Text
.
D K
fga arc %
o UNITED STATES y 1,,
'e NUCLEAR REGULATORY COMMISSION j
W ASHINGTON, D. C. 20S55 3
/.
[ $ $. f l g
f JAN 181979 Docket Nos. STN 50-596 and STN 50-597 APPLICANT: New York State Electric & Gas Corporation (NYSE&G)
FACILITY:
NYSE&G, Units 1 & 2
SUBJECT:
SUMMARY
OF MEETING HELD ON JANUARY 9, 1979 TO DISCUSS ACCEPTANCE REVIEW QUESTIONS FCR NYSE&G 1 & 2.
A meeting was held in Bethesda, Maryland on January 9,1979 with representatives of New York State Electric & Gas Corporation (NYSE&G),
Combustion Engineering, Inc. (CE), and Stone & Webster Engineering Corporation (S&W) to discuss certain acceptance review questions forwarded to NYSE&G in our letter of December 27, 1978.
A list of attendees is included as Enclosure 1.
Background
By letter dated December 27, 1978, we informed NYSE&G that we had completed the acceptance review of its tendered application for construction permits and operating licenses for NYSE&G 1 & 2 and had found it acceptable for docketing with the exception of the Environmental Report.
The Environmental Report was still under review and would be the subject of separate corres-pondence. of our December 27, 1978 acceptance review letter contained a request for additional information.
This request incorporated questions, from the technical review branches, which were developed during the course of the acceptance review.
A meeting was arranged, at the applicant's request, in order to discuss certain of these questions.
Discussion NYSE&G stated that it appreciated the opportunity to come and discuss the acceptance review questions in a meeting with the staff and hoped that the result of the meetinq would be a clear understanding with the staff as to the level of detail and amount of information that was expected in response to our request for additional information.
A clear understanding of each question early in the review process hopefully would insure that NYSE&G's responses would contain the quality and quantity of information desired by the staff.
416 102 79012600 %
b
JAN 181979 A list of the questions discussed and the technical review branches involved is included as Enclosure 2.
These question numbers correspond to the questions contained in our acceptance review letter to the applicant.
The discussion covered the following three broad areas:
Area 1 - Questions for which the applicant desired further explanation or amplification or desired to know the staff positions.
Area 2 - Questions for which the applicant felt adequate information was presently available in its application.
For these questions, the applicant provided the location of this information by cross-referencing the NYSERG 1 & 2, SWESSAR-P1, and CESSAR System 80 PSARs.
The aoplicant's response to these questions will identifv where this infonnation can be found.
A_rea 3 - Questions which the applicant felt did not fall within the scope of the review under the Commission's standardization program.
Conclusions Most of the questions for which NYSE&G requested clarification were covered during the meeting.
A few questions required a follow-up telephone conversation on January 12, 1979. The applicant stated that it felt it could respond to the majority of the acceptance review questions by mid-Some of the questions in Hydrology and Geosciences would Februa ry, 1979.
require a little longer to answer, but NYSE&G expressed the belief that this infon,ation could be provided by mid-March,1979. The applicant also requested to know when it could expect to receive the acceptance review questions from the Instrumentation & Control Systems Branch, since we stated in our acceptance review letter that these questions would be provided at a later date.
The applicant was informed that these questions should be provided by the end of January, 1979.
O c&d &~
Robert Capra. Project "anager Light Water Reactors Branch No. 7 Division of Project Manacement 1
Enclosures:
As Stated cc w/ enclosures:
See next page 416
- 103,
10 079
. Mr. Allen E. Kintigh, Vice President - Generation New York State Electric & Gas Corporation 4500 Vestal Parkway East 13902 Binghamton, New York Roderick Schutt, Esq.
Huber, Magill, Lawrence & Farrell cc:
99 Park Avenue New York, New York 10016 Andrew W. Wof ford, Vice President Long Island Lighting Company 175 Old Country Road Hicksville, New York 11801 Edward M. Barrett, Esq.
General Counsel Long Island Lighting Company 250 Old Country Road Mineola, New York 11501 E. J. Walsh, J r. E sq.
General Attorney Long Island Lighting Company 250 Old Country Road Mineola, New York 11501 fis. Anne F. Curtin R. D. 1 Box 82A40 Valatic. New York 12104 A 4 I
EfJCLOSURE 1 ATTENDEES LIST QRC R. Capra LPM J. Lane SE8 J. Wing ETSB S. Wastler GSB TJYSE&G A. Zallnick CE C. Brinkman A. Tuzes S&W B. Schultz D. Jones
[t 16 105
ENCLOSURE 2 LISTING OF QUESTIONS DISCUSSED Area i questions
- PSB MEB SEB RAB GSB HMB OLB 40.3 112.1 130.1 331.1 361.4 372.6 441.2 40.5 130.2 331.3 361.5 372.12 441.3 40.6 361.7 361.8 Area 2 Questions
- PSB ETSB 40.2 321.1 40.7 321.2
- - Area 1, 2, and 3 categorization is explained in the text of the meeting summary.
4i6 106