o TMI DOCUMENTS
~
DOCUMENT NO:
COPY MADE ON OF DOCUMENT PROVIDED BY METROPOLITAN EDISON COMPANY.
Wilda R. Mullinix, NRC 7906140187 e
191 OSI
2s.
CONTR.m :, O r^
210., -.,+.1 p gn -- 14 Revision 2 U E.lN l.M., ;i f
03/14/79
- r. ~ ~
o.
THREE MILE ISLAND NUCLEAR STATION
~
UNIT #2 OPEU. TING RPOCEDURE 2104-4.1 MISCELLANEOUS LIQUID RADWASTE DISPOSAL Table of Effective Pages Paoe Date Revision Pace Date Revision Pace
,D ate R evision 1.0 05/13/77 0
26.0 05/13/77 0
51.0 05/13/77' 0
2.0 05/13/77 0
27.0 05/13/77 0
52.0 05/13/77 0
3.0 05/13/77 0
28.0 05/13/77 0
53.0 05/13/77 0
4.0 05/13/77 0
29.0 03/14/79 2
54.0 05/13/77 0
5.0 05/13/77 0
30.0 05/13/77 0
55.0 05/13/77 0
6.0 05/13/77 0
31.0 05/13/77 0
56.0 05/13/77 0
7.0 05/13/77 0
32.0 05/13/77 0
57.0 03/14/79 2
8.0 05/13/77 0
33.0 05/13/77 0
58.0 03/14/79 2
9.0 05/13/77 0
34.0 05/13/77 0
59.0 05/13/77 0
10.0 05/13/77 0
35.0 05/13/77 0
60.0 05/13/77 0
11.0 05/13/77 0
36.0 05/13/77.
0 61.0 05/13/77 0
12.0 05/13/77 0
37.0 03/14/79 2
62.0 05/13/77 0
13.0 05/13/77 0
38.0 03/14/79 2
63.0 03/30/78 1
14.0 05/13/77 0
39.0 05/13/77 0
64.0 05/13/77 0
15.0 05/13/77 0
40.0 05/13/77 0
65.0 05/13/77 0
16.0 05/13/77 0
41.0 05/13/77 0
66.0 05/13/77 0
17.0 05/13/77 0
42.0 05/13/77 0
67.0 05/13/77 0
18.0 05/13/77 0
43.0 05/13/77 0
68.0 05/13/77 0
19.0 03/14/79 2
44.0 05/13/77 0
69.0 05/13/77 0
20.0 03/14/79 2
45.0 05/13/77 0
70.0 05/13/77 0
21.0 03/14/79 2
46.0 05/13/77 0
71.0 05/13/77 0
22.0 03/14/79 2
47.0 03/14/79 2
72.0 03/30/78 1
23.0 03/14/79 2
48.0 05/13/77 0
73.0 05/13/77 0
24.0 03/14/79 2
49.0 05/13/77 0
74.0 25.0 03/14/79 2
50.0 05/13/77 0
75.0 Unit 1 Staff Recommends Approval U.:it 2 Staff Recommends Approval N
Date Approval.
/I Date Approval Ccgnizant Ospt. Head Cogniz:nt D ept. Head Unit 1 PORC Recommends Approval Unit 2 PORC Recomm s Approval k/
Dated /1
- 7 M
Date Chairman of PORC Chairman of PORC
/
/
e' Unit 1 Superintendent Approval Unit 2 Superintendent Approval I
Date Aeu Date 74 f'
/
Manager Generation Quality Assurance Approval Date
~
T MI 55. A R ev 8/7 7 191 052
'--e.
e
\\.,
2104-4.1 Revision 0 t'
05/13/77 THREE MILE ISLAND NUCLEAR STATION UNIT #2 OPERATING PROCEDURE 2104-4.1 MISCELLANEOUS LIQUID RADWASTE DISPOSAL Table of Contents PAGE SECTION 4.0 1.0 R_EFERENCES 1.1 Drawirgs Applicable for Operation 4.0 1.2 Operzting Procedures Applicable for Operation 4.0 1.3 Manufacturers' Instru. tion Manuals 5.0 6.0 1.4 System Descriptions 1.5 ' urves, Tab' es, Etc.
6.0 2. ', LIMITS AND PRECAU. IONS 18.0~
18.0 2.1 Equipment 2.2 Administrative 19.0 3.0 PREREGUISITES 21.0 4.0 PROCEDURES 21.0 4.1 S tart-Up 22.0 4.2 R.B. Sump Pumps Operation 22.0 4.2.1 R.B. Sump Filter, WDL-F8A, B Change 22.0 4.2.2 Discharge of R.B. Sump to Aux. Bldg.
Sump Tank, WDL-T5 24.0 4.3 0;x. Bldg. Sump Operations 25.0 4.3.1 Aux. Bldg. Sump Filter, WDL-F3A, B Filter Change 25.0 4.3.2 Aux. Bldg. Sump Filter Bypass 26.0 4.4 R.B. Spray, Decay Heat Removal and Ccataminated 2
Drain Tank, Room Sumps, Pump Down with Temporary Pump 27.0 0
1,0 191 053
~
8 2104-4.1 Revision 0 05/13/77 Table of Contents (cont'd) 4.5 Miscellaneous Waste Held-Up Tank (MWHT),
WDL-T2, Operations 28.0 4.5.1 MWHT Recirc.
28.0 4.5.2 MWHT, WDL-T2, Transfe
- .o Unit 1 MWST, WDL-T2 or Unit 1 Misc ivap, WDL-Z-1B 29.0 4.5.3 Receiving Misc. Waste From Unit 1 30.0 4.5.4 MWHT, WDL-T2, Transfer to Neut. Tank, WDL-T8A (B).
32.0 4.5.5 MWHT, WDL-T2, Transfer to ABST, WDL-TS, Infrequent Operation) 33.0 4.5.6 Neutralizing and Adding Chemicals to the MWHT, WDL-T2 34.0 4.6 Auxiliary Building Sump Tank (ABST), WDL-TS, Operations 35.0 4.6.1 ABST, WDL-T5, Recirc 35.0 4.6.2 ABST, WDL-TS, Discharge to MWHT, WDL-T2 35.0 4.6.3 ABST, WDL-T5, Discharge to a Neut. Tank, WDL-T8A (B) 36.0 4.6.4 ABST, WDL-TS, Transfer to Unit 1 3Z.0 4.7 Contaminated Drain Tank (CDT), WDL-Til A & B, Operations 39.0 4.7.1 CDT, WDL-TilA (B), Rectre.
32.0 4.7.2 Changing Drain Header Inlet on CDT, WDL-illa & B 41.0 4.7.3 CDT, WDL-TllA (B), Discharge to Neut.
Tank, WDL-TSA (B) 41.0 4.7.4 CDT, WDL-Til A (B), Transfer to MWHT, WDL-T2 44.0 4.7.5 CDT, WDL-Til A (B), Transfer to Unit 1 47.0 4.7.6 Placing CDT Filter, WDL-F7A (B) in Service 48.0 4.7.7 Removing CDT Filter, WDL-F7A (B) from Service 49.0 191 054 S.
e w... v4. am. W FX NN M. # M FC ~ -
"-"C7
civ, *.i Revision 0 05/13/77 Table of Centents (cont'd) 4.7.8 CDT Filter, WDL-T7A (B) Bypass 49.0 4.8 Neutralizer Tank, WDL-78A & P, Operations 50.0 4.8.1 Neut. Tank, WDL-T8A (B), Recirc.
50.0 4.8.2 Neut. Tank, WDL-T8A (B), Discharge to the Environment via the MDCT 51.0 4.8.3 Neut. Tank, WDL-T8A (B), Discharge to MWHT, WDL-T2 55.0 4.8.4 Neut. Tank, WDL-T8A (B), Discharge to Unit 1 57.0 4.8.5 Neut. Tank, WDL-T8A (B), Chem Addition 60.0 4.8.6 Placing Neut. Filter, WDL-F4A (B) in Service 61.0
. 4.8.7 Removing Neut. Filter, WDL-F4A (B) from Service 61.0 APPENDIX Ti tle N_c_.
o Valve Line-Up Sheet A
63.0 Valve Line-Up Signature Sheet B
73.0 191 055
..n=_.=~.,,
2104-4.1 Revision 0 05/13/77 THREE MILE ISLAND NUCLEAR STATION UNIT #2 0/ERATIt;G PROCEDURE 2104-4.1 MISCELLANE0US LIQUID RADWASTE DISPOSAL
1.0 REFERENCES
1.1 Orawings Applicable for Operation.
1.1.1 Radwaste Disposal Misc. Liquids, S&R Drawing No. 2045.
1.1.2 Radwaste Disposal Rea tor Coolant Liquid, B&R Drawing No.
2027.
1.1.3 Radwaste Disposal Solid, B&R Crawing No. 2039.
1.1.4 Radwasta Disposal - Gas, B&R Drawirq No. 2028.
1.1.5 Chemical Addition, B&R Drav:ing No. 2025.
1.1.6 Radwaste Pumps Seal Water, B&R Drawing No. 2492.
1.1.7 Demineralized Service Water, B&R Drawino N' 2007 Sheet 2.
1.1.8 Nitrogen for Nuclear and Radwaste Systems, B&R Drawing No.
2036.
1.1.9 Radwaste Disposal R.C. Leakage Recovery, B&R Drawing No. 2632.
1.1.10 Nuclear Plant Sampling, B&R Drawing No. 2031.
1.1.11 Instrument Air, B&R Orawing No. 2012.
l.1.12 Service Air, B&R Drawing No. 2014.
1.1.13 Unit 1 Liqui
- daste Disposal (Misc.), GAI Drawing No. 302-690.
1.1.14 Unit 1 Liquid Waste Disposal (Evaps.), GAI Drawing No. 302-692.
1.2 Operating Procedures Applicable for Operation.
1.2.1 2104-4.2, Reactor Coolant Liquid Waste Disposal System.
1.2.2 2iO4-4.3, Gas Waste Disposal.
1.2.3 2104-4.4, Solid Waste Disposal.
1.2.4 2104-4.5, Radwaste Pumps Seal Water System.
191 056
= - - - -
Revision 0 05/13/77 t
i 1.2.5 2104-1.12, Nuclear Plant Chem. Add.
1.2.6 2104-2.2, Demineralized Service Water.
1.2.7 2104-1.11, Nuclear Plant Sampling.
1.2.8 2104-1.10, Nuclear and Radwaste N SUPP Y' I
2 l.2.9 2104-4.6, Reactor Coolant Leakage Recovery System.
f 1.3 fianufacturers' Instruction Manuals.
1.3.1 B&R Spec #114, Pall Trinity Micro.
1.3.1.1 Aux. Building Sump Filters WDL-F-3A & B.
- 1. 3.1. 2 Neutralizer Tank Filters WDL-F4A & B.
1.3.1.3 Contaminated Drain Filters WDL-F-7A & B.
1.3.1.4 Reactor Building Sump Filters WDL-F8A & B.
1.3.2 B&R Spec #74, Crane Deming Pumps.
1.3.2.1 R.B. Sump Pumps WDL-P-2A & B.
1.3.2.2 Aux. Building Sump Pumps WDL-P-3A & B.
1.3.2.3 Aux. Building Sump Tank Pumps WDL-P-4A.& B.
l l
1.3.2.4 Misc. Waste Transfer Pumps WDL-P-6A & B.
1.3.2.5 Neutralizer Tank Pumps WOL-P-8A & B.
l.5.2.6 Contaminated Drain Pumps WOL-P-15A & B.
1.3.2.7 Decay Heat Removal Pump Room Sump Pump WDL-P-16A & B.
1.3.2.8 R.B. Spray Pump Room Sump Pump WDL-P-17A & B.
1.3.2.9 Contaminated Drain Tank Room WDL-P-18.
1.3.3 B&R Spec #1188, Milton Roy, Sulfuric Acid Pump, CA-P-9.
1.3.4 B&R Spec # LATER, Lapp Iterpace, Caustic Pump, CA-P-5.
1.3.5 B&R Spec !104, Grinnell Corp. Diaphran Valves.
1.3.6 B&R Spec #51, Crane Co., Globe Valves.
[
1.3.7 B&R Spec #107, Crosby, Relief Valves.
5.0 191 J57
~
=.=.,, a _,....=.
. =
5 2104-4.1 Revision 0 ri
?
05/13/77 4
g 1.3.8 B&R Spec #46, flercury Co. of flonvood, Inc., Control Board, 4
Bailey Controllers, Taylor flow recorders, etc.
1.3.9 B&R Spec #118C Delavalve, Spent Fuel Submersable Pump SF-P-3.
l.4 System Descriptions.
[
1.4.1 Radwaste Disposal Miscellaneous Liquids System, Index '!o. 44.
1.4.2 Radwaste Disposal, Reactor Coolant Liquid Syste, Index No. 21.
1.4.3 Demineralized Service Water Syste, Index No. 5.
~
1.4.4 Instrument and Service Air System, Index No. 10.
1.4.5 Radwaste Disposal, Gas System Index No. 22.
[
1.4.6 Chemical Addition Index No. 18.
[
1.4.7 Radwaste Pumps Seal Water (Demin Water System) Index No. 5.
t
[
1.4.8 "itrogen for Nuclear and Radweste System, Index No. 30.
0 1.4.9 Nuclear Plant Sampling System, Index No. 25.
[,
h 1.5 Curves Tables, Etc.
C l
1.5.1 Indicated Level vs. Volume.
C
[
1.5.1.1 R.B. Sump "LATER".
p 1.5.1.2 Aux. Sump "LATER".
K l
1.5.1.3 Decay Heat Sump "LATER".
t 1.5.1.4 R.B. Spray Sump "LATER".
P 5
t 1.5.1.5 Contaminated Drain Sump "LATER".
2 1.5.1.6 Aux. Building Sump Tank (ABST).
1.5.1.7 Misc. Waste Hold-Up Tank (MWHT).
1.5.1.8 Cont. Drain Tank (CDT).
1.5.1.9 Neutralizer Tanks (Neut. Tanks).
N I
C V
5 6.0 l
191 058 x
?
=
~
e 2104-4.1 Revision 0 05/13/77 TABLE 1.5.1.6 Calculated Volume vs. Liquid Level Aux. Building Sump Tank LEVEL VOL (fti (Gal) 0.0 130 0.25 250 0.50 380 0.75 530 1.00 695 1.25 855 1.50 1045 1.75 1230 2.00 1415 2.25 1610 2.50 1800 2.75 1985 3.00 2170 3.25 2360 3.50 2520 3.75 2685 4.00 2835 4.25 2970 4
4.50 3085 Full 3215 NOTE-Zero level assumed at centerline of bottcm level nozzle; High level alarm (LATER).
