ML19224B255
| ML19224B255 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 06/08/1978 |
| From: | Metropolitan Edison Co |
| To: | Mullinix W NRC/IE |
| References | |
| 2202-1.2, TM-0030, TM-30, NUDOCS 7906140298 | |
| Download: ML19224B255 (2) | |
Text
-
=
TMI DOCUMENTS h
~
DOCUMENT NO:
f/h/[f 0F DOCUMENT PROVIDED BY COPY MADE ON METROPOLITAN EDISON COMPANY.
Wilda R. Mullinix, NRC 6
N 790614029'2 195 020
h 2202-1.2 Cu,N,,1 m..uco c,,u,/
. n n,,...,
.. r R-1s40,2 06/08/78 CENTR?i FILE R h 1919 r
THREE MILE ISLAND NUCLEAR STATION UNIT #2 EMERGENCY PROCEDURE 2202-1.2 UNANTICIPATED CRITICALITY Table of Effective Pages Pace Date Revision Page Date Revision Pace Date R evision 1.0 06/08/78 2
26.0 51.0 2.0 27.0 52.0 3.0 28.0 53.0 4.0 29.0 54.0 5.0 30.0 55.0 6.0 31.0 56.0 7.0 32.0 57.0 8.0 33.0 58.0 9.0 34.0 59.0 10.0 35.0 60.0 11.0 36.0 61.0 12.0 37.0 62.0 13.0 38.0 63.0 14.0 39.0 64.0 15.0 40.0 65.0 16.0 41.0 66.0 17.0 42.0 67.0 18.0 43.0 68.0 19.0 44.0 69.0 20.0 45.0 70.0 21.0 46.0 71.0 22.0 47.0 72.0 23.0 48.0 73.0 24.0 49.0 74.0 25.0 50.0 75.0 Unit 1 Staff Recommends Approval Unit 2 Staff Recommends Approval Approval Date Approval Date Cognizant Dept. Head Cognizant Dept. Head Unit 1 PORC Recommends Approval Unit 2 PORC Recommends Approval Date Date 2b Chairrnan of PORC tr-Chairman of PORC
'ND Unit 1 Superintendent Approval Unit 2 Superintendent Approsal
~
Date o
s W J'1 Date [
?
V' A
/ /
Manager Generat on Quality Assurance Approval
- /
Date i
175'121~"
innt; n.
t i a tna u..a t :.n n s i n i t u.,
UNIT #2 EMERGENCY PROCEDURE 2202-1.2 APR P 3 s79 UNANTICIPATED CRITICALITY 1.0 SYMPTOMS l.1 Unanticipated increase in count rate.
1.2 Acutation of control rod out motion inhibit alarms (intermediate range set at 3 C;M, resets at 0.5 DPM; source range set at 2 DPM, resets at 0.5 DPM).
2.0 IMMEDIATE ACTION 2.1 Automatic Action.
a.
Withdrawal of control rods stop (only if alarm actuated).
2.2 Manual Action.
a.
Immediately start insertion of control rods.
b.
Monitor count rate until shutdown by 1% ak/k.
c.
Trip the reactor, if necessary.
d.
Ensure there is no dilution flow into the Reactor Coolant System.
3.0 FOLLOW-UP ACTION 3.1 The Shutdown Margin shall be >l% ik/k.
(T.S. 3.1.1.1) Emergency Borate if necessary per 2203-1.1.
3.2 Determine cause for unanticipated criticality.