Submits Written Record of 790524-25 Actions Re TMI Event: Reviewed Results of Electrical Insp of 790508-11 & Receipt of Electrical Van for Control of Decay Heat Removal Sys
ML19224D010
Person / Time
Site: Crane 
Issue date: 05/31/1979
From: Finkel A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
TASK-TF, TASK-TMM NUDOCS 7907100464
Download: ML19224D010 (1)


Text

V

' r ' }/ W / ~/

May 31, 1979

[

/

MEMORANDCM FOR: Boyce H. Grier, Director FROM:

A. E. Finkel, Reactor Inspector, RC&ES Branch, Unit #2

SUBJECT:

REPORT OF ACTIVITIES AT THREE MILE ISI.AND

Reference:

Regional Announcement No. 79/20 Time at 51 The inspector arrived at TMI at 1030 on May 24, 1979 and lef t at 1330 on May 25, 1979 for a total of 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br />.

Su=marr of Activities The inspector reviewed the results of the electrical inspection of May 8-11, 1979 and the receipt of the electrical van (task TS-15) for the control of the back-up Decay Heat Removal System.

Coc=ents Items identified in report of May 8-11, 1979 have been corrected by the licensee.

The instrument van is scheduled for completion by June 20, 1979.

In discussicas with the licensee, they do not plan to perform a system test between the DHR electrical van and the piping and pump /cotor sicid.

Coc=ents IE/NRC The inspector identified the ites of the DER system as not receiving a system test to NRR and IE personnel at the site.

NRR stated that they will evaluate the requirement for system testing of the DHR system and the electrical van system.

L-A. E. Finkel Reactor Inspector RC&E3 Branch cc:

S. D. Ebneter G. A. Walton 2

299 7 90710096N Cr i