7.0 191 059
,,--1-,
2104-4.1 Revision 0 05/13/77 TABLE 1.5.1.7 Calculated Volume vs. Liquid Level Misc. Waste Hold-Up Tank Level Vol Level Vol (ft)
(Gal)
(ft)
(Gal) 0.0 40 5.25 10330 0.25 200 5.50 10950 0.50 430 5.75 11570 0.75 730 6.00 12180 1.00 1080 6.25 12790 1.25 1460 6.50 13390 1.50 1880 6.75 13980 1.75 2330 7.00 14560 2.00 2800 7.25 15160 2.25' 3300 7.50 15810 2.50 3810 7.75 16220 2.75 4230 8.00 16740 3.00 4880 8.25 17240 3.25 5480 8.50 17710 3.50 6060 8.75 18160 3.75 6650 9.00 18580 4.00 7250 9.25 18960 4.25 7860 9.50 19310 4.50 8470 9.75 19610 4.75 9090 10.00 19800 5.00 9710 10.25 20000 Full 20040 NOTE:
Zero level assumed at centerline of bottom level nozzle, High level alarm "LATEP.".
8.0 191 060
~
Revision 0 05/13/77 TABLE 1.5.1.8 Calculated Volume vs. Liquid Level Contaminated Orain Tank LEVEL VOL (ft)
(Gal) 0.0 0
0.25 45 0.50 120 0.75 215 1.00
~ 325 1.25 450 1.50 585 1.75 730 2.00 880 2.25 1030 2.50 1190 2.75 1345 3.00 1505 3.25 1660 3.50 1815 3.75 1960 4.00 2105 4.25 2235 4.50 2360 4.75 2470 5.00 2560 5.25 2630 Full 2660 NOTE:
Zero level assumed at the bottom of the tank, High Alam 9.0 191 061
~
r...m., m,.
.,g.s.
.~- - -
r-
.m,.
,-s g
2104-4.1 Revision 0 05/13/77 TABLE 1.5.1.9 Calculated Volume vs. Liquid Level Neutralizer Tanks Level Vol Level Vol (ft)
(Gal)
(ft)
(Gal) 0.0 1225 5.25 4915 0.25 1400 5.50 5090 0.50 1575 5.75 5265 0.75 1750 6.00 5440 1.00 1930 6.25 5620 1.25 2105 6.50 5795 1.50 2280 6.75 5970 1.75 2455 7.00 6145 2.00-2630 7.25 6320 2.25 2505 7.50 6495 2.50 2980 7.75 6670 2.75 3160 8.00 6845 3.00 3335 8.25 7025 3.25 3510 8.50 7200 3.50 3685 8.75 7375 3.75 3860 9.00 7550 4.00 4035 9.25 7725 4.25 4210 9.50 7900 4.50 4390 9.75 8075 4.75 4565 10.00 8255 5.00 4740 10.25 8430 10.50 8605 10.75 8780 OVERFLOW NOTE:
Zero level assumed at centerline of bottom level nozzle, High level alarm "LATER".
10.0 191 062
= = -
= - -
=.
civ,,..
Revision 0 05/13/77 1.5.2 Pump Curves.
1.5.2.1 WDL-P-4A/B Aux. Emilding Sump Tank Pump.
1.5.2.2 WDL-P-6A/B Misc. Waste Tank Pump.
l.5.2.3 WDL-P-8A/B Neut. Tank Pump.
1.5.2.4 WDL-P-15A/B Contaminated Drain Pumps.
1.5.2.5 CA-P-5 Caustic Pump (Stroke vs. Flow).
1.5.2.6 CA-P-9 Sulfuric Acid Pump (Stroke vs. Flow).
1.5.3 Hand Controller Signal Out vs. Flow.
"THIS SECTION LATER"
- 1. 5. 3.1 WDL-V-295A/B CDT Pump Discharge Flcw Control.
1.5.3.2 WDL-V-394A/B Neut. Pumps Discharge Flow Control.
1.5.3.3 WDL-V-423 ABST Recirc Flow Control.
1.5.3.4 WDL-V-424 ABST Discharge Flow Control.
1.5.3.5 WDL-V-433 MWHT Discharge Flow Control.
1.5.3.6 WDL-V-434 MWHT Recirc. Flow Control.
N 11.0 1
063:
=
H E 'f !!. <! ".. '.".."."..."..'".1.?..' ?.' ?
Q
~
Q O
l l
[
[ ] I' I~
ll
' I ]
~-
] l
~
TrasituarsimmriintureirusisirtrafrituririlliIrmPg1,.
<j l
l I
FIGURE 1.5.2.1 l
AUX. BLDG. SufiP TAtiK Pul1PS i
40 l
J l
WDL-P4 A & B l
l PRESS. (PSIG) vs. FLOW (GPM) l i
I{
,j l
-l 0 0' Tank Level & 2.5 psig Tank I
l 1
8 35 I
, I l
l Gas Press.
j
. 1 I I I f I i
j l
[
h I
I fl l l 1
l l
i
! p T
l 'I 30 l
l i
l N
oj l
i i
i s i
j 11 T
I j j i
j.
I $
i I
i s
I lp y h,
} i{ l j k!
F25 j
!j l
l A
lh@ l j l i
l
- x
.l l
j!
]
f o PSI l
)n t
i 11 l
l in i a i
u 20 I
Hp j j ;
j
! /
.l.i 11 l
j v
I i
l l
I I l
L
,l 1 1 1 J
ilI M
! ld h !I f! l,I i
a I:
!jl i
is p d $ a'.
i i
s' i
I i
1 j
y;! ldj!.Li l i
n!
i i
l
,'q[q u i S.
i i
U l
l l
i
[p!,j, c
l J
I li l
.g g
.,g qli!
d I l 9
!!j i!j II i'e.
+
y i
o io
.o l
lc.n l'
p a
O I !!
h d![Ifl $1
[1 l
ll IIj
-;I l U l
1!llH!
4I !;
I [
' j l'
!i i
i
' i!
vd l
,ihIjfl N
}
l !
i
-fh;h l
l I ui t i no. t,! h j!
l q
pq u 4 o p M l i
- n..i-i t
H1!! u i
ki j
l i
i l
n l l!
Il i
I !
I ji l
nt.
,i i
i d l I
l il I !!
i,I l
d;,i!:
I
}
i l
h i
i i
- " Uni.
t b
u u d, hbb I
o nab [hth !l Ajn d
k a
.m 3g e
a e. 4 - 3
O u E =5:' ::::: ll." ='?'?
O
' " ~
O
^
t q
'cl
))
]
{
f[
T j[IlflHmIMITImIm1IlllTilIlIIllIIIIIIIIIIIII51]EBIMhtillEIEilBGBlIBIBI{T..
i
,[
l FIGURE 1.5.2.2 i
filSC. WASTE TAtlK PUMPS 40_
l' WDL-P-6 A & B l
l Press. (PSIG) vs. Flow (GPil) l l
0 0' Tank Level & 2.3 psig 1
q I
Gas Press.
y i
I I!
l I
i 35 t
.. x p-I E
lI r
l.
j pl p
i
.p t
=
m
}
30.
l i.
}
l l
l i
I i l i
i J
[
l l !
l l!
l !
]
hl i
.I
['
ig i
1 t
i 2s N;
j i
I i
! *, e i
l!Il t
f' N l
ll l
l.-
o PSI r I
I l
+
l I I jl fi s
{
2a ih l
i h j !
i i
i q
%lk lO j
H jip I t M
r
]
s d y!lp l
t i
I m
F l
1 l
1 L iM i
o n i
l o
le
.l i
i li l l I
j j!U i
k P
1 l
p I
l T I i
l l-I j ! I l ih I !
I
!q!l k
ui i
i j! n-ir j.j l
j m
n p!
i l
l '!
lij,! !
l ll j l
I I
l i.l ! l
.l j j i
i 10 J
- j jijl l i
! i 1 l e
i n,
.i
- n i
i
!l tii m o',
n I !!liil!.lj!
l o
o l l hi I
l.
i
!!,I lI
!1 l j il l l H
l
'l j
i; lij i
J,1 {
Il t
lil imu ll n-ni
,i i-l i
i r o p!
i j i j i
il l
ii l-
!.l i
4 i
l jij j
I i]ijl il; ij
.4
' 'l l
l t
i-i i
i l
4 lp i l l!
{
. { l l
t
- t i l!
c2 j
i j
ji i
11 Iq!;,!gl o,j
'i j
i i
I as I
l l
j l
ll
.i
-i!
! l!
j l
l l
! !'l l i ll l i j tr h
ill@h ill hb J 1
h li l l d
Il$ ill Li.hl L I I
I ifi li I
I i
i '6011 11 11 0
!i,0 jd OL1!
I l
- 1..
1 8
10 20 30 40 a
gg,;
4
isC W 6 3 I U14 V e
e nc/17/77
_ _ _ _-:___.-.----^.:-'---
T=Gr :. _ -----<
- - - - - - -. - - - - - - - ------_;=_
r--._;---~
t*-*.
C'---'-~_----___-._----7---"
-A_-'..2- '..m __ -_ -. ---- O A
.--._.:._-'*~~^--'~--:'---~~--^
O.
, _ - -_ :r_
._ _~ __ -- ~__/_ --
__._.--__.r=
l'5
- :- :-- : /^^~ ^ ^--
g
--+ -.
:--:---:/______'=_._n:='"..---'n..-
'~. ' ^ ~
=
^'-
_ ;=n
. =-
r n.
_ =*
r t- :
t=:
- = _==== - -- - - J -.
u= -~ :.=. : :- -~. _.. : :==:=::
r
..p.
r cr__-..__----
M f_---..,----.----___;------
-f-
.____.n--*------'.'
_-__-[
t- :
-______..-____[__
=i t ~.
O
_:===c:.--..._..-
- f c
_ - - - - - - -. - - -..------_;-_-y Q
_---e F:.
___-__7 -_._.__.- ___- __,. _.. -
-_---m.~
____a._
t: t y
-___79__=_.-..
.___._ _ o o
-/------
--- u - --
2=:
t- :
_.. f n t.a.
- -----.-___..__;_;;--_--C
+=~L__.___
f_
-~~~:*:- :-'_....._--.__-.._ -. _q "
w.,
_--l."-*.-"-['--'ZC----'--*
.._. -.--.-----~'L*'~_-j
- - g _; _. -
.,.,. - - j-g yg
!Z--*^
p5 g
,, e.,,
.,f_--_.__-.-~_---_-_.._---.-.-_-.y-_-_,-.---_-q
~
3 N,
C C3 O D
_---__--.----------__.--l--------,__--__.;---.-.---:L---;_.:.---.
A m3
- =2 4 < v c-
___,-__--_.______./-_w==.---____..---C---.__._.--Z="--_4
=
c_.x 2.
___ _. o l-
& CD tU
- --- _ bz :.:.--- -~"'.r.- Tl.--'--- ~ r--
^
4~~~--'..=.~^--~~_'._:::~'u~}
LU 9
- W
_L-*
__.*--7l'"--.
'-=:~--*_ _. - - -. -.'
-^%'~~-
__,_'.__.___.__,._.._-._-.._,..---------_--...-._..__..'---.____..'_',."_.-.e
.m Cf
,C,,.
e M
a m.
_ _ = - -. = _. - - -. -
--... _. _ -___ _ q e.
3g aa
__ f= n: r-n. _-_ _- -- - -- - - w._._ -_.-. =_= : r n - - - --*
w tu o s
- - 3 L,1.
g 7 C'L @
" -.- 2:.* /
....-1.-..
.__----.".:- ~r T m_ ___"_;==_-- _'____ ;_
E--
2.._
__. - -.. ' -. _ _. _.--_._."..-~
-/._..___.-._..
.-_ = = -
_..--.-t-.-_ _ _.
_,. _ _ _ _____---_.g z
y
. :- a.
E5.
^
_ = _ _ - _ _
--- ~
_ -. =... _.
_.;e
- =--
_. _;_._..__-__;.--..-._--._... ~... - _ _. -. _. -. - _ - -
w b**'
._q fr*-._.______'._
-'^-*-*.Cm._.__._
p j-_.__...
_ -.. =: : -- :-- _
w_-_-.
=~t u.---
..-__7__.
O, j.
F-
~ - - ' ' -
'I
' ' ~ ~ ~ ~~
~
.=:____--
C e
_=-o.
o-- =. _ - -
_n ;
a C.
g,
- e e-
- t ;
a, g
v LO w
E w
at
=
4 O
J.
~~
T 4
- o. 2 a.
e W s t
3 Y
5 e
x=
0e O
~~
f M
N.
-4 v
7-V
___e 0
e
_.e--
N b
~
- --g--
9
-.--.e a---.--e-.--.__b--.
6 N
aO t---
- ~ * " * * *
,_,,.-a y,_
e
~~--
- - ~ -
. _ = :-
~
_,_..rr- _.._
_____.g
.+_~~-._-_~JX';
a s
a
.O A91 066 O
O O
O v1 O
O
~
m m
m m
14.0
/
. - - -. ~_ -~. - - -
K 8V 15 10Tl V
_.w.e_--
e
. ------------.'__'---_2^^.=~~.--__.___.
-.. _. _ = =
_._ = =-- - = = _. -. - -~ - _3-
..____.3---:.--.____
_ _. _ ~ __.
O r = _~ _::-__
7--
____. :. _ _.--___: _ _. x_n_2_ _-- _ -.;-~
_ _ _ - - -. -. ~ _ -
_.-__-.f; g-
_ __ _ _._.-_-;_-.__----_ O c:-
Q
._a
.___2__
- _ -.; : N N
~ - " _ _
__ * ~ ~ ' ~ ^ ~ _ * '. _
_]_
O_ _
g
=. _ _ _ - -_
- =-
__-_-:._r-_.___.c-:.__.
T i _.._
f.=' -.
_- -- -;_ - ^ ^^ 3 Q
O g
4
__ ____ g r=
f.- _.___-
__.-._-.._.a g
O
~
___.-.--__-_m C
> r=
.I g-3 C2 0
n.
-.:______.__f y
b n_~.=:"-*--*=----~
~----.ZJ--_'~r--'._7 m3 C Q
=r r------ "
- =~: - _ _ =2.
-.= = - -..
..m N.
g-z
- e. - a
]
m e
af M
- - _-- - n n.
__-._-------'..-__--.__,-___-.,_;g c ;g
,c
'_' _ ~ _ ZE _ _
Z-~~'-_U.__________,-~'._.~~~~__.~~~.'.*.Ti_T.
