Forwards Complete Compilation of Emergency & Special Operating Procedures 790329-0508.Procedures Are Categorized by Present Status
ML19224C007
Person / Time
Site: Crane 
Issue date: 05/08/1979
From: Wilson R
GENERAL PUBLIC UTILITIES CORP.
To:
GENERAL PUBLIC UTILITIES CORP.
References
TSG-155, NUDOCS 7906280162
Download: ML19224C007 (6)


Text

'

Inter-Office Memorandum

~

.f 1 A

Date May 5, 1979 f

[LR jService

'8"-'"

Sut:ect Emergency and Special Operating Procedures To Distribution Locat'on Dil Since March 29 a number of emergency and special operating procedures have been developed and put into pla...

for Unit 2.

Attached is a complete compilation of these prccedures with their status as of 5/8/79.

The status is broken down into four categories:

1.

Approved orocedures which have been reviewed and found to be applicable under current operating conditions.

2.

Procedures previously approved but cancelled due to inapplicability.

3.

Approved nrocedures but requiring update to reflect current plant conditions or new data.

4.

Procedures current Ly being devel

' for initial issue.

P.\\ h--

A. F. Wilson RF"w'/m rh Attachments Distribution:

R. C. Arnold D.

K.

Croneberger C.

P. Deltete B. D.

Lic D. M. Herbein G. Kunder J.

P. Moore M.

P. Morrell D. G.

Slear D. C. McIntire E. G. Wallace 79 828 N2 258 028 GPU Serv ce Carocra:an is a subc.c ary of General Put!:c U:i t es Corporabon b

Appcod1x 1 APPROVED PROCEDURES WHICH DVE BEEN REVIEWED AND FOUND TO BE APPLICABLE UNDER CUIREST OPERATING CONDITIONS EP's EP-5, Rev. 1-Los of Letdown EP-12, Rev.

0-Loss of Instrumentation for RCS Pressure EP-13, Rev. 0-Loss of Inst. for RCS Temperature EP-19, Rev. 1-RC-V2 Stuck Closed EP-20, Rev. 1-RC-V137 Stuck Closed EP-22, Rev. 1-Loss of Pzr. Temp. Indication EP-23, Rev. 0-Loss of OTSG Pressure Indication EP-24, Rev. 0-Responses to H, Recombiner Alarms EP-26, Rev. 0-Action on RB Pressure Lesa than - 2 psig EP-34, Rev.

1-Loss of Nat. Circulation SOP's (Z Procedures)

Z-1, Rev. 0 - Procedure for CF System Isolation Valve Prevent Close Interlock Z-2, Rev. 2 - Discharge of WDG-T 1A(B) to Rx Bldg.

Z-3, Rev. 0 - Moveable Incore Detector Insertion / Withdrawal Z-4, Rev. 0 - Transfer of RCBT from TMI-2 to RCBT TMI-l Z-5, Rev. 1 - Sample WDG T-1B Z-6, Rev. 0 - Pressurizer Degas Procedure Z-7, Rev. 0 - Procedura for Leak Checking Recombine: Flanges Z-8, Rev. 0 -

W-G System Troubleshooting Z-9, Rev. 3 - Sampling MU-T-1 Z-10, Rev. 3 - Venting MU Tank Gas Space to Vent Header Z-11, Rev. 0 - Procedure for Leak Checking Spare Recombiner Flanges Z-12, Rev. 2 -

H, Recombiner Operation Z-19, Rev. 0 - RUplacement of HPR-219 and HPR-228 Filters Z-20, Rev. 0 - Reactor Building H Sampling Z-29, Rev. 0 - Filling Boric Acid.ix Tank Z-30, Rev. 0 - Functional Test of Standby RCP's Z-31, Rev. 0 - Installation of Jog Control for DH-V4 A/B Z-32, Rev. 3 - Venting Make-Up Tank to RB Z-33, Rev. 0 - Water Sump Discharges to Ind. Waste Treatment & Filter System Z-34, Rev. 0 - Alternate Filling of the NaOH Tank Z-35, Rev. 0 - Waste Gas Decay Tank Pressure Remote Indication Z-36, Rev. 1 - Incore Thermocouple Noise Z-37, Rev. 1 - Alternate Per. Level Indication Gauge Installation Z-44, Rev. 1 -

Incore Instrumentation Z-46, Rev. 0 - Sewage Disposal Z-50, Rev. 7 - Test of Alternate Pressurizer Level Z-51, Rev. 2 - Liquid Release from TMI Z-53, Rev. 0 - Reduction of Iodine Levels in Aux. B]dg. NaOH & Thio. Sol.

Z-54, Rev. 0 -

Increase Letdown Flow by Throttling ICCW Flow Z-56, Rev. 0 - Jog Control for IC-VIA/B Z-57, Rev. 3 - Pressure Reduction during Degas Z-59, Rev. 0 - Transferring Secondary Water to Unit #1 Z-61, Rev. 0 - Jog Control for RC-V2 Z-64, Rev. 0 - tiR-V51A/B Jog Control Z-65, Rev. 0 - Liquid Rad-Mon. Calibration Z-66, Rev. 0 -

Rad. Mon. Calib. G-M Tube Area Monitors a

258 0M

Approved Procedures 2

Found to be Applicable i

SOP's (Cont.)

