ML19221A524
Jump to navigation
Jump to search
| ML19221A524 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/18/1979 |
| From: | Vollmer R Office of Nuclear Reactor Regulation |
| To: | Herbein J METROPOLITAN EDISON CO. |
| References | |
| NUDOCS 7905230130 | |
| Download: ML19221A524 (1) | |
Text
- Wf
~
0 4
UNITEo STATES yy
-t NUCLEAR REGULATORY COMMISSION WASHINGTON. o. C. 2C555 s., m,
Docket No. 50-3'O Metropolitan Edison ATTN:
Mr. J. G. Herbein Vice President - Generation
Dear Mr. Herbein:
Technical Specification 4.3.3.4 is hereby amended to permit the channel calibration currently required to be performed by no later than April 29, 1979, to be extended to no later than 14 days following establishment of stable conditions in cold shutdown.
This one time extension does not include relief from the requirements of Technical Specification 4.0.2.6 during subsequent surveillance time intervals.
Sincerely, IS R. ' H.
Vollmer e
a N
79052301M M 002 o
u