~
l":
Ov C
.==.__=__=._=___=--_:_=_;__b.CO-r--
t=-
ro a e,-
- --. _ _ _. _ _. _.. = _. _ _ _ _ _ - - _. _ _ _.. _ _ _
g g
,g C
Z -_J pC
_-----____.--/..=____- - - - - - - - - - - -
---._-----_c_--:
3cm e
a m-
.. _. = _ -... _ _ _..
--zr ' rr -- :
t--
3 OO ~
__--.._---_---_a_...--.-.:.u;-__-._--.---_-_.----.-.---._.-__-.--___.--;-;-_.__q
=. _ _ _..._.:---
L&-
U I C-W-
-1.
_ _ _ f=.._.___.._.__-...._-.-:--.--.._-___=._r---~~=:
r
- =-
p=:
t=:
.__.---O 6
_- g- =._ = [.___-_3 p __ +
- --- _ g _ _Z_. _3_~- ; _- L ~;r=_g_3 C
^-
-.+m._m.ee-
- -.,. - - - + -.. - -
.=._..-*---_e-.
.-.ee_
2 _-.._.: = :- _---
~
}
. _ _ _ _ _ _. _ _ _ " ^ _ _ _ _ _ _.
c t-*
W.__
._.[-----___-
'----=---iE"------~-
O e
.g
~ ~ "
f * ---* =P
_ ". - ~ ~. ~ ~ - _ _
p_
-__..-_.---._7 O
__, e g g y
-e.
"'~~ f -
- J y
we O
g*
--_.O x
j.
F--
O a
f
~f li :
u e
a 7C T.
=
b I
+
g.
x.
_. a Go--
. __- 4 O
_ _. _ _.~2D p
~_.
V m
ke-
~ - =
- rg
,-.--ee_.
__ _.. _. +
=
6.--
-d
_. _._ _. C -3 o.,e_._
__.____.__.__JO
_._ _.N 0.'
-5 ?_.
.______'5_
^^~
_.._..__.__~.~__._____._C*
-- -. --:j
=--- -
---a
"-~
. _ _n.I -]
s O.
O O
O O
O W
W
- r M
O.
A 15.0 y/
U47 n
._a p.Q m aMF*
e.m J.m.
g_
- h*i.-*
N pd
- -'bU.
EWy e
Revision 0 o
,y VU/ AJ /I
, p'.
i t
s 6
t e
\\i i
e i
L f
- 5 a
i i
e s
8 t
f
,\\. 6 i
YI l
l i
4 e
i h*
s n
i 4
[
\\
4 4
6 i
i\\
l i
e l
i e
T 6 \\
i i
e
\\
i I
i f
\\
i i
\\
s i
e 4
6
\\
i e
i e
i i
6
\\
t 6
e i
1 Y
3 I
e i
\\.
e i
a e
1 6
1 t
i e
I I
l I
i 6
I 6
6 i \\
i i
i 6
i e
i 6
e A
i i
~
e y
i e
i i
i
}
t
^
e
\\ i 6
+
i 6
i i
s.
N I
'~~_
l t
6 i
6 i
i\\
e i\\
i i
I i
1 6
6 i
6 i
e i
s-e e
e t
s, t
N C
a T
e g
i -
i I
e e
t 5*
g i
6 e
\\i i
o s
e s
x a
=
l e
.\\
i t
i l
t a \\
e 4
it
\\
I i
4 n--
6 s e
+
I 1
i m.
s 8
.S
\\
i 6
i G
t e
i
\\
t a
s t
e e
N
~
g.
I i
\\ t i
t_
N' 3
e 6
e i
\\l l
u 8
- d i
\\t.
I e
e w
e W
y k
C i
e v's
~.
e ig i
8 I
6 \\
l I
,s I \\
i i
ls,
O p,
T
}
e
-i' 1 C
i
\\
i
{
e e
\\-,
i g
i w
^.
a
\\ i i
d e
i i
6
\\
~
4 6
i t
e t
I.
e s
^
k
+
f 4
4 e
i s
e i
e
\\
as e
i e
b e \\
p
.g
~
6 e
i I
t h i
t I
- a r_j
\\
e r
}
==
i i
s e
r-6 e
ga e
6 i
a e
3
\\
l
.r
~
)
e i
1
+
6
/
% i i
i i
ci i
s.
C.
i m
1 e
g e
is a
,j 1
e l
e i \\
e i
e X3 6
i \\
r of i
s i
i i
8 e
\\
8 e
i t *N i
i i
\\-
e J
i t
\\
e N4
==
6 N
n l
Tg 4
e
\\
I e
e i\\
i i
s s
l
\\
I 1
4 i
e i
i f
i
\\
e l
e e
6 a
i
\\
e
- ' ' ~,
i i
i e
i i
f i
e i
6 i
\\
I e
e a
i i
\\
z 1
1 i
i e
+
e
\\
f a
t i
8
~
i i
8
\\
s i
i i
f i
a A
i
\\
i e
i I
i t
i\\
i i
i i
l
_I 6
9 e
i l \\
e i
e i
i i
t \\
b i
i e
6 i
i i
I g
i f
a
\\
h i
i I
e e
i l
l
+
t
\\
i
{
4 e
L
.sN b1hbdb r.
i 4
r
~-
O O
O.
o -
' ' p p
O O
O C,s O
=
kf3 m
r'1 N
e a-ew
~
9
Revision 0 05/13/77 i
t i
i 1
s e
i i
i f
s
\\
i s
I
\\-
I
{
~ 3 s
e
\\
g g
i i
i
\\
\\
i 4
\\
i
\\
i i
i
\\ i i
\\i I
d i
\\
i i
i e
i N
j i\\
i i\\
a i
N I
+
3
\\
i i
i
\\
t 4
i
\\
\\i i
i N
t N
i g
i
. \\
i 2-i i
\\
3:
i e
i s
6 C
e i
i e
\\
s i
'3; e
s i
V 1
Y
\\ l t
~
s,
\\t 6
{
i m
1 m
,s i\\
i i
_8 e
i
- 'd I
I I
i 8
tp M
6 i
i
\\
=
. U 6
)
s
,__N.
- e t-- <, --
i a
i
\\,
i
- i i
i
\\t
\\.
i e
i s
6 i
u i
t i -
i t
\\
i a
i LwW i
i
.X 7
3 m
i t
e
\\
e i
I r
i i
\\ __i e
i e
\\
e
- __ F-a s
\\ i i
y
+
i e
_4 i
e 4
ge t
2
{
i
\\i A
+
i e
i Q
j 1
a i
g i
.s
-e,
,\\
i i
i N
et I
g a
e i
.a c-s
\\
v:
'c-s s
i e
m=
\\*
3
,5, 3,.
3, _
.\\
c.
a oe I
i 6
i\\
i a
47
\\
m
=s i \\
I, i
\\
i a_,
4 4
i i
i V.4 a
g 6
i e
i si i
se i
i e
i
\\i c
t e
I i
,s
, \\
, s i
i 6
1 4
i
\\
e i
g
\\
i a
1 e
\\
\\.
s s.
i t
\\
3 i
i i
e e
\\
\\
'v i
i
\\
i 3
\\
i i
\\
i i
.5-p_r.r JVdCec'ey"ld
- g -
3 i
i j, f,
h.
i vD9 e
o o
e a
w y
m o
i oo 5
e
't
""~ ~
=
- - =.
68U4-9.6 Revision 0 05/13/77 2.0 LIMITS AND PRECAUTIONS 2.1 Equipment.
2.1.1 Prepare for liquid transfer when the following tank levels are reached.
OVERFLOW TANK GALLONS LEVEL (Ft)
LEVEL GALLONS WDL-T-2 MWHT 19,800 10.0 10.25 20,000 WDL-T-5 ABST 2,835 4.0 4.75 3,215 WDL-T-8 NEUT.
8,6D5 10.5 10.75 8,780 WDL-T-ll CON-5.25 2,660 TAMINATED D.T.
2,560 5.0 Have Chem. take sample for u and Gross sy.
2.1.2 Do not allow pumps to operate outside these pressures.
Min Discharge Max Discharge PUMP Press. PSIG Press. PSIG Aux. Bldg. St Pump WDL-P-4A/B 20 34 MWT Pump WDL-P-6A/B 15 33 Neut. Tank Pump WDL-P-8A/B 32 58 Cont. Drain Pump WCL-P-15A/B 35 52 2.1.3 Low suction pressure interlocks will trip or inhibit start of the following pumps.
PUMP MIN. SUCTION PRESS TANK LEVEL WDL-P-4A/B LATER LATER WDL-P-6A/B LATER LATER WDL-P-15A/B LATER LATER NOTE:
These trips do not alarm but do cause disagreement.
NOTE:
The Neut. Pumps do not have a low Suction Press Interlock therefore caution should be observed during icw tank levels.
l9 18.0 b
=
m)Mm W e, a
2104-4.1 Revision 2 03/14/79 2.1.4 Do not run any of the below listed pumps in this system without adequate seal water, except in emergency.
Seal failure may result frem everheating of seals.
WDL-P-4A/B Aux. Sidg. Sump Tank Pump.
WDL-P-6A/B MW Transfer Pump WDL-P-8A/B Neut. Tank Pump WDL-P-15A/B Cont. Drain Pump.
2.1.5 Co not pump liquid frca a tank with the tank isolated from the vent header and N header.
2 2.1.6 When sluiceing or transfering of resins is taking place the Aux Sump level may raise due to overflow of decant frca the Spent Resin tank.
2.1.7 The temporary submergeable sump pump should be stored near the RB Spray pump vaults or the DH Pump vaults, for quick installation in event of failure of the single sump pump in each vault.
2.2 Administrative.
2.2.1 All transfers frcm tank to tank, unit to unit, and neutralization of tanks and all releases, shall be authorized by a Process Instruction and Data Sheet.
Tank Recirculation and filter change do not require a Process Instruction and Data Sheet.
2.2.2 Transfer of liquids between units shall involve a Process Instruction and Data Sheet for each unit.
Ccmmunica tions shall be established between the Pri. Aux Operators of each unit before transfer begins. Unit to Unit transfers require Unit Superintendent, or his designee, approval.
A sample fr should be taken to be analyzed for conductivity and pH prior f
19.0 191 071
2104-4.1 Revision 2 03/14/79 to the unit to unit transfer.
If the pH is less than 5 or greater than 10 the liquid should not be transferred.
Neutralize the tank then complete the transfer.
2.2.3 All releases to the MDCT from the Neut. Tank (WDL-T-3A/B) shall be authorized by a Process Instruction and Data Sheet and HPP 1621.
2.2.4 Use caution when entering the NWHT (WDL-T-2) and ABST (WDL-T-
- 5) cubicles if there is any possibility that the rupture disks have blcwn.
If the disks have bicwn there will be high cas activity and high N concentrations in the room.
2 2.2.5 Segregation of waste shall be practiced whenever possible.
. sr example, if the wastes in the ABST (WDL-T-5) or the CDi (WDL-T-ll A/3) are icw in activity then they will be routed to the Neut Tank (WDL-T-8A/B).
If they are high in activity then they will be directed to the MWHT (WDL-T-2).
To accomplish this these tanks shall be sampled for gross Sy and conductivity before pumping out.
When the CDT is h full start a Cont. Drain Pump to recirc that tank.
When the Hi Level Alarm is received transfer the drain header to the other tank. Allcw tank to recirc at Max. ficw for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Have Chemistry sample, as necessary.
2.2.6 When possible, use the same letter pump and tank together during all processes, eg WDL-P-8A with WDL-T-8A.
2.2.7 Use one cartridge filter until high D.P. Alarm is received then switch filters and submit work request to replace spent fil ter.
(This is not required on the CDT fil ters, WDL-F-7A I
(3)).
191 072 20.
e-W mwe
2104 4.1 Revision 2 03/i4/79 3.11 The Misc. Radwaste System is lined-up per valve line-uo sheet Appendix A.
3.12 The " Process Instruction and Data Sheet" has been initiated if required.
4.0 PROCFDURE 4.1 Start-Up.
4.1.1 Place control swi tches for RB Sump Pumps, WDL-P2A & B, in AUTO position.
4.1.2 Place control switches for Aux. Building Sump Pumps, WDL-P3A & B, in AUTO posi tion.
4.1.3 Place control switches for Cecay Heat Removal Pump Rocm Sump Pumps, WCL-P16A & B in CN position.
4.1.4 Place control switches for Reactor Building Spray Pump l
Room Sump Pumps, WOL-Pl7A & B in CN position.
4.1.5 Place control switch for Contaminated Drain Tank Rocm i
Sump Pump, WDL-P18 in ON position.
4.2 R.B. Sump Pumps Operation.
NOTE:
Level of this sump must be recorded per Tech Spec 4.4.6.2 in 2301-5.1 Daily Shift Checks.
4.2.1 R.B. Sump Fil ter, WDL-F8A, B Change.
4.2.1.1 INSURE Hi D.P exists on filter to be changed by checking iccal indicators WDL-DPIS 3634 and 3635.
4.2.1.2 Verify closed or close the folicwing valves on the filter to be put in service.
CLOSE WOL-V355A (B).
CLOSE WDL-V356A (B).
CLOSE WDL-V357A (B).
I91 073 I
\\
22.
i
__.___._-e M q =
=. _ _
2104-4.1 Revision 2 03/14/79 CLOSE WDL-V358A (B).
CLOSE WDL-V564A (B'.
CLOSE WDL-V565A (B).
NOTE:
If filter to be put in service was drained, fill and vent as follows:
4.2.1.2.1 OPEN WDL-V-555A (B).
OPEN WDL-V-556A (B) 2 Turns.
4.2.1.2.2 Open WDL-V331 A (B) for 3 minutes.
NOTE:
If no flow is available to fill filter then open DW-V286 in addition to WCL-V331 A (B) for 3 minutes.
4.1.1.1.2 CLCSE WCL-V555A (B).
CLOSE WDL-V556A (B).
4.2.1.3 Open inlet and outlet valves of filter to be placed in service.
OPEN WDL-V331A (B).
OPEN WDL-V332A (B).
4.2.1.4 Close inlet and cutlet valves of filter to be removed frca service.
CLOSE WDL-V3318 (A).
CLOSE WDL-V332B (A).
4.2.1.5 Open drain valves for filter removed frcm servi =.
i OPEN WDL-V3578 (A).
OPEN WDL-V3588 (A).
OPEN WOL-V5648 (A).
OPEN WDL-V565B (A).
4.2.1.6 Vent the filter removed frcm service as folicws:
OPEN WDL-V355B (A).
OPEN 1 Turn WDL-V3568 (A) for 30 Sec. then close.
23.o 191 074
=__
2104 4.1 Revision 2 03/14/79 NOTE:
This may release a small amount of radicactive gas in the filter cubicle.
