Summary of 781106-09,11 & 12 Operations Review Committee Meeting 293 Re New Operating Procedures & Changes,Plant Mods Reportable Violations & Plant Operations.Supporting RO Documentation Encl
ML19224B557
Person / Time
Site: Crane Constellation icon.png
Issue date: 11/12/1978
From: Hilbish J, Seelinger J, Warren R
Metropolitan Edison Co
To:
Metropolitan Edison Co
References
TM-0661, TM-661, NUDOCS 7906150308
Download: ML19224B557 (14)


Text

!

TMI DOCUMENTS TM-%6J DOCUMEtE NO:

COPY MADE ON

[J 7Y OF DOCUMENT PROVIDED BY METROPOLITAN D ON COMPANY.

Supervis'of, Document Control, NRC 6

6 O

MCG I 60 30.8

[ } f3 [J U /-

e

      • '?*
  • m a

w

,s.. W m

,. 9% *:. fr -

m w ( K'1

~~"'m o64&*

  • W

'W*

FEIROPOLYrAN EDISON CJMPANY

] f()

'IHREE MILE ISIn'D NUCLEAR STATICU IMIT #2 OPERATIONS REVIEW CMurrE h m ;G #293 Noverber 6, 7, 8, 9, 11 and 12, 1978 I.

Meetincs Ibte Tine bhrbers Items Discussed 11/6 1000-1030 (p) J. L. Seelinger (C)

Plant bbdifications (p) R. P._Warrert _

(p) R._ W. Bensel

- (a) T. E. bbrck (a) J. R. Paules 11/ 7 1200-1230 (p) J. L. Seelinger (C)

FORC Iters (p) R. P. Warren (p) J. R. Floyd (a) T. E. Morck (a) W. J. bbrshall 11/8 1430-1500 (p) J. F. Hilbish (V-C)

PORC Items (p) I. D. Porter Plant bbdifications

  • (p) R. P. Warren
  • (p) R. E. Sieglitz
  • (a) D. B. Jenkins
  • (a) J. R. Paules
  • (a) T. E. hbrck M. B. Bezilla 11/9 0745-0815
  • (p) J. L. Seelinger (C)

PORC Items 1615-1730

.p) J. F. Hilbish (V-C) (0745-Plant Modifications 0815) Reportable occurrences /

  • :p) R. P. Warren (V-C)

(1615-Violations 1730)

(p) I. D. Porter

  • (p) R. W. Bensel
  • (a) J. A. Brtr:mer
  • (a) T. A. O' Conner
  • (a) T. E. bbrck
  • (a) D. B. Jenkins
  • i a) M. L. ':enson M. B. Bezilla 11/11 1600-1630 (p) J. L. Seelinger (C)

Plant b'-di.f'

cions (p) I. D. Porter (p) R. E. Sieglitz (a) J. A. BrunTr (a) T. E. bbrck 11/12 1000-1030 (p) J. L. Seelinger (C)

PDRC Itars (p) R. P. Warren (V-C)

(p) R. E. Sieglitz (p) I. D. Porter h

(a) J. J. EtCarry 2lO hul

Page 2 fieting #293 Nove5rber 6, 7, 8, 9,11 and 12, 1978 h

NOIES:

(C)

Chairman (V-C) Vice-Chairtran (p)

Prirnar,f Unit 2 PORC thrter (a)

Alternate Unit 2 PORC turber as designated by the Chamaan or Vice-Chairrran for this reeting.

(*)

Indicates Part-Time Attendance

~

~- 'Ite requi.rements of Technical Specifications 6.5.1.3

and-6.5.1.5 were satisfied at all tices.

The PORC net forrally for a total of 4.25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br /> during the week of Nove:rber 6, 1978.

II.

Procedures and Oanes A.

New Procedures Work Prquest Procedures Work Requests #5367 (revision to), #5678, #5699, #5860, #5917, #5952,

  1. 5970 and #7008 were reviewed and their respective procedures were reccmmnded for Unit Superinterdent approval.

B.

Procedure Chance Recuests h

1.

The following Procedure Change Requests were reviewed and rectrmended for Unit Superintendent approval:

PCRs 2-78-894 2-78-895 C.

Te:rrctary CMnge Notices 1.

The following Tcrpora.m.f CMnge Notices were reviewed and reccmmnded for Unit Superintendent approval:

'ICis 2-78-687 2-78-688 2-78-690 2-78-691 78-255 D.

Soecial Omratina Procedures 1.

The following Special Operating Procedure w?.s reviewed and recomerded for Unit Superintendent approval:

O a.

SOP 2-78-091 NaOH Flush Of CH and FU Systerns h 0 l}Nh

Page 3 tbeting #293 tbveder 6, 7, 8, 9, 11 and 12, 1978 h III. _'Ibsts and Exterirents None II.

Tech Specs /Licensinc Items Ibne -

V. - Plant Mo:lifications Ourz;e thiifications #2-0167, #2-0196, #2-0203, #2-0219, #2-0221, #2-0232 and #2-0238 were reviewed and the PORC has detennined that these O'.s do not ccnstitute any unreviewd safety questions. Furthernere, these C'_s were reccnrcerxled for thit Superintendent approval.

