Forwards IE Insp Rept 50-320/78-29 on 780914-15 & 19-22.No Noncompliance Noted
ML19224A275
Person / Time
Site: Crane 
Issue date: 10/18/1978
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Herbein J
METROPOLITAN EDISON CO.
Shared Package
ML19224A276 List:
References
NUDOCS 7812010280
Download: ML19224A275 (2)


See also: IR 05000320/1978029

Text

-

,%

(SArK*SL fLLES

f" " %

UNITED STATES

k

NUCLEAR R EGULATOR Y COMMisslON

,, e(

Q

REGION I

,

,

631 P ARK AVENUE

KING ovr PRuss: A, PENNsYLV ANI A 19406

o,

9

,

f

g vg g

,

% .*

Docket No. 50-320

18 JCT 1978

Metrocolitan Edison Company

ATTN: Mr. J. G. Herbein

Vice President - Generation

.

P. O. Box 542

Reading, Pennsylvania 19603

Gentlemen:

Subject:

Inspection 50-320/78-29

This refers to the inspection condu:ted by D. Haverkamp of this office

on September 14-15 and 19-22,1978, at .your corporate office and at the

Three Mile Island Nuclear Station, Unit 2, Middletown, Pennsylvania, of

activities authorized by NRC License No. CPR-73 and to the discussions

of our findings held by Mr. Haverkamp with Mr. J. Seelinger and other

members of your staff at the conclusion of the inspection, and to a

subsequent telephone discussion between Mr. Haverkamp and Mr. Seelinger

'

on Septemoer 27, 1978.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

-

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any infonnation that you (or your contractor)

believe to be proprietary, it is necessary that you makt a written

application within 20 days to this office to withhold such information

~from public disclosure. Any such application must ce accompanied by an

affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement

of reasons which addresses with specificity the items which will be

considered by the Comission as listed in subparagraph (b)(4) of Section

2.790. The infonnation sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not

g

hear frcm you in this regard within the specified period, the report

t

'

will be placed in the Public Document Room.

'

781201oMso

\\

$7)

2.zas

-

-

.s

,

Metropolitan Edison Company

2

18 OCT 1978

No reply to this letter is required; however, if you should have any

questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely

/Y

-

-

a

n_

_

_

Eldon J. Brunne , Chi

Reactor Operations and Nuclear

Support Branch

Enclosure:

Office of Inspection and Enforcement Inspection

Report Number 50-320/78-29

cc w/ encl:

T. Broughton, Safety & Licensing Manager

J. J. Barton, Project Manager

R. C. Arnold, Vice President, Ganeration

L. L. Lawyer, Manager, Generation Operations - Nuclear

G. P. Miller, Superintendent

J. L. Seelinger, Unit 2 Superiritendent - Technir 1 Support

I. R. Finfrock, Jr.

Mr. R. Conrad

G. F. Trowbridge, Esquire

Miss Mary V. Southard, Chairman, Citizens for a Safe Environment

(Without Report)

s

i

i

2.23G