4.2.1.7 CLOSE the following valve for the filter removed frcm service.
CLOSE WDL-V355B (A).
4.2.1.8 Submit Work Request to change filter with high D.P.
Work Reques ' submitted to change fil ter wi th high D.P.
4.2.2 Discharge of RB Sump to Aux 31dg Sump Tank, WDL-T5.
NOTE:
Normally the RS Sump will discharge to the MWHT, WDL-T-2, however, in the event that (1) the activity of the sump or other waste is known to be low (requires Process Instruction and Data Sheet) or (2) the MWHT is full, or (3) both RB Sump Filters WDL-FSA, B, are at high DP's the water may be routed to the ABST WDL-T5.
4.2.2.1 GPEN WDL-V364.
OPEN WOL-V384.
4.2.2.2 CLOSE ar verify CLOSED WDL-V331A.
CLOSE or verify CLOSED WDL-V3318.
CLOSE or verify CLOSED WDL-V333.
4.2.3 R.S. Sump Fil ter Bypass.
NGTE:
The R.B. Sump Filter Sypass is not to be used except when 1)
Both fil ters, WDL-FSA, B, have Hi. D.P. 's and the ABST, WCL-TS, is full, or 2)
Scme other emer 7ency dictates its use.
a 4.2.3.1 VERIFY CLOSED or CLOSE WDL-V331 A.
VERIFY CLOSED or CLOSE WDL-V3318.
191 075 l:'
24.0
=*
w ---
2104-4.1 Revision 2 03/14/79 4.2.3.2 OPEN WDL-V333.
4.2.3.3 When problem or energency is passed, place WDL-F2A (B) in service per 4.2.1 and CLOSE WDL-V333.
4.3 Aux. Bldg. Sump Operations.
4.3.1 Aux. Bldg. Sump Filter, WDL-F3A, B, Filter Change Insure HI D.P. exists on filter to be changes by checking 4.3.1.1 local indicator WDL-DPIS 3630, 3631.
VERIFY CLOSED or CLOSE the following valves on the filter to 4.3.1.2 be put in service.
CLOSE WDL-V378A (B).
CLOSE WDL-V379A (B).
CLOSE WDL-V556A (B).
CLOSE WDL-V557A (B).
CLOSE WDL-V330A (B).
CLOSE WDL-V381A (B).
If filter to be put in service was drained, fill and NOTE:
vent as folicss:
4.3.1.2.1 OPEN WDL-V378A (B).
OPEN WDL-V379A (B) 2 turns.
4.3.
2.2 CPEN WDL-V215 (316) for 3 minutes.
NOTE:
If no flow is available to fill filter then open WDL-V-215 (316) for 3 min.
- 4. 3.1. 2. 3 CLOSE WDL-V378A (B).
CLOSE WDL-V379A (B).
OPEN inlet and outlet val es of filter to be place in service.
4.3.1.3 f
OPEN WDL-V215 (316).
OPEN WDL-V216 (317).
l 25.0 191 076 3
2104-4.1 Revision 0 05/13/77 4.3.1.4 CLOSE inlet and outlet valves of filter to be removed from service.
CLOSE WDL-V215 (316).
CLOSE WDL-V216 (317).
4.3.1.5 OPEN Drain valves for filter removed frcm service.
OPEN WDL-V3803 (A).
OPEN WCL-V381B (A).
OPEN WDL-V555B (A).
OPEN WDL-V5578 (A).
- 4. 3.1. 6 Vent the filter removed from service as follows:
OPEN WDL-V3788 (A).
Open 1 turn WDL-V3798 (A) for 30 Sec. then close.
NOTE:
This may release a small amount of radioactive gLs in the filter cubicle.
4.3.1.7 CLOSE the following valve for the filter removed frcm service.
CLOSE WDL-V3788 (A).
4.3.1.8 Submit work request to change filter with high D.P.
Work request submitted to change filter with high D.P.
4.3.2 Aux. Bldg. Sump Filter Bypass.
NOTE:
The Aux Building Sump Filter Eypass is not to be used except when both filters, WDL-F3A and B have high D.P.'s and the filter can not be changed immediately.
4.3.2.1 VERIFY CLOSED or CLOSE WDL-V215.
VERIFY CLOSED or CLOSE WDL-V316.
4.3.2.2 OPEN WDL-V315.
4.3.2.3 When problem or emergency is passed, place WDL-F3A (B) in service per 4.3.1 and CLOSE WDL-V315.
191 077 26.0 8
r g
Cision o
05/13/77 4.4 R.B. Spray, Decay Heat Removal and Contaminated Drain Tank Room Sump Pump Down with Temporary Pump.
t;0TE:
In the event that a sump pump fails, or must be removed for maintenance in 1)
A Decay Heat Vault or, 2)
A RB Spray Vault or, 3)
The contaminated Drain Tank Room, then this procedure must be put in effect.
4.4.1 Attach the spent fuel submersable pump (SF-P3) to the 4 inch pipe union at the discharge line of the pump that is affected.
NOTE,:
The Contaminated Drain Tanks have connections downstream of WDL-V409A (B).
4.4.2 OPEll one of the following valves.
RS Spray Sump A
B OPEN WDL-Vil46A OPEN WDL-V1146B DHR Sump A
B OPEN WDL-Vil47A OPEN WDL-Vil47B Lantaminateu Drain Tank A
B OPEN WDL-V803A OPEN WDL-V803B 4.4.3 CLOSE One of the following breakers to supply power to the local 480 volt 3 phase power receptacles.
27.0 g
,,g,s og
.,,4.[s
,- w m '['E M 74W
41U4-4.I Revision 0 05/13/77 Location of Rec.
DH RB Spray Cont. Drain Location of Brk.
MCC 2-42A MCC 2-22A USS 2-47 Brk. No.
5 DRR 7 DFT CH 1 INITIALS 4.4.4 INSURE switch in power cable is off.
Plug in pcwer cable to local 480V 30 receptacle for this purpose.
Use switch in power cable to switch pump on and off to maintain level in sump.
4.4.5 When normal sump pump is returned to service close the valve opened in step 4.4.2.
4.4.6 Open the breaker closed in step 4.4.3.
4.4.7 Rinse and Store the spent fuel submersable pump SF-P3.
4.5 Mis 211aneous Waste Hold-Up Tank (>"JHT), WDL-T2, Operations.
4.5.1 MWHT Recirc.
- 4. 5.1.1 OPEN.the following valves depending on which Misc. Waste Tank Pump, WDL-P6A (B), is to be used.
(Check one column).
Usino WDL-P6A Usino WDL-P6B OPEN WDL-V262A OPEN WDL-V262B OPEN WDL-V265A OPEN WDL-V2653 4.5.1.2 START WDL-P6A START WDL-P6B 4.5.1.3 OPEN WDL-V434 "LATER" % with Recirc Flow Controller.
4.5.1.4 Chemistry may obtain sample via WDL-V266.
4.5.1.5 PROCEEU to another part of this procedure or shutdcwn Recirc.
as follows:
4.5.1.6 STOP WDL-P6A (B).
4.5.1.7 CLOSE WDL-V262A (B).
CLOSE WDL-V265A (B).
28.0
. j_
2104-4.1 Revision 2 03/14/79 Unit 1 Misc.
MWHT, WDL-T2, Transfer to Uni t 1 FNST WDL-T2 nr 4.5.2 Evap., WDL-ZlB.
The contents of the Miscellaneous Waste Hold-Up Tank, WDL-T2, may be transferred to Unit 1 if it can not be discharged to The contents of the MDCT via the Neut. Tanks, WDL-TSA, B.
WDL-T2 should not be transferred to Unit #1 if the pH is Neutralize the tank then less than 5.0 or greater than 10.0.
complete the transfer.
A Process Instruction and Data Sheet for each Unit authorize
- 4. 5. 2.1 this process and Unit Superintendent, or his designee, has given approval.
1104-29Q, The Unit 1 Misc. Waste Evap. is in operation per 4.5.2.2 and ready to receive Unit 2 Waste or The Unit 1 Misc. Waste Storage Tank has sufficient freeboard to receive the transfer and still have 10,000 gallon freeboard left.
VERIFY CLOSED OR CLOSE WDL-V424.
4.5.2.3 VERIFY CLOSED OR CLOSE WDL V370.
VERIFY CLOSED OR CLOSE WDL-V251.
4.5.2.4 MWHT WDL-T2 on Recirc. per 4.5.1.
4.5.2.5.
OPEN WDL-V915.
OPEN WDL-V371.
OPEN WDL-V372.
Establish communication between Unit 1 and Unit 2 Radwaste 4.5.2.6 Panels and verify that Unit 1 operator is ready to receive liquid to tne Misc Waste Storage Tank, WDL-T2 or the Misc. Evap. per 1104-29T.
29.0 191 080
"'04-4.1 Revision 0 05/13/77 NOTE:
Unit 1 operator shall be in charge of this transfer.
Unit 2 cperator shall be available to innediately stop the transfer at the Unit 1 operator's command.
'4.5.2.7 Record level of MWHT WDL-T2.
Level Tine 4.5.2.8 When notified by Unit operator Using WOL-P6A Using WDL-P68 OPEN WDL-V264A OPEN WOL-V2648 4.5.2.9 THROTTLE WDL-V433 to control ficw rate using manual control station.
NOTE:
Recirc. Flow may be reduced to increase flow to Unit 1.
4.5.2.10 When transfer is complete STOP WDL-P6A STOP WDL-P6B CLOSE WDL-V264A CLOSE WDL-V264B 4.5.2.11 Record MWHT WDL-T2.
Level Time 4.5.2.12 CLOSE and LOCK WDL-V372.
CLOSE and LOCK WDL-V371.
Check one column 4.~.2.13 CLOSE WDL-V262A CLOSE WDL-V262B CLOSE WDL-V265A CLOSE WDL-V265B CLOSE WDL-V433 CLOSE WDL-V433 4.5.3 Receiving Misc. Waste from Unit 1.
30.0 191 081
=
2104-4.1
~
Revision 0 05/13/77 Misc. Waste may be transferred to Unit 2 as part of Waste Storage and Management Schemes.
4.5.3.1 A " Process Instruction and Data Sheet" for each Unit authorizes this process and Unit Superintendent, or his designee, has given approval.
4.5.3.2 The Misc. Waste Hcid-Up Tank, WDL-T2, contains sufficent freeboard to make the transfer.
4.5.3.3 CLOSE WDL-V915.
4.5.3.4 OPEN WDL-V372.
OPEN WDL-V371.
4.5.3.5 Establish communications betwecn Unit 1 and Unit 2 Radwaste Panels and verify that Unit 1 operator is ready to send Misc. Liquid to Unit 2 Misc Waste Hold-Up Tank, WCL-T2, per 1104-290.
NOTE:
Unit 2 operator shall be in charge of this transfer.
Unit 1 operator shall be available to immediately stop the transfer at the Unit 2 operator's command.
4.5.3.6 Record Level of MWHT.
WDL-T2 Time 4.5.3.7 OPEN WDL-V251.
4.5.3.8 Notify Unit 1 Operator to start transfer.
4.5.3.9 When transfer is complete or the MWHT, L:UL-T2, high level alarm is received, notify the Unit 1 operator to stop the f
transfer and close WDL-V251.
WDL-T2 Level _
Time 191 082 31.0
caus-9.1 Revision 0 05/13/77 4.5.3.10 CLOSE and LOCK WDL-V371.
CLOSE and '0CK WDL-V372.
4.5.3.11 OPEN WDL-V915.
4.5.4 MWHT, WDL-T2, transfer to Neut. Tank WDL-T8A (B).
4.5.4.1 A " Process Instruction and Data Sheet" authorizes this process.
4.5.4.2 The Neut. Tank to which transfer is to be made has enough storage capacity to complete the transfer and the tanks are not needed for deborating demin regeneration.
NOTE:
If chemicals are to be added leave tank storage capacities for these.
4.5.4.3 Verify CLOSED or CLOSE WDL-V424.
4.5.4.4 OPEN the following valves depending on which Misc. Waste Tank Pump, WOL-PGA (B)), is to be used.
(Check one column).
Using WDL-P6A Usina WDL-P68 OPEN WDL-V262A OPEN WDL-V262B OPEN WDL-V264A OPE 21 WDL-V2648 OPEN WDL-V433 OPEN WDL-V433 OPEN WDL-V370 OPEN WDL-V370.
4.5.4.5 OPEit tank inlet For WDL.T8A For WDL-T88 OPEN WDL-V235A OPEN WDL-V235 4.5.4.6 START WDL-P6A START WDL-P6B Control ficw with WDL-V433.
4.5.4.7 Monitor transfer when transfer is complete.
STOP WDL-P6A STOP WDL-P6B 32.0 191 083 w
e T
caus-4.1 Revision 0 05/13/77 4.5.4'.8 CLOSE WDL-V2 SEA (B).
CLOSE WDL-V264A (B).
CLOSE WDL-V433.
CLOSE WDL-V370.
CLOSE WDL-V235A (B).
4.5.5 MWHT, WDL-T2, Transfer to ABST, WDL-T5 (Infrequent Operation).
4.5.5.1 A " Process Instruction and Data Sheet" authorizes this process.
4.5.5.2 The ABST, WDL-T5 has enough storage capacity to compete the trcnsfer.
4.5.5.3 OPEN the following valves depending on which Misc. Waste Tank Pump, WDL-P6A (B), is to be used.
(Check one column).
Usino WDL-PEA Using WDL-P6B Y
OPEN WDL-V252A OPEN WDL-V2628 OPEN WDL-V264A OPEN WDL-V2648 OPEN WDL-V433 OPEN WDL-V433 OPEN WDL-V424 OPEN WDL-V424 OPEN WDL-V229A (B)
OPEN WJL-V229A (B)
OPEN WDL-V230A (B)
OPEN WDL-V230A (B)
OPEN WDL-V4J1 OPEN WDL-V423 4.5.5.4 START WDL-P6A START WDL-P68.
Control flow with WDL-V433.
4.5.5.5 Monitor transfer when transfer is complete.
STOP WDL-PEA STOP W9L-P6B 33.0 191 084
=
~ ~ ' ' '
eN m
h h
6-mmwe
ciu4-4.1 Revision 0 05/13/77 4.5.5.6 CLOSE WDL-V252A (B).
CLOSE WDL-V264A (3).
CLOSE WDL-V433 CLOSE WDL-V424.
CLOSE WDL-V229A (B).
CLOSE WDL-V229A (B).
CLOSE WDL-V230A (B).
_CLOSE WDL-V423.
4.5.6 Neutralizing and Adding Chemicals to the MWHT WCL-T2.
NOTE:
Small PH changes may be made in this tank.
