ML19224D523

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-13, Cracking in Feedwater Sys Piping. Licensee Action Required
ML19224D523
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/25/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
References
NUDOCS 7907120487
Download: ML19224D523 (1)


Text

'

[

'o LNITED STATES

[ yg r,c

';; J,f N'-b [ ^I NUCLEAR REGULATORY COMMISSION 2

/.

REGION I S ' f*

5

[

631 PARK AVENUE D

,o KING OF PRUSSI A, PENNSYLVANI A 19406 June 25, 1979 Docket No. 50-213 Connecticut Yankee Atomic Power Company ATTN:

Mr. W. G. Counsil Vice President - Nuclear Engineering and Operations P. O. Box 270 Hartford, Connecticut 06101 Gentlemen:

Enclosed is IE Bulletin No. 79-13 Which requires action by you with regard to your power reactor facility (ies) with an operating license.

Should you have any questions regarding this Bulletin or the actions required by you, please contact this office.

Sincerely,

^/

f Boyce H. Grier Director

Enclosures:

1.

IE Bulletin No. 79-13 w/ Attachments 2.

List of IE Bulletins Issued in Last Twelve Months cc w/encls:

R. Graves, Plant Superintendent D. G. Diedrick, Manager of Quality Assurance J. R. Himmelwright, Licensing Safeguards Engineer n

J 7 9 071c 0 </g7 348 095

ENCLOSURE 1 UNITED STATES NUCLEAR REGULATORY C0f' MISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 IE Bulletin No. 79-13 Date: June 25, 1979 Page 1 of 4 CRACKING IN FEEDWATER SYSTEM PIPING Description of Circumstances:

On flay 20, 1979, Indiana and flichigan Power Company notified the NRC of cracking in two feedwater lines at their D. C. Cook Unit 2 facility.

The cracking was di. overed following a shutdown on May 19 to investigate leakage inside containment.

Leaking circumferential cracks were identified in the 16-inch feedwater elbows adjacent to two steam generator nozzle elbow welds.

Subsequent radiographic examination revealed crack indications in all eight steam generator feedwater lines at this location on both Units 1 and 2.

On May 25, 1979, a letter was sent to all PWR licensees by the Office of Nuclear Reactor Regulation which informed licensees of the D. C. Cook failures and requested specific information on feedwater system design, fabrication, inspection and operating histories.

To further explore the generic nature of the cracking problem, the Office of Inspection and Enforcement requested licensees of PWR olants in current outages to immediately conduct volumetric examination of certain feedwater piping welds.

As a result of these actions, several other licensees with Westinghouse steam generators reported crack indications.

Southern California Edison reported on June 5,1979, that radiographic examination revealed indications of cracking in feedwater nozzle-to-piping welds on two of three steam generators of San Onofre Unit 1.

On June 15, 1979, Carolina Power and Light reported that radiography showed crack indications in similar locations at their H. B. Robinson Unit 2.

Duquesne Power and Light confirmed on June 18, 1979,.that radiography has shown cracking in their Beaver Valley Unit 1 feedwater oiping to vessel nozzle weld.

Public Service Electric and Gas Company reported on June 20, 1979 that Salem Unit I also has crack indications.

Misconsin Public Service company decided on June 20, 1979 to cut out a feedwater nozzle-to-pipe weld which contained questionable indication, for metallurgical examination.

As of June 22,1979 and since May 15, 1979 seven other PWR facilities have inspected the feedwater nozzle-to-pipe welds without finding cracking indications.

The feedwater nozzle-to-pipe configurations for D.C. Cook and for San Onofre are shown on the attached figures 1 and P A tvnical feedwa ter. nine-to-no7719,_.

_.m g

weld joint detail showing the princi g

=

,I are shown on the attached figure 3.

IDUPLICATE DOCUMENT

^

On March 17, 1977, during heat-up foi Entire document previourly entered

'+

Unit 1, a leak was discovered in the

' into system under:

the 16-inch diameter feedwater pipin-

'7 0 lo e O N / S-S g

nondestructive examination of all no:

ANO

// 3 R 096 [

No. of pag;s:

r a.

..