Forwards IE Circular 79-10, Pipefittings Mfg from Unacceptable Matl. No Action Required
ML19224C631
Person / Time
Site: 05000580, 05000581
Issue date: 06/26/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Ziants C
OHIO EDISON CO.
References
NUDOCS 7907060002
Download: ML19224C631 (1)


Text

R R f C(f

!gk bC,

'o, UNITED ST ATES E ',,..-

(

NUCLEAR REGULATORY COMMISSION REGION 111

J\\ h.c

_[

799 ROOSEVELT RO AD O,

A h,'N+'

f GLEN ELLYN, lLLINOIS 60137

  • ...+

Pre-CPP JUN 2 61979 The Ohio Edison Company ATTN:

Mr. Cbarlie Ziants Chief Nuclear QA Engineer 76 South Main Street Akron, 011 44308 Gentlemen:

This Circular is provided as an early notification of a possibly signif-icant matter.

It is expected that recipients will review the information for possible applicability to their facilities.

No specific action or response is requestad at this time.

If further NRC evaluations so indi-cate, an IE Bulletin will be issued to recommend or request specific licensee actions.

If you have questions regarding this matter, please contact the Director of the appropriate NRC Regimnal Office.

Sincerely,

'a b -

1 James G. Keppler Director

Enclosure:

IE Circular No. 79-10 cc w/ encl:

Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR j

NSIC TIC Harold W. Kohn, Power Siting Commission 19070600DE n a (; 0'[

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION III June 26, 1979 IE Circular No. 79-10 (7906200171)

PIPEFITTINGS MANUFACTURED FROM UNACCEPTABLE MATERIAL Description of Circumstances:

Liberty Equipment and Supply Company of Kennewick, Washington and Tube Turns Division, Chemetron Corporation of Louisville, Kentucky reported on April 4 and 12, 1972, respectively, that potentially defective pipe fittings were manufactured frce material with a high carbon content beyond the range allowed by ASTM A-234 WPB.

These high carbon content fittings may crack when welded.

Tube Turns received 3.500 OD x.250W pipe from U. S. Steel - Lorain -

identified as U. S. Steel Heat No. N570028.

A total of 28,153 feet was received and identified by Tube Turns as Lot W6719.

U. S. Steel has not been able to determine the exact number of lengths of pipe of incorrect chemistry, but indicated it could be at least four lengths. From this pipe, 4" - 90 degrees and 45 degrees

.237 wall elbows and 2"

.237 vall straight tees, ASTM A-234.;PB, were produced by Tube Turns.

Each length of pipe is twenty feet and makes from 20 to 30 fittings. Approximately 27,000 fittings were produced and each is identified by Tube Turns Lot No. W6719.

Shipment of thece fittings started in March of 1978, and it is estimated all were shipped before the end of 1978.

On May 10, 1979, the Tube Turns Division reported to the NRC that 4" elbows, Lot W6719, have been provided to the nuclear power plants listed below.

U.S.

Steel has tested about one hundred and fifty (150) loose and installed fittings at the seven sites noted by an asterisk.

  • Grand Gulf
  • Zimmer
  • Phipps Bend
  • Waterford III
  • Brown's Ferry Midland Limerick Shoreham
  • LaSalle Sequoyah
  • Brunswick Hartsville Bellefonte On June 1, 1979, the Tube Turns Division reported to the NRC via telephone that of the 160 fittings tested at Nuclear Power Plants, three (3) pieces were found to have a high carbon content and were replaced.

All construction permit holders are advised to conduct a review of their pipefitting receiving documents for the 1;;~ ~

- - - - " """-~""

""~

and determine if fittings manufactured b:l DUPLICATE DOCUMENT identified as Tube Turn Lot W6719.