For large changes route water to Neut. Tanks WDL-T8A (B).
4.5.6.1 A " Process Instruction and Data Sheet" authorizes this process and specified chemicals and quanities of chemicals to be added.
4.5.6.2 PLACE MWHT, WDL-T2, on Recirc per 4.6.1.
4.5.6.3 (Check cne only).
Add chemicals to MWHT, WDL-T2 frca the Sulphric Acid Mix Tank, CA-T9, per 2104-1.12 section 4.6.2.
Add chemicals to MWHT, WCL-T2 frcm the Sodium Thio. and Caustic Mix Tank CA-T5 per 2104-1.12 Section 4.1.4.
4.5.6.4 Allow at least 2 volumes of Recirc. before chemistry sampler:
Add chemicals again if directed to do so by Shift Supervisor / Foreman.
4.5.6.5 Transfer or shut down recire, as required, per other
~}
sections of this procedure.34-191 085
-j
2104-4.1 Revision 0 05/13/77 4.6 Auxiliary Building Sump Tank (ABST), WCL-T5, Operations.
4.6.1 ABST, WDL-T5, Recirc.
4.6.1.1 OPEN the following valves depending en which ABST pump WDL-P4A (B) is to be used.
(Check cne column)
Usino WDL-P4A Usino WDL-P48 OPEN WDL-V227A OPEN WDL-V227B OPEN WDL-V230A CPEN WDL-V2308 OPEN WDL-V423 OPEN WDL-V423 4.6.1.2 START WDL-P4A START WDL-P48 Control recirc flow with WDL-V423.
4.6.1.3 Chemistry may obtain sample via WDL-V231.
4.6.1.4 Proceed to another part of this procedure or shut down re:irc.
as follows:
- 4. 6.1. 5 STOP WDL-P4A (B).
CLOSE WDL-V227A (B).
CLOSE WDL-V230A (B).
CLOSE WDL-V423 4.6.2 ABST, WDL-T5, Discharge to MWHT, WDL-T2.
4.6.2.1 Sample analysis indicates that ABST contents must go to MWHT WDL-T2 for later evaporation (eg. gross activity too high to release to MDCT via Neut. Tanks).
4.6.2.2 - A " Process Instruction and Data Sheet" authorizes this process.
4.6.2.3 The MWHT, WDL-T2, has sufficant freeboard to accept the
- transfer.
4.6.2.4 Verify CLOSED or CLOSE WDL-V370.
191 086 s\\
\\'
~
~
~ ~ ~
~.
2104-4.1 Revision 0 05/13/77 4.6.2.5 OPEN the follos ig valves depending on which ABST Pumo, WDL-P4A (B), is to be used. (Check one column).
Usina WDL-P4A Using WDL-P4B OPEN WDL-V227A OPEN WDL-V227B OPEN WDL-V229A OPEN WDL-V2298 OPEN WDL-V424 OPEN WDL-V424
.,erify 0 FEN WDL-V915 Verify OPEN WDL-V915 OPEN WDL-V251 OPEN WDL-V251.
4.6.2.6 START WDL-P4A START WDL-P48 Control flow with WDL-V424.
4.6.2.7 Monitor transfer. When transfer is complete STOP WDL-P4A (B).
CLOSE WLD-V227A (B).
CLOSE WDL-V229A (B).
CLOSE WDL-V251.
4.6.3 ABST, WDL-T5, Discharge to A Neut. Tank, WDL ~i8A (B).
4.6.3.1 Sample analysis indicates that ABST contents may be able to go to the river.
Based on the following:
4.6.3.1.1 Gross sy < "LATER" pci/mf..
4.6.3.1,2 Conductivity < "LATER" umho.
4.6.3.2 A " Process Instruction and Data Sheet" authorizes this process.
4.6.3.3 The Neut. Tank, to which the transfer is to take place, has sufficient freeboard to receive the transfer and the tanks are not needed for Deborating Demin. Regeneration.
4.6.3.4 VERIFY CLOSED or CLOSE WDL-V264A.
VERIFY CLOSED or CLOSE WDL-V2648.
~
VERIFY CLOSED or CLOSE WDL-V251.
191 087 36.0
~
e
2104 4.1 Revision 2 03/14/79 4.6.3.5 OPEN the following valves depending on which ABST pumo, WDL-P4A (B), is to be used.
(Check one column).
Using WDL-P4A Using WDL-P48 OPEN WDL-V227A CPEN WDL-V227B OPEN WDL-V229A CPEN WDL-V2298 OPEN WDL-V424 OPEN WDL-7424 OPEN WDL-V370 OPEN WDL-V370 4.6.3.6 CPEN tank inlet For WDL-T8A For WDL-T2B OPEN WDL-V235A OPEN WDL-V2353 4.6.3.7 START WCL-P4A START WDL-P4B Control flow with WDL-V424.
4.6.3.8 Monitor transfer. When transfer is complete.
STor WDL-P4A STOP WDL-P48 0
4.6.3.9 CLOSE WCL-V227A (B).
CLOSE WDL-V229A (B).
CLCSE WDL-V370 CLOSE WDL-V235A (B).
4.6.4 ABST, WDL-T5, Transfer to Unit 1.
NOTt:
ine contents of the ABST, WDL-T5, may be transferred to Unit 1, if the activity and chemistry do not permit release via the Neut. Tanks and it is not convenient to transfer the waste to the MWHT, WCL-T2.
The contents of WDL-T5 should not be transferred to Unit #1 if the pH is less than 5.0 or greater than 10.0.
Neutralize the tank then complete the
'/
transfer.
l 191 088 37.0 5
~ ~-
~
_ _ _ __ z.-
2104-4.1 Revision 2 03/14/79 4.6.4.1 A " Process Instruction and Data Sheet" for each Unit authorizes this process and Unit Superintendent, or his designee, has given approval.
4.6.4.2 The Unit 1 Misc. Waste Evap. is in operation per 1104-29Q, and ready to receive Unit 2 waste or The Unit 1 Misc. Waste Storage Tank has sufficient freeboard to receive the transfer and still have 10,000 gallon freeboard left.
4.6.4.3 VERIFY CLOSED or CLOSE WDL-V264A.
VERIFY CLOSED or CLOSE WDL-V2648.
VERIFY CLOSED or CLOSE WDL-V370.
VERIFY CLOSED or CLOSE WDL-V2Sl.
VERIFY CLOSED or CLOSE WDL-V400A.
VERIFY CLOSED or CLOSE WDL-V4008.
VERIFY CLOSED or CLOSE WDL-V326A.
VERIFY CLOSED or CLOSE WCL-V3268.
4.6.4.4 ABST WCL-TS on Recirc. per J.6.1.
4.6.4.5 OPEN WCL-V915.
OPEN WDL-V371.
OPEN WDL-V372.
4.6.4.6 Establish communications between Unit 1 and Unit 2 Radwaste Panels and verify that Unit 1 operator is ready to receive liquid to the Misc. Waste Storage Tank, WDL-T2 or the Misc. Evap. per 1104-29T.
. 0TE Unit 1 operator shall be in charge of this transfer. Unit 2 operator shall be available i
to immediately stop the transfer at the Unit 1 operator's command.
191 089 38.0
{
2104-4.1 Revision 0 05/13/77 4.6.4.7 Record level of ABST WDL-T5.
Level Time 4.6.4.8 When notified by Unit 1 Operator.
Usino WDL-P4A Usina WCL-P48 OPEN WDL-V229A OPEN WDL-V229B 4.6.4.9 THROTTLE WDL-V424 to control ficw rate using manual control station.
NOTE:
Retirc. Flow may be reduced to increase ficw to Unit 1.
4.6.4.10 When transfer is complete STOP WDL-P4A STOP WDL-P4B CLOSE WDL-V229A CLOSE.WDL-V229B 4.6.4.11 Record ABST WDL-T5 Level Time 4.6.4.12 CLOSE and LOCK WDL-V372.
CLOSE and LOCK WDL-V371.
Check one column 4.6.4.13 CLOSE WDL-V227A CLOSE WDL-V227B CLOSE WDL-V230A CLOSE WDL-V23DB CLSOE WDL-V424 CLOSE WDL-V424 4.7 Contaminated Drain Tank (CDT), WDL-T11 A & B, Operations.
4.7.1 CDT, WDL-TilA (B), Recire.
4.7.1.1 OPEN or CLOSE the following valves depending on which CDT Pump, WDL-PlSA (B) and which tank is to be used.
Use A pump,
l with A Tank Etc. if possible.
(Check one column).
f 191 090
~
~ ~
.. - =.
\\
2104-4.1 Revision 0 05/13/77 USING WDL-P15A To Recirc CDT A To recirc CDT B (Normal Method)
CLOSE WDL-V339A
_ VERIFY CLOSED WDL-V292 OPEN WDL-V292 VERIFY CLOSED WDL-V400A VERIFY CLOSED WDL-V400A OPEN WDL-V293A OPEN WDL-V293A OPEN WDL-V295A OPEN WDL-V295A OPEN WDL-V340A OPEN WDL-V340A OPEN WDL-V296A OPEN WDL-V337
_0 PEN WDL-V2968 USING WDL-P15B To Recirc CDT A To Recirc CDT B CLOSE WCL-V3398 (Normal Method)
OPEN WDL-V292 VERIFY CLOSED WDL-V292 VERIFY CLOSED WDL-V400B VERIFY CLOSED WDL-V40DB OPEN WDL-V2938 OPEN WDL-V2938 OPEN WDL-V295B OPEN WDL-V2958 OPEN WDL-V340B OPEN WDL-V3408 OPEN WDL-V337 OPEN WDL-V2968 OPEN WDL-V296A
- 4. 7.1. 2 START WDL-P15A START WDL-P15B Control ficw with WDL-V295A Control flow with WDL-V295B 4.7.1.3 Chemistry may obtain a local sample by opening the followin g
valves.
~.
WDL-V341A WDL-V341B WDL-V106BA WDL-V10688 191 091 I
40.0
~
,em M
,Mme em*
2104-4.1 Revision 0 05/13/77 4.7.1.4 Proceed to another part of this procedure or shutdown Recirc as follows.
4.7.1.5 STOP WDL-P15A (B).
4.7.1.6 CLOSE WDL-V293A (B).
CLOSE WDL-V295A (B).
CLOSE WDL-V340A (B).
CLOSE WDL-V296A (B).
4.7.1.7 If "A" Pump was used with "B" tank, or vice-versa, in step 4.7.1.1, then perform the follcwing valve line-up.
CLOSE WDL-V292.
CLOSE WDL-V337 OPEN or VERIFY OPEN WDL-V339A.
OPEN or VERIFY OPEh WDL-V339B.
4.7.2 Changing Drain Header inlet on CDT, WDL-TilA & B.
I 4.7.2.1 CDT WDL-TilA (B) is full and CDT WDL-TilB (A) has capacity available.
NOTE:
A " Process Instruction and Data Sheet" is not required for this process.
NOTE:
Attempt to have alternate tank empty before it is needed.
4.7.2.2 OPEN WDL-V289A (B).
4.7.2.3 CLOSE WDL-V289B (A).
NOTE:
Recirc Tank and Sample per 4.7.1.
Discharge as soon as possible.
4.7.3 CDT, WDL-TllA (B), Discharge to Neut. Tank, WDL-T8A (Bl.
7 4.7.3.1 Sample analysis indicates that CDT contents may be able t'o go to the river. Based on the following:
41.0
~
~
~
^"
Revision 0 05/13/77 4.7.3.1.1 Gross Sy < "LATER" uci/mt.
~
4.7.3.1.2 Conductivity < "LATER" umho.
4.7.3.2 A " Process Instruction and Data Sheet" authorizes this process.
4.7.3.3 The Neut. Tank, to which the transfer is to take place, has sufficient freeboard to receive the transfer and the tanks are not needed for Deborating Demin. Regeneration.
4.7.3.4 VERIFY CLOSED or CLOSE WDL-V264A.
VERIFY CLOSED or CLOSE WDL-V2548.
VERIFY CLOSED or CLOSE WDL-V251.
VERIFY CLOSED or CLOSE WDL-V229A.
VERIFY CLOSED or CLOSE WDL-V2298.
VERIFY CLOSED or CLOSE WDL-V326A.
VERIFY CLOSED or CLOSE WDL-V3268.
4.7.3.5 Call Unit 1 Primary ' nrator and have him verify CLOSED or CLOSE the follcwing Unit i valves.
WDL-V240.
WDL-V241.
WDL-V242.
WDL-V254.
4.7.3.6 OPEN or CLOSE the folicwing valves depending on which CDT Pump, WDL-P15A (B) and which CDT, WDL-TilA (B) is to be transferred.
Use A pump with A tank etc., if possible.
(Check one of the 4 groups).
42.0 4
I91 093
_ _ _ _ _ ___ j w*
--e*
w aw-m --
Revision 0 05/13/77 1
NOUtAL METHODS Using WDL-P15A ABtJDUtAL METHODS Takinc suction from CDT A Using WDL-P15A Taking suction from CDT B CLOSE WDL-V339A VERIFY CLOSED WDL-V292 OPEN WDL-V292 VERIFY CLOSED WDL-V340A VERIFY Cl.0 SED WDL-V340A OPEN WDL-V293A OPEN WDL-V293A OPEN WDL-V295A OPEN WDL-V295A OPEN WDL-V40DA CPEN WDL-V400A OPEN WDL-V372 OPEN WDL-V372 OPEN WDL-V371 OPEN WDL-V370 OPEN WDL-V371 OPEN WDL-V370 Using WDL-P158 Takina suction from CDT B Using WOL-Pl5B Taking suction from CDT A CLOSE WDL-V339B C
VERIFY CLOSED WDL-V292 OPEN WDL-V292 VERIFY CLOSED WDL-V3408 VERIFY CLOSED WDL-V3408 OPEN WDL-V2938 OPEN WDL-V2938 OPEN WDL-V2958 OPEN WDL-V2958 OPEN WDL-V4008 OPEN WDL-V4008 OPEN WDL-V372 OPEN WDL-V371 OPEN WDL-V372 OPEN WOL-V371 OPEN WDL-V370 OPEN WDL-V370 4.7.3.7 OPEN tank inlet
_For WDL-T8A For WDL-T88 OPEN WDL-V235A OPEN WDL-V2358 i
43.0 191 094
....---*--m e
e,
e
~
~~
~ ~ ~
usu,-n.s Revision 0 05/13/77 4.7.3.8 START WDL-P15A START WDL-PISB Control flow with Control ficw with WDL-V295A WDL-V295B 4.7.3.9 Monitor transfer.
When transfer is complete.
STOP WDL-PISA STOP WDL-P158 4.7.3.10 CLOSE WDL-V293A (B).
