ML19224B548

From kanterella
Jump to navigation Jump to search
Reactor Trip Rept
ML19224B548
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/28/1979
From:
METROPOLITAN EDISON CO.
To:
References
OLP-790328-27, TM-0284, TM-284, NUDOCS 7906150293
Download: ML19224B548 (1)


Text

i I

M

~

.. g t

TMI DOC'".DITS

~/M - ( O.\\ -Y

/

DOCUMENT NO:

COPY MADE ON OF DOCUMENT PROVIDED BY METROPOLITAN EDISON COMPANY.

7906150293 Wilda R. Mullinix, NRC

/ l /

.Ii, )

e 4

    • "T e

b

'*~

m

.e

q THRFE MILE ISLAtiD

,RfACTOR TRIP REFORT

.UJ41T II l.

Time c.d o Ca te 1/2.8 /7 ci 2.

Cause of trip 3.

Plant conditions prior to trip Power Level O /o Reactor Ccolant Sctcm Pressure 2/b psig Tave

[ 2 d.

F Reactor Coolant System Clow 37h[UO U

/

Makeup Tank Level inches Pressurizer Level L LO Sches H 0 2

RC Boron / O d 7 ppm.

FPD h Control Rod Positions (withdrawn)

Group 1 b Group / M %

Group 5 O %

Group 7

/

Group c Z 7 %

Groups Group ?/ 6@

Group 4

/

ICS Stations in Hand W

7 4.

Evolutions in progress prior to trio

(

5.

Corrective actions to prevent reoccurence.

6.

Time and date next criticality acheived.

7.

Record the reset pr essure at which the last main steam relief valve c'osed.

i;0TE:

Use.isual observation or chart recorder for this information.

Shif t Supervisor Supervisor of Operations cc:

Station / Unit Superintendent Manager Generation Operation Vice-President Generation (Action Required)

Porc Chairman

uclear Engineer 2)[ ]f)']/

ga