VI.

Reportable Occurrences / Violations Cantml Buildinc Chillers AH-C-8A and AH-C-8B Review For Pecortability (See Attachrent Cne)

Pressurizer IcVel Transmitter LT2 (See Attachaent TWu)

/},

LER 78-63/3L (Patchet Trio _Of Grcun 5 Rods - Caused Bv Incorrect Installation Of A Field Chance To_ Prevent Patchet Trics)

EORC has reviewed this item and determined that it constitutes a thirty day reirrt inaccordance with T.S. 6.9.1.9.b.

(See Attachnent Three)

LER 78-64/3L (EGT Iavel Switches For DHV3A/B E::cmded Their Allowable Values)

ICRC has reviewed this item and detemined it to constitute a thirty day report inaccordance with T.S. 6.9.1.9.a.

(See Attachmnt Four)

LER 78-65/99X (Scecial Recort Due To The ECCS Actuation Cn Ibvember 7, 1978)

PCRC has reviewed this item and determined 'iat a special 90 day report to the UStaC is required.

(See Future PORC Minutes for special report.)

VII. Plant Ocerations Varicus ryrbars of the PORC attended the FCD whern plant cperations were reviewed, discussed and evaluated. Various meabers of the PORC also aided and assisted in reconrcending future activities to tPe Unit Superintendent.

VIII. Soecia] Reviews and Investications Ibne h

c i o (m.5 iq

Page 4 feeting #293 lbverrixar 6, 7, 8, 9, 11 and 12, 1978 0

IX.

Security Plan / Procedures ttne X.

Emr scv Plan / Procedures tbne-,_

XI.

POPC Action Iters_

tbne XII. Other 1.

PORC reviewed all of the items covered in Sections II through VI and IX and X and concludes that none of the ite:rs constituted im Unreviewed Safety Cuestion.

J. F.'Hilbish PORC Vice-Chair an DII-2 b hJUK R. P. Warren PORC Vice-Cuirran tiI-2 f'

V J. L. Seelinger PORC Chairnan

'IMI JLS:REW:JFd:MBB: css Distributicn:

Station Superintendent GRC-2-Chairran m tL B. Eczilfa'.

D. K. Croneberger J. G. Herhein R. W. Ibward R. M. Klinga:ran R. G. Kokstein L. L. Lawyer J. B. Iogan T. A. Mackey h

J. R. Thorpe L i /j

{,t.;)

R. J. Toole Training Department POFC Minutes File

..e-w.em4.

-4wm._

-_mm..

a h+-

o O-O w

.T.

=

W e

Y O

O zia n 7

METROPOLITAN EDISON CO M P A N Y smosa,,,, o, c,.,,, eunuc utiiiri., co,,o, tio, Subject Control Building Chillers AH-C-8A & AH-C-8B Location TMI Nuclear Station Review For Reportability Middletown, PA 17057 Date December 1, 1978 To PORC File

.L

~

.~

~

On 11-8-78, several attempts were made to start AH-C-8A.

Each time the unit would trip on low lube oil pressure af ter approx-imately 1 minute runr.ing time.

Investigation showed that several loose fittings in the external oil system caused cavitation of the oil pump and low lube oil pressure.

In addition, a faulty overpressure

-trip switch was discovered. After the above discrepancies were corrected, the chiller was started and ran satisfactorily.

PORC has reviewed the above events and determined that it is not reportable because AH-C-8B would have been t.ble to supply both cooling coils. This was demonstrated by the vendor field representative during an inspection of both chiller units.

Further, due to the outside air temperature, operation of the chiller unite was not required to maintain control building component temperatures.

ihe philosophy discussed herein is consistent with discussions held on March 8,1973 with the principle NRC inspector.

O Prepared By:

C r

R.P, Warren /

/

Concurred By:

/

' F.4tilbish

~.

Rd Chairmn TMI-2 JFH:RPW:bil

-(

fo?- (_

// 9 7 3.

O,y. j

~

pr~ :cl

/

O a8 O INTER-OFFICE MEMORANDUM

.e4 w ww wmm. -

ar

+m m

~mo

+*.m w

.-o e

O ma--,e a

G O

c:a na

~ METROPOLITAN EDISON CO M P A N Y sessiai,y o, c..,,,,,3,4c utaici, ce,go,,,4on O

subject Pressurizer Level Transmitter LT2 Location TffI fluclear Station Mi_ddletown, PA-17057 Date November 9, 197.8 To PORC File

- i e' Pressurizer Lede1TTransmitter LT2, which is one.of three transmitters which monitor the same range of the Pressurizer, was declared inoperable and valved out of service on 10-23-78. The problem with LT2 was found to be a lose sensing line fitting which caused the respective transmitter wet reference leg to be incorrect.

Since this is one of three redundant transmitters and one was available from each independent tion-Nuclear Instrumentation power supply it was determined that the requirements of Technical Specification 3.3.3.5 and 3.3.3.6 were satisfied and therefore, this event was not reportable.