CLOSE WDL-V295A (B).
CLOSE WDL-V400A (B).
CLOSE WDL-V370 CLOSE WDL-V235A (B).
CLOSE and LOCK WDL-V371.
CLOSE and LOCK WDL-V372.
4.7.3.11 If "A" Pump was used with "B" tank, or vice-versa, in step 4.7.3.5, then perform the following valve line-up.
CLOSE WDL-V292.
OPEN.or VERIFY OPEN WDL-V339A.
OPEN or VERIFY OPEN WDL-V3398.
- 4. 7. 4 CDT, WDL-T11A (B), Transfer to MWHT, WDL-T2.
- 4. 7. 4.1 Sample analysis indicates the activity or chemistry prohibits discharge to MDCT via Neut. Tanks.
4.7.4.2 A Process Instructicn and Data Sheet authorizes this process.
- 4. 7. 4. 3 The MWHT, WDL-T2, has sufficient freeboard to receive the transfer.
4.7.4.4 VERIFY CLOSED or CLOSE WOL-V264A.
2 VERIFY CLOSED or CLOSE WDL-V2648.
191 095
-eme-
~ ~ ~ ~ - ~
2104-4.1 Revision 0 05/13/77 VERIFY CLOSED or CLOSE WDL-V370.
_~
VERIFY CLOSED or CLOSE WCL-V229A.
VERIFY CLOSED or CLOSE WDL-V2298.
VERIFY CLOSED or CLOSE WDL-V326A.
I
_ VERIFY CLOSED or CLOSE WDL-V3258.
4.7.4.5 Call Unit 1 Primary Operator and have him verify CLOSED or CLOSE the following Unit i valves.
i WDL-V240.
WDL-V241 l
WDL-V242 WDL-V254 4.7.4 6 OPEN or CLOSE the following valves depending on which CDT Pump, WDL-P15A (8) and which CDT, WDL-TilA (B), is to be transferred.
Use A Pump with A tank etc. if possible (Chec'<
one of the 4 groups).
NORMAL METHODS Using WDL-P15A' A_BNORMAL METHODS Taking suction frca CDT A Using WDL-P15A '
Taking suction from CDT B CLOSE WDL-V339A VERIFY CLOSED WOL-V292 GPEN WDL-V292 VERIFY CLOSED WDL-V340A VERIFY CLOSED WDL-V340A OPEN WDL-V293A OPEN WDL-V293A OPEN WDL-V295A OPEN WDL-V295A OPEN WDL-V400A OPEN WDL-V400A OPEN WDL-V372 OPEN WDL-V372 OPEN WDL-V371 OPEN WCL-V371 OPEN WDL-V251 OPEN WDL-V251 45.0
~
191 096
=====.. mum
.r.-
~
-==w
2104-4.1 Revision 0 05/17/77 Using WDL-P158 Using WDL-P158 Takino suction frcm CDT B Taking suction from CDT A CLOSE WDL-V3393 VERIFY CLOSED WDL-V292 OPEN WDL-V292 VERIFY CLOSED WDL-V340B VERIFY CLOSED WDL-V3408 OPEN WDL-V2938 OPEN WDL-V2938 CPEN WDL-V295B OPEN WDL-V2958 OPEN WDL-Va008 OPEN WDL-V4008 OPEN WDL-V372 OPEN WDL-V372 OPEN WDL-V371 OPEN WDL-V371 OPEN WDL-V251 OPEN WDL-V251 4.7.4.7 START WDL-P15A START WDL-P15B 4.7.4.8 Monitor transfer.
When transfer is complete, STOP WDL-PISA STOP WDL-P158 4.7.4.9 CLOSE WDL-V293A (B).
CLCSE JDL-V295A (B).
CLOSE WDL-V400A (B).
CLOSE WDL-V251.
CLOSE and LOCK WDL-V371.
CLOSE and LOCK WDL-V372.
4.7.4.10 If A pump was used with B tank, or vice-versa, in step 4.7.4.5, then perform the fcilowing valve line-up.
CLOSE WDL-V2S2.
OPEN or VERIFY OPEN WDL-V339A.
OPEN or VERIFY OPEN WDL-V3398.
46.0 191 097 men-
"*mmmm--=
"e"-"
2104 2.1 Revision 2 03/14/79 4.7.5 CDT, WDL-TLIA (B), Transfer to Unit 1 NOTE:
The contents of the CDT, WCL-Til A (B) may be transferred to Unit 1, if the activity ana chemistry do not per: nit relcase via the Neut. Tanks and it is not convenient to transfer the waste to the M'.iHT, WOL-T2.
The contents of WDL-TilA(B) should not be transferred ta Unit #1 if the pH is less than 5.0 or greater than 10.0.
Neutralize the tank then complete the transfer.
4.7.5.1 A " Process Instruction and Data Sneet" for each Unit authorizes this process, and Unit Superintendent, or his designee, has given approval.
4.7.5.2 The Unit 1 Misc. Waste Evap. is in operation per 1104-29Q, and ready to receive Unit 2 Waste, or The Unit 1 Misc. Waste Storage Tank has sufficient freeboard to receive the transfer and still have 10,000 gallon freeboard left.
4.7.5.3 VERIFY CLOSED or CLOSE WDt-V326A.
VERIFY CLOSED or CLOSE WDL-V3268.
4.7.5.4 CDT, WDL-TilA (B), on Recirc per 4.7.1.
4.7.5.5 Establish communications between Unit I and Unit 2 Radwaste Panels and verify that Unit 1 operator is ready to receive liquid to the Misc. Waste Stor. ;e Tank, WDL-T2 or the Misc. Evap. per 1104-29T.
NOTE:
Unit 1 operator shall be in charge of this I
transfer. Unit 2 operator shall be available to immediately stop the transfer at the Unit 1 operator's command.
i 191 098 47.0
u. v, -.,..
Revision 0 05/13/77 4.7.5.6 RECORD level of CDT WDL-TilA (B).
LEVEL TIME 4.7.5.7 When notified by Unit 1 Operator Using WDL-Pila Using WDL-P118 OPEN WDL-V400A OPEN WDL-VdCOB 4.7.5.8 THROTTLE WDL-V295A (B) to control flow rate using manual control station.
NOTE:
Recirc. Flow may be reduced to increase flow to Unit 1.
4.7.5.9 When transfer is complete STOP WDL-Pila STOP WDL-PilB CLOSE WDL-V400A CLOSE WDL-V40GB 4.7.5.10 RECORD CDT, WDL-TilA -(B).
LEVEL TIME
.._4. 7. 5.11 Refer to Recirc of CDT 4.7.1 and complete 4.7.1.6 and 4.7.1.7.
4.7.6 Placing CDT Filter, WDL-F7A (B) in Service.
4.7.6.1 VERIFY CLOSED or CLOSE the following valves on the filter to be put in service.
CLOSE WDL-V342A (B).
CLOSE WDL-V343A (B).
CLOSE WDL-V562A (B).
4.7.6.2 OPEN inlet valve of filter to be placed in service.
OPEN WDL-V408A (B).
2 Insure water is available to filter from 1 of the CDT.
48.0 191 099 i
r;7 1_ __
. _ ~ _ _
2104-4.1 Revision 0 05/13/77 4.7.6.3 OPEN WDL-V342A (B) to vent and fill the filter.
When filling is complete CLOST. WDL-V342A (B).
4.7.6.4 OPEN outlet valve of filter to be placed in service.
OPEN WDL-V407A (B).
4.7.7 Removing CDT Filter, WDL-F7A (B) frcm service.
- 4. 7. 7.1 Insure Hi D.P. exists on filter to be removed frcm service by checking local indicators WDL-DPIS 3638 (3639).
4.7.7.2 CLOSE inlet and outlet valves of filter to be removed from service.
CLOSE WDL-V408A (B).
CLOSE WDL-V407A (B).
4.7.7.3 OPEN drain valves for filter removed from service.
OPEN WDL-V343A (B).
OPEN WDL-V562A (B).
4.7.7.4 Vent the filter removed from service as follows.
OPEN WDL-V342A (B).
4.7.7.5 Submit work request to change filter with High D.P.
Work request submitted to change filter with High D.P.
4.7.8 CDT Filter, WDL-F7A (B), Bypass.
NOTE:
The CDT Filter Bypass is not to be used, except when both filters have High D.P.'s and the pumps are needed.
- 4. 7. 8.1 VERIFY CLOSED or CLOSE WDL-V408A (8).
VERIFY CLOSED or CLOSE WDL-V407A (S).
4.7.8.2 OPEN WDL-V406A (B).
4.7.8.3 When problem or emergency is passed placc. WDL-F7A (B) in service per 4.7.6 and CLOSE WDL-V406A (B).
100
~
49.0
-=
2104-4.1 Revision 0 05/I3/77 4.8 Neutralizer Tank, WDL-T8A and B, Operations 4.8.1 Neut Tank, WDL-T8A (B) Recirc.
4.8.1.1 OPEN or CLOSE the following valves depending on which Neut.
Pump WDL-P8A (B), and which Neut. Tank is to be used.
(Check one of the 4 groups).
NORMAL METHOD ABNORMAL METHOD Using WDL-PSA to Recirc Neut. Tank A Using WDL-PBX to Recirc Neut. Tank B CLOSE WD*.-V239A VERIFY CLOSED WDL-V244 OPEN WDL-V244 OPEN WDL-V240A OPEN WDL-V240A OPEN WDL-V394A OPEN WDL-V394A VERIFY COLSED WDL-V243A VERIFY CLOSED WDL-243A VERIFY CLOSED WDL-Y245 OPEN WDL-V245 OPEN WDL-V242A r
VERIFY CLOSED WDL-V242A VERIFY CLOSED WDL-V394B VERIFY CLOSED WDL-V243B OPEN WDL-V242B NORMAL METHOD ABNORMAL METHOD Using WDL-P88 to Recirc Neut. Tank B Using WDL-P88 to Recirc Neut. Tank A CLOSE WDL-V2398 VERIFY CLOSED WDL-V244 OPEN WDL-V244 OPEN WDL-V240B OPEN WDL-V2408 OPEN WDL-V3948 OPEN WDL-V394B VERIFY CLOSED WDL-V2438 VERIFY CLOSED WDL-V2438 S0.0 191 10l i
caus-4.1 Revision 0 05/I3/77 VERIFY CLOSED WDL-V245 OPEN WDL-V245 OPEN WDL-VZ42B VERIFY CLOSED WDL-V2423 VERIFY CLOSED WDL-V394A VERIFY CLOSED WDL-V243A OPEN WDL-V242A 4.8.1.2 START WDL-P8A START WDL-P8B Control ficw with Control ficw with WDL-V394A WDL-V3948 4.8.1.3 Chemistry may obtain sample via WDL-V246A (B).
4.8.1.4 Proceed to another part of this procedure or shutdown recirc.
as follows.
4.8.1.5 STOP WDL-P8A (B).
4.8.1.6 CLOSE WDL-V240A (B).
CLOSE WDL-V394A (B).
CLOSE WDL-V242A (B).
4.8.1.7 If "A" pump was used with "B" tank, or vice-versa, in step 4.8.1.1, then perform the following valve line up.
CLOSE WDL-V244.
CLOSE WDL-V245.
OPEN or VERIFY OPEN WDL-V239A.
OPEN or VERIFY OPEN WDL-V2398.
4.8.2 Neut. Tank, WDL-T8A (B), Dischearge to the Environment via the MDCT.
4.8.2.1 A " Process Instruction and Data Sheet" authorizes this process.
4.8.2.2 The release pennit, HPP 1621, has be issued and signed, and this permit gives release rate and specified which tank is to be released.
51.0
2104-4.1 Revision 0 05/13/77 WARNING:
Do not discharge a Neut. Tank that is receiving water or has received water af ter being recirculated and sampled.
4.8.2.3 Unit 1 is not releasing waste via Unit i valve WDL-V257.
4.8.2.4 No other source of water in Unit 2 is being released via WDL-V99.
4.8.2.5 The MDCT ficw is greater than the Lo-Flow trip point.
NOTE:
The folicwing things will CLOSE WDL-V99.
1.
WDL-V99 Keyswitch.
2.
Unit 1 WDL-V257 OPEN.
3.
MDCT Lo Flow Trip.
4.
RM-L7 Hi (Rad. Monitoring Pit).
5.
WLD-R1311 Hi.
6.
Hi Release Flow (WDL-FS-1636).
NOTE:
If WDL-R1311 or RM-L7 trips it will trip 1.
WDL-P8A & B.
2.
WDL-V100.
3.
WDL-V99.
4.
WDL-V93A & B.
5.
WDL-Pila & B.
4.8.2.6 Mark WDL-FR-1637 and WDL-FR-lG36 with Begin Release, Release No., Date, Time and Initials.
4.8.2.7 Verify spool piece between WDL-V800 and WDL-V100 is in place.
4.8.2.8 If tank is not on Recirc. place on Recirc. per 4.8.1.
4.8.2.9 Verify filter to be used is in service per 4.8.6.
NOTE A filter must be used during this process.
52.0
,\\
\\
I91 103
2104-4.1 Revision 0 05/I3/77
~:
f 4.8.2.10 OPEN or CLOSE the following valves depending on which pump and which filter, is being used.
Use A pump with A filter Etc.,
if possible.
Using WDL-P8A Using WDL-P8A and Filter A and Filter B VERIFY CLOSED WDL-V322 VERIFY CLOSED WDL-V324A OPEN WDL-V324A VERIFY CLOSED WDL-V243B OPEN WDL-V325A OPEN WDL-V322 VERIFY CLOSED WDL-V326A OPEN WDL-V324B OPEh WDL-V327A OPEN WDL-V325B OPEN WDL-V100 VERIFY CLOSED WDL-V3268 OPEN WDL-V243A OPEN WCL-V3278 OPEN WDL-V100 OPEN WDL-V243A Using WDL-P88 Using WDL-P88 ant; Filter B cnd Filter A VERIFY CLOSED WDL-V322 VERIFY CLOSED WDL-V324B OPEN WDL-V3248 VERIFY CLOSED WDL-V243A OPEN WDL-V325B OPEN WDL-V322 VERIFY CLOSED WDL-V326B OPEN WDL-V324A OPEN WDL-V327B OPEN WDL-V225A OPEN WDL-V100 VERIFY CLOSED WDL-V326A OPEN WDL-V2438 OPEN WDL-V327A OPEN WDL-V100 OPEN WDL-V243B NOTE:
A Operator shall be available during entire release.
53.0 I91 104 A
2104-4.1 Revision 0 05/I3/77 4.8.2.11 THROTTLE WDL-V394A (B) to LATER % and OPEN WDL-V99 with key. Adjust discharge flow as read on WDL-FR-1636 with WDL-V3d' a (B).
