- ga asc,%,
o
(
UNITED S7ATES y \\*,g g NUCLEAFI REGULATORY COMMISSION Tg
'"f -
c REGION lli f [f 799 ROOSEVELT ROAD o
h
.% /
GLEN ELLYN, ILLINOIS 60137
... +.
JUN g 01979 Docket No. 50-409 Dairyland Power Cooperative ATTN:
Mr. F. W. Linder General Manager 2615 East Avenue - South La Crosse, WI 54601 Gentlemen:
This Information Notice No. 79-17 is provided as an early notification of a possibly significant matter.
It is expected that recipients will review the information for poseible applicability to their facilities.
No specific action or response is requested at this time.
If further NRC evaluations so indicate, an IE Circular or Bulletir. will be issued to recommend or request specific licensee actions.
if you have questions regarding this matter, please contact the Director of this office.
Sincerely, Qb
(/ James G. Kepp er Director
Enclosure:
IE Information Notice No. 79-17 cc w/ encl-Mr. R. E. Shimst'ak, Plant Superintendent Central Files Director, N1R/DPM Director, NPS/ DOR PDR Local PDR NSIC TIC Anthony Roisman, Esq.,
.e Attorney
V~ ' D' 271 316 7907020YRv S i
U.S. NUCLEAR REGULATORY CO?CfISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION III June 20, 1979 IE Information Notice No. 79-17 SOUFCE HOLDER ASSEMBLY DAMAGE FROM MISFIT BETWEEN ASSEMBLY AND REACTOR UPPER GRID PLATE Description of Circumstances:
Recently, the NRC was informed of a problem at two Westinghouse PWR facilities resulting from an apparent misfit between secondary source holder assemblies and the reactor upper grid plate.
The misfit problem was first identified by Carolina Power & Light, licensee for H. B. Robinson Unit 2, who informed the NRC on May 6, 1979, of the circu=-
stances. During the current refueling outage at H. B. Robinson 2. CP&L deter-mined that two secondary source holder assemblies had been damaged during the previous refueling in February 1978, by a misfit between the assembly and the reactor upper grid plate. The misfit resulted from insufficient clearance (i.e. 1/2 to 3/4 inch) between the source holder assembly hub and the grid plate at the core locations containing thermocouple mixing vanes. This lack of sufficient clearance caused minor deformation of the upper grid plate com-ponents at the core location and of the source holder assemblies. The deforma-tion also resulted in some bending of the fuel rods in the assembly, however, in no case did this bending result in fuel cladding perforation.
On May 16, 1979, the licensee of D. C. Cook Unit 1 informed the NRC that the present refueling cutage would be extended 15 to 20 days to remove the reactor head, which had already been reinstalled following completion of refueling, to correct this misfit problem. They learned of.the problem from Weatinghouse.
Subsequently, the licensee's inspection revealed that the source holder assembly hubs were in contact with the vanes. The source holder was removed from one assembly readily with no apparent damage while in the other the source holder was found stuck in the assembly. The problem was corrected prior to return to operations.
The secondary source assembly rods are normally inserted into rod cluster control assemblies and placed at symmetrical locations in the core. Each such assembly contains a symmetrical grouping of four secondary source rods and between zero and twenty burnable poison rods. Locations in the assenbly not filled with a source or burnable poison rod contain a thimble plug. The lack of sufficient clearance for these source holder assembli
/
only at the core locations which co f_
i DUPLICATE DOCUMENT _
document Previously entered Entir(
tem under,.
into s, 2
0 ANO No. of Pages-O