//,-

f Submitted By:

John A. Brumer y

Reviewed By:

Im N

Ivan D. Porter Concurred:

68 W.L.~Seeiinger

//

PORC Chairman V

TMI-2

.y

'f i lj hlL INTER-OFFICE MEMORANDUM

- - - - + -

w..

-%=.a me eme=~-

+--

s G

4 h

e

..e._

'e, i

G c i o

u.,

g

SUBJECT:

f!OTIFICATION OF OCCURRENCE OF A 30 DAY REPORTABLE EVEllT UNIf 2 TO:

J.G. HERBEIrl/ G.J. TROFFFR/ L.L. LAWYER I.

DATE OF OCCURRENCE:

October 29, 1978 h

2.

TIME OF OCCURREt!CE:

1725 fiODE:

3 3.

EVENT NUMBER:

78-63/3L 4.A.

THIS EVENT IS CONSIDERED REPORTABLE UNDER TECH. SPEC.

6.9.1.9 (b) 4.E THIS EVENT IS A VIOLATION OF-TECH. SPEC.

3.1.3.1

~

Control Rod Drive

~ ~.A - SYSTEM (S) INVOLVED:

5 5.8 DESCRIPTIOil 0F OCCURREllCE (ATTACH PAGES IF REQUIRED):

While perfoming a nomal reactor shutdown a ratchet trip occurred of Group 5 rods from 100%

withdrawn when Group 5 Motion was started by the Gr 6-7' at 25% interlock.

Power level was less than 1x10-8 amp. After the ratchet trip three rods in Group 5 were stuck at 5% withdrawn.

These rods were freed with the reacter 6.

It0iEDIATE CORRECTIV E ACTI0ti:

Correct circuit on the three gate drive ecdules per the field change.

G 7.

POSSISLE LONG TER'1 ACTION:

Install improved opto-isolator gate drive circuit.

(completed during the screen outage) 8.

Ivan Porter TO WRITE CRAFT 30 DAY REPORT BY 11-27-78 (tW!E)

(DATE)

/ 7" G.P. Miller Unit 2 Superintendent /

Station Superintendent GPil:bil cc:

J.J. Barton J.B. Logan Control Room Unit 2 p.B.Bezilla.

T.A. Mackey GRC Secretary R.W. Dubiel G.P. Mi-ller Office File

~

J.R. Floyd J.P. O'Hanlon Training Denartment I.[f. Porter Q

J.F. Hilbish J.L. Seelinger Preparer R,tl. Klingaman D.M. Shovlin G.A. Kunder jg gJ]

. ~.

58. Continued O

~

Subsequent investigation revealed that a field change, designed in code 3.

to prevent ratchet trips, had been improperly installed on one Gr 5 gate This was drive nodule and two auxilliary power supply gate drive modules.

~

the probable.cause of the ratchet trip.

~

e z i 8 0: :,

O

e

=-

e 0

'geh"we,,

  • -am
  • e e
  • -e

~* we 4

4 d

O O

O 4

,,f

~

r

[ '; {,

! '?

.s O

1

SU3 JECT: h0TIFICATIOil 0F OCCURI5tlCE OF 'A 30 DAY REPORTABLE EVEllT U:11

~

~

TO:

J.G. HERBEIfi/ G.J. TROFFER/ L.L. LAWYER 1.

DATE OF OCCURREllCE:

riovember 7, 1978

~

b 2.

TIME OF OCCURREllCE:

0527

-!!0DE:,

3 3.

EVEllT tiUMBER:

78-64/3L 4.A.

THIS EVErlT IS C0:lSIDERED REPORTABLE UllDER TECH. SPEC.3.3.2.1 4.B THIS EVEf!T IS A VIOLATION OF TECH. SPEC.

6.9.1.9.a S.A SYSTEN(S)'IrlVOLVED:

SFAS' The two BUST level 5.B DESCRIPTI0tl 0F OCCURREllCE (ATTACH FAGES IF REQUIRED):

switches which operate DH-V8A and B were calibrate'd and found to exceed their allowable value.

6.

It'fiEDIATE CORRECTIV E ACTICl1:

The switch setooints were calibrated and returned to service.

h 7.

POSSIBLC L0llG TER?1 ACTI0ti:

Lights will be installed on Panel 58 in the control room to constantly monitor state of DH-LS-8052A/B also a more accurate means of detecting level is being investigated.

8.

John Bru:=er TO WRITE DRAFT 30 DAY REPORT BY 11-27-78 (FLAME)

(DATE)

M 11 G.P. Miller Unit 2 Superintendent /

Station Superintendent GPM:bll cc:

J.J. Barton J.B. Logan Control Roca Unit 2

('M.B. Bezilla; T.A. Mackey GRC Secretary R.W.~Dubier" G.P. Miller Office File J.R. Floyd J.P. O'Hanlon Training Department O

J.F. Hiloish J.t. Seelinser ercParer J.A. Brc=er i

l R.M. Klingaman D.M. Shovlin G.A. Kunder L ;1 b h,,

a, t

_