CAUTION: Do Not exceed ficw rate on release permit.
NOTE:
If may be necessary to close WDL-V242A (B),
Recirc Valve, to reach required ficw.
4.8.2.12 When Neut. Tank reaches 0.0 ft ind:cated level, STOP WDL-P8A (B).
CLOSE WDL-V243A (B).
CLOSE WDL-V99.
4.8.1.13 MARK WDL-FR-1637 and 1636 with " Finish Release", Release No., Date, Time and Initials.
4.8.2.14 CLOSE the following valves.
CLOSE WDL-V240A (B).
CLOSE WDL-V243A (B).
CLOSE WDL-V242A (B).
CLOSE WDL-V324A (B).
CLOSE WDL-V325A (B).
CLOSE WDL-V327A (B).
CLOSE WDL-V100.
4.8.2.15 If A pump was used with B Tank or B Filter Etc. perform the follcwing valve line-up.
CLOSE or VERIFY CLOSED WDL-V244.
CLOSE or VERIFY CLOSED WDL-V245.
CLOSE or VERFIY CLOSED WDL-V322.
OPEN or VERIFY OPEN WDL-V239A.
~
OPEN or VERIFY OPEN WDL-2398.
54.0 191 105 m-e eeum e
2104-4.1 Revision 0 05/13/77 4.8.2.16 Complete HP 1621 and Process Instruction and Data Sheet and return, along with WDL-V99 key, to Shift Foreman.
4.8.3 Neut. Tank, WDL-TBA (B), Discharge to MWHT, WDL-T2.
4.8.3.1 Sample analysis prove "eut. Tank contents unsatisfactory for release to MDCT.
4.8.3.2 A " Process Instruction and Data Sheet" authorizes this process.
4.8.3.3 The MWHT, WDL-T2, contains sufficient freebcard to accept transfer.
4.8.3.4 If tank is not on Recirc. place on Recirc per 4.8.1.
4.8.3.5 Verify filter, to be used, is in service per 4.8.6.
4.8.3.6 Verify CLOSED or CLOSE the following valves.
CLOSE WDL-V370.
CLOSE WDL-V229A.
CLG5E WDL-V2298.
4.8.3.7 Ca:1 Unit 1 Primary Operator and ha' e him verify CLOSED or CLO2E the following Unit i valves.
WDL-V240.
WDL-V241.
WDL-V242.
WDL-V254.
4.8.3.8 OPEN or CLOSE the following valves depending on which pump and which filter, is being used.
Use A pump with A filter Etc.,
if possible.
55.0 1*g; I06 m. J. w... urw.w..
. = w m- --c.a ~ -2 mu - --a r m ' - - -
-- ~- ~ - - - - -- - -
-1
-.w, Revision 0 05/13/77 Using WDL-PSA Using WDL-PSA and Filter A and Filter B VERIFY CLOSED WDL-V322 VERIFY CLOSED WDL-i324A OPEN WDL-V324A VERIFY CLOSED WDL-V2438 OPEN WDL-V325A OPEN WDL-V322 VERIFY CLOSED WCL-V327A OPEN WDL-V324B
'!ERIFY CLOSED WDL-V326B OPEN WDL-V325B OPEN WOL-V326A VERIFY CLOSED WDL-V327B OPEN WDL-V251
/ERIFY CLOSED WDL-V326A OPEN WDL-V243A OPEN WDL-V3268 OPEN WDL-V371 OPEN WDL-V251 OPEN WDL-V372 OPEN WDL-V243A OPEN WDL-V371 OPEN WDL-V372 Using WDL-P88 Using WDL-P88 and Filter B and Filter A VERIFY CLOSED WDL-V322 VERIFY CLOSED WDL-V3248 OPEN WDL-V3248 VtRIFY CLOSED WDL-V243A OPEN WDL-V325B OPEN WDL-V322 VERIFY CLOSED WDL-V327B OPEH WDL-V324A VERIFY CLOSED WDL-V326B OPEN WDL-V32SA OPEN WDL-V325B VERIFY CL0f,ED WDL-V327A OPEN WDL-251 VERIFY CLOSED ',!DL-V326B OPEN WDL-V2438 OPEN WDL-V326A OPEN WDL-V371 OPEN WDL-V251 OPEN WDL-V372 OPED '<1D-V2438 OPEN WDL-V371 OPEN WDL-V372 SS-191 107 s\\
~
\\
n :3 ;...
c, n ~...ra- _rc.;rp egy. a ( ' q : 3,y Lv:[. .
m
'p
. " d:-.
' -. " ~ ~ ' '
s
2104-4.1 Revision 2 03/14/79 4.8.3.9 Control Flow with WDL-V394A (B).
NOTE:
Recirc ficw may be stopped to increase discharge rate by closing WDL-V242A (B).
4.8.3.10 Monitor transfer. When transfer is ccmplete.
STOP WDL-PSA (B).
CLOSE WDL-V240A (B).
CLOSE WDL-V242A (B).
CLOSE WDL-V243A (B).
CLOSE WDL-V324A (B).
CLOSE WDL-V325A (B).
CLOSE WDL-V325A (B).
CLOSE and LOCK WDL-V371.
CLOSE and LOCK WOL-V372.
CLOSE WDL-V251.
a.8.3.11 If A pump was used with B tank or B filter, etc. perform the following valve line-up.
CLOSE or VERIFY CLOSED WDL-V244.
CLOSE or VERIFY CLOSED WDL-V245.
CLOSE or VERIFY CLOSED WDL-V322.
CDEN or VERIFY CPENED WDL-V239A.
OPEN on VERIFY CPENED WDL-V2398.
4.3.4 Neut. Tank, WDL-T8A (B), Discharge to Uni t 1.
NOTE:
The contents of the Neut, Tank WDL-T8A (B), may be transferred to Unit 1, if the activity and chemistry do not pent.it release via the MDCT and it is not convenient to transfer the waste to the MWHT, ilDL-T2.
2 The contents of WDL-T8A(B) should not be trans~ erred 57-l91 108 w e s m-m-
--_---e
2104 4.1 Revision 2 03/14/79 to Unit #1 if the pH is less then 5.0 or greater than 10.0.
Neutralize the tank then ccmplete the transfer.
4.8.4.1 A " Process Instruction and Data Sheet" for each Unit authorizes this process, and Unit Superintendent, or his designee, has approved the transfer.
4.E 4.2 The Unit 1 Misc. Waste Evap. is in operation per 1104-29Q, and ready to receive Unit 2 Waste, or The Unit 1 Misc. Waste Storage Tank has sufficient freeboard to receive the transfer and still have 10,000 gallon freeboard left.
4.8.4.3 VERIFY CLOSED or CLOSE WDL-V371.
VERIFY CLOSED or CLOSE WCL-V372.
VERIFY CLOSED or CLOSE WDL-V400A.
VERIFY CLOSED or CLOSE WDL-V4008.
4.8.4.4 Neut. Tank WDL-T8A (B) on Recirc. per 4.8.1.
4.8.4.5 Establish ccmmunications between Unit I and Unit 2 Radwaste Panels and verify that Unit 1 operator is ready to receive liquid to the Misc. Waste Storage Tank, WCL-T2 or the Misc. Evap. per 1104-29T.
4.8.4.6 OPEN or CLOSE the following valves depending on which pump and which filter, is being used. Use A pump with A fil ter etc.,
if possible.
e e
5 191 109
ncV65100 v 05/13/77 Using WDL-P8A Using WDL-PBA and Filter A and Filter B VERIFY CLOSED WDL-V322 VERIFY CLOSED WDL-V324A OPEN WDL '/324A VERIFY CLOSED WDL-V2438 OPEN WDL-V325A CPEN WDL-V322 VERIFY CLOSED WDL-V327A OPEN WDL-V3248 OPEN WDL-V24LA OPEN WDL-V3258 VERIFY CLOSED WDL-V3268 VERIFY CLOSED WDL-V327B OPEN WDL-V243A VERIFY CLOSED WDL-V326A Using WDL-PSB Using WDL-P88 and Filter B and Filter A VERIFY CLOSED WDL-V322 VERIFY CLOSED %DL-V3243 OPEN WDL-V3248 VERIFY CLOSED WDL-V243A OPEN WDL-V325B OPEN WDL-V322 VERIFY CLOSED WDL-V3278 OPEN WDL-V324A OPEN WDL-V2438 OPEN WDL-V325A VERIFY CLOSED WDL-V326A VERIFY CLOSED WDL-V327A OPEN WDL-V2438 VERIFY CLOSED WDL-V3268 NOTE:
Unit 1 operator shall be in charge of this transfer.
Unit 2 operator shall be available to immediately stop the transfer at the Unit 1 operator's coccand.
4.8.4.7 Record Level of Neut. Tank WDL-T8A (B).
Level Time I
59.0 191 110
~
-. ~...
, ~. -
~
2104-4.1 Revision 0 05/13/77 4.8.4.8 When notified by Unit 1 Operator.
Usino WDL-F4A Usino WDL-F4B OPEN WDL-!326A OPEN WDL-V326B 4.8.4.9 Control flow with WDL-V394A (B).
NOTE:
Recire flow may be stopped to increase discharge ate by closing WDL-V242A (B).
4.8.4.10 When transfer is complete STOP WDL-P8A STOP WDL-P8B CLOSE WDL-V326A CLOSE WDL-V3268 4.8.4.11 Record Neut Tank WDL-T8A (B).
Level Time 4.8.4.12 CLOSE the following valves.
CLOSE WDL-V324A (B).
CLOSE WDL-V325A (B).
CLOSE WDL-V24DA (B).
CLOSE WDL-V242A (B).
CLOSE WDL-V243A (B).
4.8.4.13 If A pump was used with B tank or B filter, etc. perform the following valve line-up.
CLOSE or VERFIY CLOSED WDL-V244.
CLOSE or VERIFY CLOSED WDL-V245.
CLOSE or VERIFY CLOSED WDL-V322.
OPEN or VERIFY OPENED WDL-V239A.
OPEN or VERIFY OPENED WDL-V239B.
4.8.5 Neut. Tank, WDL-T8A (B) Chem Addition.
4.8.5.1 A " Process Instruction and Data Sheet" authorizes this process and specifies chemicals and quanties of chemicals to be added.
\\
I91 111
'l j
~
2104-4.1 Revision 0 05/13/77 4.8.5.2 Place Neut. Tank WDL-T8A (B) on Recirt. per 4.8.1.
4.9.5.3 Add Chemical to Neut. Tank WDL-TBA (B), per 2104-1.12.
4.8.5.4 Allow at least 2 volumes of Recirc. before chemistry samples. Add chemicals again if directed to do so by Shift Supervisor / Foreman.
4.8.5.5 Transfer or shutdcwn Recirc, as required, per other sections of this procedure.
4.8.6 Placing Neut. Filter, WDL-F4A (B), in Service.
4.8.6.1 Verify CLOSED or CLOSE the following valves on the filter to be put in service.
CLOSE WDL-V375A (B).
CLOSE WDL-V276A (B).
CLOSE WDL-V558A (B).
CLOSE WDL-V560.
CLOSE WDL-V561A (B).
4.8.6.2 If filter has been drained proceed as follows.
4.8.6.2.1 Line up a Neut. Tank to se; ply water to the filter to be filled.
OPEN WDL-V324A (B).
OPEN WDL-V375A (B) until filter is full, then CLOSE WDL-V325A (B).
4.8.6.3 Open WDL-V325A (B) '.o place filter in service.
4.8.7 Removing Neut. Filter, WDL-F4A (B) frem S?rvice.
- 4. 8. 7.1 Insure Hi. D.P. exists on filter to be removed fren service by checking local indicators WDL-DPIS 3644 (3645).
61 o 191 !!2
-- i
.. m m...~ _.__..
=.
2104-4.1 Revision 0 05/13/77 4.8.7.2 CLOSE Inlet and outlet valves of filter to be removed from service.
C!.0SE WDL-V324A (B).
CLOSE WDL-V325A (B).
4.8.7.3 OPEN drain valves for filter removed from service.
OPEN WDL-V376A (B).
OPEN WDL-V558A (B).
4.8.7.4 Vent the filter removed frcm service as follows:
OPEN WDL-V375A (B).
9
~
191 113 O
g
2104-4.1 Revision 1 03/30/78 APPENDIX A Valve Line-Up System: WDL Misc.
Radwaste Discosal Misc. Lic.
V11ve No.
Descriotion Pocition Initials WDL-V272A RB Sump Pump A Discharge Valve OP WDL-V2728 RB Sump Pump B Discharge Valve OP Wired & Sealed WDL-V978 Iso. Valve WDL-V271 Test Valve CL Wired & Sealed WDL-V979 Iso. Valve WDL-V271 Test Valve CL WDL-V271 RB Sump Discharge RB Isa. Valve OP WDL-V1126 RB Sump Discharge RB Iso. Valve OP Wired & Sealed WDL-V805 Iso. Valve UDL-Vil26 Test Valve CL Wired & Sealed WDL-V806 Iso. Valve WDL-Vil26 Test Valve CL WOL-V418 RB Sump to RB Sump Fil ters OP WDL-V419 RB Sump Line Drain Valve CL WDL-V435 RB Sump Line Drain Valve CL WDL-V421 D.N. TO RB Sump Line Valve CL WDL-V403 Secondary Regen. Waste to MWHT Valve CL WDL-VCD4 Secondary Regen. Waste to MWHT Valve OP WDL-V361 Secondary Regen. Waste to MWHT Valve OP WDL-V330 Deborating Demin. Backwash to MWHT Viv OP WDL-V386 DW to RB Sump Filters Valve CL WDL-V364 RB Sump to ABST Valve CL WDL-V331A WDL-F8A Inlet Valve OP*
WDL-V331B WDL-F88 Inlet Valve OP*
WDL-V332A WDL-F8A Outlet Valve OP*
WDL-V332B WDL-F88 Outlet Valve OP*
- OPEN if in service.
63.0 g
2104-4.1 Revision 0 05/13/77 APPENDIX A Valve Line-Up System: WDL Misc.
Radwaste Discosal Misc. Lio.
Valve No.
