ML19224C479
| ML19224C479 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 06/20/1979 |
| From: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| References | |
| NUDOCS 7907020444 | |
| Download: ML19224C479 (1) | |
Text
~'?
CENTRAL FILES PDR:HQ fa a'cd R
g-p UNITED STATES g
NUCLEAR REGULATORY COMMISSION
$ :)^
- /.- l 3
(
NSIC o
REGION IV
+# [o',8 611 RYAN PLAZA DRIVE SUITE 1000 S'
ARLINGTON, TEXAS 76012
'99
+....
June 20, 1979 Docket No.
50-298 Nebraska Public Power District ATTN:
J. M. Pilant, Director Licensing & Quality Assurance Post Office Box 499 Columbus, Nebraska 68601 Gentlemen:
This IE Information Notice is provided as an early notification of a possibly significant matter. It is expected that recipients will review the informa-tion for possible applicability to their facilities.
No specific action or response is requested at this time. If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licensee actions.
If you have questions regarding this matter, please contact the Director of the appropriate NRC Eegional Office.
Sincerely,
+
%L.'
'Karl V. Seyfrit Director
Enclosures:
1.
IE Information Notice No. 79-17 2.
List or IE Information Notices Issued in 1979 c c. :
L. C. Lessor, Superintendent Cooper Nuclear Station Post office Box 98 Brownville, Nebraska 68321
') 7 ? 3
- wHll Li u
OYYf q
UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 IE Information Notice No. 79-17 Date:
June 20, 1979 Page 1 of 2 SOURCE HOLDER ASSEMBLY DAMAGE FROM MISFIT BETWEEN ASSEMBLY AND REACTOR UPPER GRID PLATE Description of Circumstances:
Recently, the NRC was informed of a problem at two 6::tinghouse PWR facilities resulting from an apparent misfit between secondary source holder assemblies and the reactor upper grid plate.
The misfit problem was first identified by Carolina Power & Light, licensee for H. B. Robinson Unit 2, who informed the NRC on May 6,1979, of the circum-stances. During the current refueling outage at H. B. Robinson 2, CP&L deter-mined that two secondary source holder assemblies had been damaged during the previous refueling in February 1978, by a misfit between the assembly and the reactor upper grid plate.
The misfit resulted from insufficient clearance (i.e. 1/2 to 3/4 inch) between the source holder assembly hub and the grid plate at the core locations contaiaing thermocouple mixing vanes. This lack of sufficient clearance caused minor deformation of the upper grid plate components at the core location and of the source holder assemblies.
The deformation also resulted in some bending of the fuel rods in the assembly, however, in no case did this bending result in fuel claddiag perforation.
On May 16, 1979, the licensee of D. C. Cook Unit 1 informed the NRC that the present refueling outage would be extanded 15 to 20 days to remove the reactor head, which had already been reinstalled following completion of refueling, to correct this misfit problem. They learned of the problem from Westinghouse.
Subsequently, the licensee's inspection revealed that the source holder assembly hubs were in contact with the vanes.
The source holder was removed from one assembly readily with no apparent damage, while in the other, the source holder was found stuck in the assembly.
The problem was corrected prior to return to operations.
The secondary source assembly rods are normally inserted into rod cluster control assemblies and placed at symmetrical locations in the core.
Each such assembly contains a symmetrical grouping of four secondary source rods and between zero and twenty burnable poison rods.
Locations in the assembly not filled with a source or burnable poison rod contain c
"~
- T A A -i--ISini n clearance for these source holder asser.
DUPLICATE DOCUMENT locations which contain thermocouple m 002 Entire document previously entered i
into system under:
bh hh d ))h ANO No. of pages:
k
_m _ _