May 31, 1979
[
/
MEMORANDCM FOR: Boyce H. Grier, Director FROM:
A. E. Finkel, Reactor Inspector, RC&ES Branch, Unit #2
SUBJECT:
REPORT OF ACTIVITIES AT THREE MILE ISI.AND
Reference:
Regional Announcement No. 79/20 Time at 51 The inspector arrived at TMI at 1030 on May 24, 1979 and lef t at 1330 on May 25, 1979 for a total of 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br />.
Su=marr of Activities The inspector reviewed the results of the electrical inspection of May 8-11, 1979 and the receipt of the electrical van (task TS-15) for the control of the back-up Decay Heat Removal System.
Coc=ents Items identified in report of May 8-11, 1979 have been corrected by the licensee.
The instrument van is scheduled for completion by June 20, 1979.
In discussicas with the licensee, they do not plan to perform a system test between the DHR electrical van and the piping and pump /cotor sicid.
Coc=ents IE/NRC The inspector identified the ites of the DER system as not receiving a system test to NRR and IE personnel at the site.
NRR stated that they will evaluate the requirement for system testing of the DHR system and the electrical van system.
L-A. E. Finkel Reactor Inspector RC&E3 Branch cc:
S. D. Ebneter G. A. Walton 2
299 7 90710096N Cr i