Descriotion Position Initials WDL-V333 WDL-F8A (B) Bypass Valve CL WDL-V359A WDL-F8A D.P. Inst Root Valve Hi OP WDL-V360A WDL-F8A D.P. Inst Root Valve Lo OP WDL-V359B WDL-F88 0.P. Inst Root Valve Hi OP WDL-V3608 WDL-F88 D.P. Inst Root Valve lo CP WDL-V414 WDL-F8A (B) Inlet Drain Valve CL WDL-V415 WDL-F8A (B) Inlet Drain Valve CL WDL-V355A WDL-F8A Vent Valve CL WDL-V356A WDL-F8A Vent Valve CL WDL-V355B WDL-F88 Vent Valve CL WDL-V3568 WDL-F8B Vent Valve CL WDL-V357A WDL-F8A Drain Valve CL WDL-V358A WDL-F8A Drain Valve CL WDL-V357B WDL-F88 Drain Valve CL WDL-V3588 WDL-F88 Drain Valve CL WDL-V564A WDL-F8A Discharge Line Drain Valve CL WDL-V565A WDL-F8A Discharge Line Drain Valve CL WDL-V564B WDL-F88 Discharge Line Drain Valve CL WDL-V565B WDL-F88 Discharge Line Drain Valve CL WDL-V1091 R.C. Drain Header to MWHT Valve CL WDL-V269 RB Sump to MWHT Inlet Valve OP WDL-V313 MWHT N Inlet Valve OP 2
191 115
^
i
s 2104-4.1 Revision 0 1
05/13/77 APPENDIX A j
Valve Line-Up System: WDL Misc.
Radwaste Discosal Misc. Lio.
Valve No.
Descriotion Position Initials WDL-V268 MWHT DW Inlet Valve CL WDL-V1065 FMHT Chem Addition Inlet Valve OP WDL-V253 Spent Fuel Submersible Pump Inlet Viv CL WDL-V255 MWHT Liq Inlet Valve LOCKED GPEN WDL-V256 MWHT Vent Header Outlet Valve OP WDL-V352 FNHT Gas Anal. Outlet Valve OP WDL-V257 WDL-PT-1333 Iso. Valve OP WDL-V258 WDL-LG-1335 Upper Iso. Valve OP WDL-V259 WDL-LG-1335 Lower Iso. Valve OP WDL-V260 MWHT Drain Valve CL WDL-V261 MWHT To.WDL-P6A Iso. Valve OP WDL-V334 MWHT Drain Valve CL WDL-V335 FNHT Drain Valve CL WDL-V336 MWHT to WDL-P68 Iso. Yalve OP WDL-V309A WDL-PS 1339 Iso. Valve OP WDL-V309B WDL-PS 1340 Iso. Valve OP WDL-V1056A WDL-DPI 3636 Hi. Iso. Valve OP WDL-V1057A WCL-DPI 3636 Lo. Iso. Valve OP WDL-V1056B WDL-DPI 3637 Lo Iso. Valve OP WDL-V1057B WDL-DPI 3637 Hi Iso. Valve OP WDL-V412 WDL-P6B Discharge Drain Valve CL WDL-V413 WDL-P68 Discharge Drain Valve CL 3
65.0 191 116
e a us-4. i Revision 0 05/13/77 APPENDIX A_
Valve Line-Up System: WDL Misc.
Radwaste Discosal Misc. Lia.
Valve No.
Descriotion Position Initials WDL-V416 WDL-P6B Recirc Drain Valve CL WDL-V417 WDL-P6B Recirc Drain Valve CL WDL-V302 WDL-PT 1606 Iso. Valve OP WDL-V436 Nuc. Sampling Return Lines OP WDL-V211A WDL-Pl7A Discharge Valve OP WDL-Vil46A WDL-Pl7A Alternate Pump Discharge Viv.
CL WDL-V2118 WDL-Pl73 Discharge Valve OP WDL-Vil46B WDL-Pl7B Alternate Pump Discharge Vly.
CL WDL-V208A WCL-P16A Discharge Valve OP WDL-Vil47A WDL_P16A Alternate Pump Discharge Viv.
CL WDL-V208B WDL-P16B Discharge Valve OP WDL-Vil47B WCL-P16B Alternate Pump Discharge Viv.
CL WDL-V213A WDL-P3A Discharge Valve 0P s
WDL-V213B WDL-P3B Discharge Valve 0P WDL-V384 RB Sump Pump to ABST Filter Valve CL WDL-V388 WD-F3A, B D.W. Flush Valve CL WDL-V378A WDL-F3A Vent Valve s.
WDL-V379A WDL-F3A Vent Valve CL WDL-V378B WDL-F3B Vent Valve CL WDL-V379B WDL-F3B Vent Valve CL WDL-V380A WDL-F3A Drain Valve CL WDL-V381A WDL-F3A Drain Valve CL I
66.0 191 117 Moo
2104-4.1 Revision 0 i
05/13/77 APPENDIX A Valve Line-Up System: WDL Misc.
Radwaste Discosal Misc. Lia.
Valve No.
Descriotion Position Initials WDL-V3808 WDL-F3B Drain Valve CL WDL-V381B WDL-F3B Drain Valve CL WDL-V556A WDL-F3A Outlet Drain Valve CL WDL-V557A WDL-F3A Cutlet Drain Valve CL WDL-V5563 WDL-F3B Outlet Drain Valve CL WDL-V557B WDL-F3B Cutlet Drain Valve CL WDL-V901 WDL-F3B Inlet Drain Valve CL WDL-V902 WDL-F3A, B Inlet Drain Valve CL WDL-V903 WDL-F3A, B Bypass Drain Valve CL WDL-V904 WDL-F3B Cutlet Drain Valve CL WDL-V905 WDL-F3A, B Drairi Valve CL WDL-V382A WDL-DPIS 3630 Hi Iso. Valve OP WDL-V383A WDL-DPIS 3630 Lo Iso. Valve OP WDL-V382B WDL-DPIS 3631 Hi. Iso. Valve OP WDL-V3838 WDL-DPIS 3631 Lo Iso. Valve OP WDL-V215 WDL-F3A Inlet Valve OP*
WDL-V216 WDL-F3A Outlet Valve OP*
WDL-V316 WDL-F3B Inlet Valve OP*
WDL-V317 WDL-F3B Outlet Valve OP*
WDL-V315 WDL-F3A, B Bypass Valve CL WP' 18 ABST Inlet Valve OP
~.
WDL-V237 ABST DW Inlet Valve CL
- OPEN if in service.
67.0 191 lig s
2104-4.1 Revision 0 3
05/13/77 APPENDIX A I
Valve Line-Up System: WDL Misc.
Radwaste Discosal Misc. Lio.
Valve No.
Description Position t.li ti a l s WDL-V314 ABST N Inlet Valve OP 2
WDL-V351 ABST Gas Analyzer Outlet Valve OP WDL-V219 WDL-PI-2202 Iso. Valve GP WDL-V220 WDL-LG-1378 Hi Isa. Valve CP WDL-V221 WDL-LG-1378 La Iso. Valve OP WDL-V225 ABST Drain Valve CL WDL-V318 ABST Drain Valve CL WDL-V319 ABST Drain Valve LL WDL-V226 ABST Outlet to WDL-P4A Valve OP WDL-V320 ABST Outlet to WDL-P48 Valve OP WDL-V410 DW to WDL-P4A, B CL WDL-V346A WDL-PS 1372 Iso. Valve OP WDL-V346B WDL-PS 1373 Iso. Valve OP WDL-V1049A WDL-DPI 3632 Hi Iso. Valve OP WDL-V1050A WDL-DPI 3632 Lo Iso. Valve GP WDL-V1049B WDL-DPI 3633 Lo Iso. Valve OP WDL-V1050B WDL-DPI 3633 Hi Iso. Valve OP WDL-V304 WDL-PT 1605 Iso. Valve OP WDL-V809 Caustic & Sulphuric Acid te Neut.
Tank Valve OP WDL-V3734 DW to WDL-T8A Valve LL WDL-V373B DW ;a WDL-T8B Valve CL WDL-V915 Misc. Waste to !!WHT or Unit i Valve OP 68.0
~
l9 m.
m e
..m.e==
i.
2104-4.1 Revision 0 05/13/77 APPENDIX A Valve Line-Up System: WDL Misc.
Radwaste Discosai Misc. Lic.
Valve No.
Descriotipn Position Ini tial s -
WDL-V371 Misc. Waste to Unit 1-LOCKED CL WDL-V372 Misc. Waste to Unit 1 LOCKED CL WDL-V439A Boric Acid Flus: to WDL-T8A Valve CL WDL-V4398 Boric Acid Flush to WDL-T88 Valve CL WDL-V628 WDL V235B Inlet to WDL-T88 Drain Viv.
CL WDL-V629 WDL-V236B Inlet to WDL-T8B Drain Viv.
CL WDL-Y907 WDL-T88 Inlet Drain Valve CL WDL-V287A WDL-LG-1364 Hi Iso. Valve OP WDL-V288A WDL-LG-1364 Lo Iso. Valve OP WDL-V287B WDL-LG 1367 Hi Iso. Valve OP WDL-V288B WDL-LG 1367 Lo Iso. Valve OP WDL-V238A WDL-T8A Drain Valve CL WDL-V238B WDL-T8B Drain Valve CL WDL-V239A WDL-T8A Outlet Valve OP WDL-V2398 WDL-T8B Outlet Valve OP WDL-V1051A WDL-OPI 3642 Hi Iso. Valve OP WDL-V1053A WDL-DPI 3642 Lo Isa. Valve OP WDL-V10518 WDL-DPI 3643 La Iso. Valve OP WDL-V1053B WDL-DPI 3643 Hi Iso. Valve OP WDL-V375A WDL-F4A Vent Valve CL WDL-V375B WDL-F4B Vent Valve CL
~
WDL-V376A WDL-F4A Drain Valve CL 69.0
\\
$0
~
4:u4-4.1 Revision 0 05/13/77
?
APPENDIX A Valve Line-Up System: WDL Misc.
Radwaste Discosal Misc. Lia.
Valve No.
Description Position Initials WDL-V3768 WDL-F4B Drain Valve CL WDL-V560 WDL-F4A Inlet Drain Valve CL WDL-VE58A WDL-F4A Outlet Drain Valve CL WDL-V55SB WDL-F48 Outlet Drain Valve CL WDL-V561A WDL-F4A Outlet Drain Valve CL WDL-V561B WDL-F48 Outlet Drain Valve CL WDL-V906 WDL-F4A, B Outlet Drain Valve CL WDL-V396A WDL-DPIS-3644 Hi Iso. Valve OP WDL-V1058A WDL-DPIS-3644 Lo Iso. Valve OP WDL-V3968 WDL-DPIS-3645 Hi Iso. Valve OP WDL-V1058B WDL-DPIS-3645 Lo Iso. Valve OP I
WDL-V350 WDL-PI 3636 Iso. Valve OP WDL-V306 WDL-PT 1607 Iso. Valve OP WDL-V327A WDL-F4A to WDL-V100 CL WDL-V327B WDL-F48 to WDL-V100 CL WDL-V307A WDL-FT 1637 Lo Iso. Valve OP WDL-V3078 WDL-FT 1637 Hi Iso. Valve OP WDL-V402 WDL-P18 Discharge Valve OP WDL-V409A WDL-P18 to WCL-TilA Valve OP*
WDL-V4098 WDL-P18 to WDL-Tll8 Valve OP*
WDL-V803A CDT "A" Alternate Sump Pump Discharge q
Valve CL i
WDL-V803B CDT "B" Alternate Sump Pump Discharge Valve CL
- OPEN if in service.
I9l 121
i N
2104-4.1 Revision 0 05/13/77 APPENDIX A 5
Valve Line-Up
_Sys tem: WDL Misc.
Radwaste Discosal Misc. Lic.
Valve No.
Descriotion Position Initials WDL-V289A Drain Header Inlet to CDT A OP*
WDL-V239B Drain Header Inlet to CDT B CP*
WDL-V291A WDL-TllA Drain Valve CL WDL-V 91B WDL-TllB Drain Valve CL WDL-V300A WDL-tr, 2013 ni iso. Valve OP WDL-V301A WDL-LG 3013 Lo Iso. Valve OP WDL-V3008 WDL-LG 3020 Hi Iso. Valve OP WDL-V301B WDL-LG 3020 Lo Iso. Valve GP WDL-V339A WDL-TllA Outlet Valve to WDL-P15A OP WDL-V3393 WDL-TllB Outlet Valve to WDL-P158 OP WDL-V348A WDL-PS 3021 Iso. Valve OP
~
WDL-V348B WDL-PS 3022 Iso. Valve OP WDL-V1054A WDL-DPI 3640 Hi Iso. Valve OP WDL-V1055A WDL-DPI 3640 Lo Iso. Valve OP WDL-V1054B WDL-DPI 3641 Lo Iso. Valve OP WDL-V1055B WDL-DPI 3641 Hi Iso. Valve OP WDL-V349A WDL-PT-3018 Iso. Valve OP WDL-V349B WDL-PT-3019 Iso. Valve OP WDL-V341A Local Sample Valve WDL-P15A CL WDL-V1068A Local Sample Valve WDL-P15A CL WDL-V341B Local Sample Valve WDL-P158 CL WDL-V1068B Local Sample Valve WDL-P15B CL WDL-V406A WDL-F7A Bypas-Valve CL
- OPEN if in service.
~
l 71.0
2!04-4.1 e Revision 1 03/30/78 i ~ APPENDIX A Valve Line-Up System: WDL Misc. Radwaste Discosal Misc. Lic. Valve No. Description Po s i tion Initials WDL-V4068 WDL-F78 Bypass Valve CL WDL-V407A WDL-F7A Outlet Valve OP WDL-V408A WDL-F7A Inlet Valve OP WDL-V407B WDL-F78 Outlet Valve OP WDL-V4CSB WDL-F78 Inlet Valve GP WDL-V342A WDL-F7A Vent Valve CL WDL-V342B WDL-F78 Vent Valve CL WDL-V343A WDL-F7A Drain Valve CL WDL-V343B WDL-F7B Drain Valve CL WDL-V562A WDL-F7A Outlet Drain Valve CL WDL-V5628 WDL-F78 Outlet Drain Valve CL WDL-V397A WDL-DPIS 3638 Lo Iso. Valve OP WDL-V1059A WDL-DPIS 3638 Hi Iso. Valve OP WDL-V397B WDL-DPIS 3639 Hi Iso. Valve OP WDL-V1059B WDL-DPIS 3639 Lo Iso. Valve OP WDL-V337 WDL-Til A, B Inlet Crosstie Valve CL WDL-V299 CDT to Sewage Valve CL WDL-V630 CDT Discharge Line Drain Valve CL WDL-V274 Unit 1 Misc. Evap. Dist. to RCBHT Viv. CL WDL-V275 Unit 1 Misc. Evap. Dist. to RCBHT Viv. CL WDL-V353 CDT to Unit 1 and Misc Waste Sys Valve OP WDL-Vil59 Secondary Lab Drains to CDT CL l t WDL-Vil60 Sec. Lab Drains to Control & Service Building Sump OP
- Reverse position of these valves if secondary lab is contaminated.