NT RAGI OA*LY L" TIT PC'4IR IIVIL Dcchet No.
50-320 Unit TMI-2 Cate 12-15-73 Oc=pleted 37 L. 'J. Hard inz m Nove=ber 215-721-6576 Telerhone DAY NTERAGI DAILY PC'JER TZlIL DAY A'7IRAGE DA*LY FC'JE3 T.I7IL (M'Je-Net )
(M'Je-Net )
1 87 17
-10 2
689 18
-10 3
930 19
-10 h
-39 20
-19 5
557
-33 6
327 22
-36 7
161 23
-9 8
-37 2k
-6 o
-38 25
-6 10
-20 26
-6 li
-5 27
-6 12
-5 28
-9 13
-4 29
-11 1h
-4 30
-12 15
-5 31 16
-7
- The negative numbers indicate that = ore power was used by the unit than was produced by it.
These numbers are included for your infor=ation only.
o. O'35 s
7 81219 0 IM
CFIRAT 3G DATA RI?CET Oceket No.
50-320 Date Dece=ber 15, 1978 Cc=cleted By L. w. Harding
'rIFAT2NG S"'A"'"5 Telephcne w -1 1-o;'o 1.
Uni: Nme:
%.. veto re i,- a ne-,
2.
Feperting Peried: November 3
Licensed ""hemal Pe er (K4t) :
2772 L.
Na=eplate Rating (Gross M4e):
901 5.
Desi.n Ilectrical Rating (Net YJe): 900 6.
Max. Cependable Capaci*y (Gross Tie); 930 7.
Max. Cependable Capacity (Net Y4e):
380 3.
If Changes Cccur in Capacity Ratings (Items No. 3 thrcugh 7) Since Las: Repcrt, Give Reasons:
9
?cver Level to which Restricted. If Any (Net Tie):
10.
Reasces fer Restricticns, !f Any:
720 5948 5948 11.
Ecurs in Reporting Period 1s"a 1,1'3,
1,l'*'
12.
No. of Ecu s Reacter was Critical 13 Reacter Reserve Shut:ievn Ecurs 523.1 3031.5 3031.5 ik.
Ecurs Generater On-Line 108.6 788.2 788.2 15 Unit Reserve Shutdevn Ecurs 0
0 0
16.
Gross "'hernal Energy Generated (K4H) 24:327 1111683 1111683 17.
Gross Elect. Inerg Generated (F4E) 81437 344251 144'c1 13.
Net Electrical Energy Generated (K4E) 67300 223870 223870 19 Unit Service Facter N/A N/A
'U 2 N/A N/A N/A 20.
Unit Availability Facter 21.
Unit Capacity Facter (Using MDC Net)
N/A N/A N/s
'OA N/A N/A 22.
Unit Capacity Facter (Using OIR Net) 23 Unit Forced Cutage Rate N/A N/A N/A 2L.
Shutdevns Scheduled Over Next 6 Menths (?,,ge, Cate, and Ouratien of Each):
m _
25 If Shut Jcvs at End Of Reper; Pericd, Estimated Cate cf Star up:
12/4/78
- 26. Units n Test Status (Frier to Cc=cercial Operatien} -
FCRECAS' ACHITIID UI."IAL CRI"'ICAL. "'I 3-9-78 3-38-79 INI*!AL ILIC"'RICITY 3-15-73 4-21-73 CCMME5.CIAL GFI?A C ON 12-31-73 3.C M)
SIGNIFICANT OPERATING EXPERIENCE TMI Unit II return to service at 1400 on Nov. 1, a t 20%.
Reactor power was increased to 90% power. While holding power at 90% for Xenon equilibriu=, and fceewater pu=p (FW-P-13) tripped, and the unit ran back to 60P. pcwer.
The unit returned to 90% power on Nov. 2.
At 2348 on Nov. 3, the unit tripped frca 90~ power on high pressure due to a loss of feedwater. This occurred when an instrument technician mistakenly openal the control power supply breaker to the condensate polisher control panel causing all polisher outlet valves to close.
The unit returned to pcwer at 0235 on Nov. 5, and pever was escalated to 907..
Power doppler coef ficient tes ting ec==enced on Nov. 7, During the test sequence at 0523 heater drain pumps LA and 13 tripped causing a loss of a condensate booster pu=p and =ain f eed pu=p 13.
The unit started a run back to 60; power, but the reactor tripped on variable low pressure /ta=perature at a reactor power of 62%. High pressure injection accc=panied this trip and the DH-V-3A and SB valves from the sodium hydroxide tank opened allowing sodium hydroxide to be injected into the Rcactor Coolant Systes.
