8.'
'_j..
WAf ]:;r;"1I
/
ey.;;;., ~.". - -
^
METROPOLITAN EDISON COMPANY :vestoiaar or atnenst rustic uritories coaronariou POST OFFICE BOX 542 READING. PENNSYLVANI A 19503 TELEPHONE 215 - 929-3601 Septe=ber 18,19T8 GQL 1532 Mr. B. H. Grier, Director Office of Inspection is Esforcement Region 1 U. S. Nuclear Fegulatory C~-i ssion 631 Park Avenue King of Prussia, Pennsylvania 19h06
Dear Sir:
Three Mile Isler.1"uclear Station Unit 2 (3I-2)
Operating License No. DPR-73 Docket No. 50-320 Inspection Report No. 78-2h This letter is in response to the subject inspection report resulting fres
- r. Haverka=p's inspection of July 18-21 and July 31-August 3,1978, and the Jindings thereof. Belov is the response to the infraction referenced in the subject inspection.
~
Infraction 10 CFR 50, Appendix B, Criteria 7,. states in part:
" Activities affecting quality shall be prescribed by... procedures and shall be acconplished in accordance with these
.. procedures...". The accepted Operational Quality Assurance Program (ISAR Section 17.1.5.1) states, in part:
"The Met-Ed Quality Assurance Plan... contains the require =ents that activities affecting quality be docu=ented by in-struction, procedures...".
Mechanical Construction Procedure, MCP-2-2, Revision 12, specifies the requirement that veld rods, if not issued, shall be placed in holding / storage ovens and raintained at 250 F + 25 7.
Contrary to the above, on July 20, 1978, the holding / storage carnace centaining the lov bydrogen veld rods vas found to be at an indiccted temperature of 1900F.
Corrective Actions Taken Since the holdin6/ storage oven was deter. ined to be deficient, it was prcmptly vithdravn from service and repaired. The veld rod involved vas re=oved from the holding / storage oven and returned to the bake oven
(
for re=cnral of any additional hydrogen.
7 T5 lo l ci oco \\
og-;3 1.200
SePte:D8r 10.1976 3. H. Grier, Director GQL 1532 Future Recurrence _
Corrective Stecs Taken to Prevent any The requirenents of MCP 2-2 vere reemphasized to the responsible construction personnel.
l 20, 1978 through Ju y control was conducted over the period frcm July Periodic QC inspections 31, 19T8 with ao unresolved problems identified.of rod evens h f
specification te=perature conditions.
Sinc erely,
/
J. G. Herbein Vice President-Generation JGH:JRS:cjg C..
g2C1 1