ML19224C075
| ML19224C075 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/16/1979 |
| From: | Jay Collins Office of Nuclear Reactor Regulation |
| To: | Rusche B METROPOLITAN EDISON CO. |
| References | |
| NUDOCS 7906280227 | |
| Download: ML19224C075 (1) | |
Text
i h.
j
[gamcq%
UNITEo STATES c
Ow[, '
NUCLEAR REGULATORY COMMISSION N.
g j I WASm N G TON. D. C. 20sss r:
s/
- e" May 1 (2, 1979 7
MEMO PANDUM FOR:
B. Rusche FROM-J.
Collins i-
SUBJECT:
HYDROLOGIC CRITERI A FOR PROPOSED INTERIM SOLID WAS T I S TO RAG E AR EA The proposed location for interim storage of solid waste generated from the operation of EPICORE 11 is the Unit 2 desilting basin, located in the SE area of the station.
Met-Ed must provide assurance that le maximum expected precipitation during the 1ifetime (about 4 mont,) of the facility will not result in "ponding" which will jeopardize the intbgrity of the facility.
To that end, Met-Ed shall provide an analysis of potential "pi.iding" in the desilting basin due to the maximum expected precipitation and assuming no blockage of the drainage system. Met-Ed shall also consider acministrat ive controls such as periodic checks of the drainage system and provisions for backup pumping to minimize the potential for "ponding" during the expected 4 month life of the storage facility.
T.
Collins cc:
R. Vol 1mer R. Wel l e r K. Pastor R. Williams J. Logan 253 099 19062804 27
-