/ TIC Sandra A. Bast, Lakeshore Citizens for Safe Energy

/

<)<,?)

(F 790713020'7 a i H

U.S. NUCLEAR REGU!ATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION III July 2, 1979 IE Bulletin No. 79-14 SEISMIC ANALYSES FOR AS-BUILT SAFETY-RELATED PIPING SYSTEMS Description of Circumstances:

Recenty twe issues were 1.entified which can cause seismic analysis of safety-related piping systems to yield nonconservative results. One issue involved algebraic summation of loads in some seismic analyses.

This was addressed in show cause orders for Beaver Valley, Fitzpatrick, Maine Yankee and Surry.

It was also addressed in IE Bulletin 79-07 which was sent to all power reactor licensees.

The other issue involves the accuracy of the ir. formation input for seismic analyses.

In this regard, several potentially unconservative factors were discovered and subsequently addressed in IE Bulletin 79-02 (pipe supports) and 79-04 (valve weights). During resolution of these concerns, inspection by IE and by licensees of the as-built configuration of several piping systems revealed a number of nonconformances to design documents which could potentially affect the validity of seismic analyses. Nonconformances are identified in Appendix A to this bulletin.

Because apparently significant no1-conformances to de fen documents have occurred in a number of plants, this issue is generic.

The staff has detemined, where design specifications and drawings are used to obtain input information for seismic analysis of safety-related piping systems, that it is essential for these documents to reflect as-built con-figurations. Where subsequent use, damage or modifications affect the con-dition or configuration of safety-related piping systems as described in documents from which seismic analysis input information was obtained, the licensee must consider the need to re-evaluate the seismic analyses to con-sider the as-built configuration.

g.-

I DUPLICATE DOCUMENT Entire document previously entered fj[

0 into system under:

L h

ANO 7 DCb&2I No. of pages:

% - e.'im, w.e.e

-,:.n.e,,

-..ne

.=. & m.Lr

~O

-A