Z-67, Rev. 0 - Atmos. Rad. Mon. Calib.

Z-68, Rev. 0 - Incore Instr-Computer Input Mod.

Z-69, Rev. 2 - Transfer of Misc. Waste to RCBT Z-70, Rev. 2 - RCS Sampling Manual Z-73, Rev. 0 - Alternate OTSG Level Indication Z-75, Rev. 0 - Increase Letdown Flow by Raising Letdown Cooler Temp &

Bypassing Letdown Purification Demin.

Z-76, Rev. 0 - WDL-P-15A Press. Switch and Control SW. Bypass Z-77, Rev. 0 - Repack or Add Packing to RR-PLA/B/C/D Z-80, Rev. 1 - PZR Heater Cable Dryout Z-81, Rev. 0 - Chemical and Radiochemical Sampling and Analysis Proced.

Z-82, Rev. 0 - Alternate PZR Level Hydrotest Z-84, Rev. 0 - Installation of Temporary Isolation Transformers for Selected PZR Heaters Z-86, Rev. 0 - Transfer of MWHT to Concentrate Waste Tank Z-88, Rev. 0 - Power Range UIC Current Measurement Z-89, Rev. 1 - Operation of Vacuum Pump Discharge Filter Z-90, Rev. 0 - Fuel Handling Bldg. Roll Door Opening Z-93, Rev. 1 - RB Sump Level Measurement Z-95, Rev. 2 - RCS Sampling for Toal Gas (Manual)

Z-96, Rev. 0 - Thermocouple II.Jication/ Recording in Control Room Z-98, Rev. 0 - Aux. Bldg. Exhaust Filter (s) Changeout Z-99, Rev. 0 - Transfer of Unit II WDL-T-8 A/B to Neutralizer Feed Tank Z-104, Rev. 0 - Low Range T u e n cation H

Z-107, Rev. 0 - Test Method #2 for Alternate PZR LVL.

Z-109, Rev. 0 - Eberline Stack Monitor Data Collection Z-lll, Rev. 0 - Installation / Hydro Testing / Operation of FW System Bypass Y

258 UK

t Appendix 2 PROCEDURES PREVIOUSLY APPROVED BUT CANCELLFD DUE TO INAPPLICABILITY EP's EP-1, Rev. 0 - Loss of RCP-LA EP-2, Rev. 0 - Loss of RCP-1A & 2A EP-3, Rev. 0 - Loss of all RCP's; Go to Natural Circulation EP-4, Rev. 0 - Loss of all RCP's and No Natural Circulation.

Go to HPI EP-14, Rev. 0 - Loss of RCS Flow Indication SOP's Z-45, Rev. 0 - Emergency Power Feed for Valves RC-V2 and RC-V137 Z-49, Rev. 0 - Excore Detector Noise Analysis & Measurement Z-62, Rev. 0 - Alternate PZR Level Hydro Test Z-78, Rev. 0 - Blowdown of Misc. Waste Storage Tank Level Transmitter e

=

258 03; l

-m

Appendix 3 APPROVED PROCEDURES BUT REQUIRING UPDATE TO REFLECT CURRENT PLANT CONDITIONS OR NEW DATA EP's EP-6, Rev. 1 - RCP Seal Failure EP-7, Rev. 2 - Loss of Offsite Power EP-21, Rev. 5 - Total Loss of Pzr. Level Indication EP-29, Rev. 0 - Loss of Condenser Vacuum SOP's Z-48, Rev. 1 - Cond. Pump Flow Test through the Emergency F.P.

Z-63, Rev. 0 - Control of RCS Press. with Solid PZR For all above procedures, the next higher evision number has been written and is in review circuit.

=

~

258 032

s.

Appendix 4 PROCEDURES CURRENTLY BEING DEVELOPED FOR INITIAL ISSUE EP's EP-8, Rev. 0 - Loss of MUT Level EP-9, Rev. 0 - Loss of MU Puups & llPI EP-15, xev. 0 - Loss of OTSG Level Indication EP-16, Rev. 0 - Loss of Source Range Instrumentation EP-17, Rev. 0 - RC-V137 Stuck Open EP-18, Rev. 0 - RC-V2 Stuck Open EP-27, Rev, 0 - Site Evacuation EP-28, Rev. 0 - Control Room Evacuation EP-33, Rev. 0 - Core Cooling Without RCP's or Natural Circulation EP-35, Rev. 0 - Loss of Instrument Air and Service Air SOP's 2-28, Rev. 0 - OTSC Level Control while Feeding through the Aux. Feed Nozzle Z-39, Rev. 0 - Natural Circulation Operation Z-58, Rev. 0 - CFT Float Solid Plant Operation - will be EP Z-87, Rev. 0 - Transition of A OTSG to Solid Water Mode Z-92, Rev. 0 - Calc. of Letdown Flow Rate Using MUT Mass Balance Z-103, Rev. C - Water / Water Cooling for "B" OTSG Z-108, Rev U - Airborne Iodine and Pr ticulas lampling Method Z-110, Rev. 0 - Putting "B" OTSG in Solid Cool:.ng Mode - will be EP Z-ll3, Rev. 0 - Temporary FW Bypass Operation & Installation on "B" OTSG Z-115, Rev. 0 - RCS Pressure Control Using a Decay Heat Removal Pump - will be EP

+ New Installed Systems 258 033

-