Sodium cleanup of the pri=ary continued until Nov. 10 when unit cocidown co==enced.
On Nov. 11 the unit entered an outage to rc=ove the startup scre ans throughout the secondary plant.
Outage work co=pleted on Nov. 20, and unit heatup co== enc ed.
On Nov. 21, sa=ples indicated that the condensate system was contaminated with oil.
On Nov. 22 the unit entered Mode 5, and draining of the condensate storage tanks and the cendensate syste=s cec =enced.
On Nov. 26, the condensate system was refilled, feedwater heating established and recirculation of the condensate system cc==enced in an ef f ort to re=ove oil residue.
On Nov. 27 the condensate system was drained. On the 28th it was refilled and normal feedwater cleanup ce=senced.
At this writing plans are to cc==ence unit heatup when f eedwater chemistry is within specification.
SIGNIFICANT MAINTENMCE 1.
Replace emergency feedwater reducer on "3" heater and conducted repair hydro.
- 3,f'34.1l u
N cket No.
50-320 lHiIT SIIUTDOWNS AND POWER REDUCTIONS Unit Name THI-2 IlEPOllT HONTig November 5
Completed liy I..
W. lia r.lin g 215-921-6576 Telephone 4
g Gyatem Component Cause and Corrective 1
n^
No.
Date Type 3g g
a 4
Code 5 Action to I
Code ej g o gq gy Prevent Ilecurrence P$
'g j,9 g,, Sg 0 '! f dN'd s
E $$ $
NNm 12 11-1-78 F
14.25 A
1 lireakth>wn of insulation on the No. 7' Exciter, Bearing (Generator off 1ine) 13 11-3-78 F
26.75 G
3 I.oss of power to Condensate Polishing Valuu (Generator off line) 14 11-7-78 F
>70.4 A
3 Condensate lionster P amp t ripped t herchy tripping the Feedwater Pumps (Generator of f line) l 1
l I
i CA i
O i
ff i
IF; Forced 2Eeason; 3"#
" Exhibit G - Instructions S: Sehetuled A-Edluipment Failure (Explain) for l'reparatf or, of Data Ent ry Sheets for Licensee 5-Maintenance or Test Event Iteport (LElt) File C-Nefueling
- f["
(NUltEG-0161 ),
j Itegulatory llestriction g
{ Operator Training & Licensee Examination s-I
?-Administ.rative SExhibit 1 - Game Source G-Operational Error (Explain)
I H-Other (Explain)
Docket !!o.
50-320 (flilT Sillfi'DWfl3 AND POWFil HEDllCTIONS r
huit flame
'l H i - 2 HEP 0HT HollTil Octol.er Date 12-15-78 Completed liy I..
W. liarding 2I N'
Telephone t
s>
l S7 M;
U System Component Cause and Corrective No.
Date Type cu U
N
'd wo o O' Code le Code 5 Action to N :r:
.o,9 U N
- s.
Prevent Hecurrence
- v 0
o es 43 El
+2 0
64
,[3 43 E8 8J II O
- 1 a' O O
- sa v,11 O v4 x en nr.
,a am 5
10-5-78 S
181 B
2 The outage was extended due to conax connector problems on the steam generator 6
10-11-78 F
4.0 A
NA The turbine generator was taken off line to repair a hydraulic le ak on GVF2 7
10-14-78 F
3.2 A
3 The turbine tripped due to a feedwat er puiup problem. The reactor then tripped on low pressure due to manually overcosupensating f or the turbine trip.
8 10-14-78 F
10.5 A
3 Feedwater pump problem 9
10-17-78 S
1.1 B
NA Main generator differential relay problems 10 10-20-78 F
4.1 A
NA Hain generator differential relay problems 1I 10-21-78 F
2.5 A
NA Hain generator differentla1 relay problems t
Og 12 10-28-78 F
90.1 A
1
!!reakdown of insulation on the #9 excitor g
bearings k
2 enson; 3
~
IF Forred H
Methodi S: Schedialed A-Eiluipment Failure (Explain) 1-Ma nu al
'E"#"
Entry Sheeta l'or 1.icensee h-Muintenance or Test 2-Ma nu al Sc ra m.
Event Heliort LEH F le C-Hefueling 3-Automatic Ucram.
{
~ g)
D-Hegulatory Heutriction Is-Other (Explain)
E-Operator Training & Licensee Fxuminut.f on F-Administrative G Operational Error (Explain)
Ex hi bi t 1 - Same Source ll-Other (Explain)
I