Text
A s
Apri1 4, 1979 Q hQ NOTE TO:
J. Collins W.
Kreger G. Mazetis T. Novak Please give me any notes appropriate to attached material by 9:30 A.M. on April 5, 1979.
Dick Vollmer cc:
R. Mattson /
V. Stello D. Ross 6
163 356 7 905 23 0/g g
~
=esec Q
b:
METPsO PO LIT AN EDISON C O M P A N Y sase,v o, oc,,,,.i w,c u,,ui,,, co,
,2,,o, Sr' ject' DAILY PLANNING MEETING Location TMI Date April 4, 1979 To DISTRI;:,0 TION
, -JGH Memo #
Iocation:
Trailer #22 Time:
10:00 a.m.
Daily The above meetings are being initiated in order to more effectively coor-dinate activities, assign task responsibilities and obtain general agree-ment on the activities for the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period following each meeting.
It is intended that these meetings will be reasonably short.
'Ih u s, it is important th at attendees come prepared to discuss the agenda items and have reasonable alternatives for those they feel are objectionable.
Any attendee wanting to place an item on the agenda should contact the scheduling group in Trailer #21 prior to 8:00 a.m. the day of the par-ticular meeting of concern.
Such items should include a short etatement of the ac-ivity of concern and an indication of the priority the items should be givin.
It is expected that those in attendance will have the necessary authority to approve the daily plan and they will be expected to sign the plat for succeeding 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period.
At t achec is a list of activities to be discussed at the next meeting.
$V J. G.
HERBEIN
- j fg cc:
W.
Creitz J. G. Herbein - 2 copies G. P. Miller /J.
B. Iogan B. Graber (D. Ro s s] R. Vollmer}
W.
Gunn R. C. Arnold /R. F. Wilson R. J. Toole/J. Sheehan D. M. Shovlin J. L. C. Bacho f fer J. Devine J. T.
Faulkner D. E. Hetrick Caservat ion Cen ter Hd. Qtrs.
163 35/
7 File - Trailer # 21-P&S INTER-OFFICE MEMORANDUM 5
DAILY PLANNING MEETIF' AGENDA April 5, 1979 ITEM TASK DATE NO.
COORD.
DESCRIPTION / STATUS REC -' RED
- 1. A.
Miller / Ops.
Degas RCS w/ Plant in current Est complete 5 days mode of operation (4-8-79)
B.
J.
Dev ine How do we track rate of Degas.
h oi s e. pdifs s s of p a sset noise - l..7 2.
Miller / Ops.
Continue to Run No. 2H2 Racombiner Wo'rking 3.
Mill er/ Chect.
- a. Robot Performance Testing for Delayed - can ' t get RCS samples.
in Dev ine
- b. Determine Requirements for Primary Sample 4.
Radwaste Mgrat.
Hook-up Solidification Truck for Gro up/ Tool e Radwaste. Need hose bg6 Tie Think Tank / Rad Con / Plant Staff h g ; /(*
p-5.
Gunn/ Miller Define Need for N2 - Backup supply A
6 Devine De s ign/ Fab. Instl. Shield Plugs at h
/GPU Engr.
DH/ES vaults in Aux. Building.
.jt p.
7.
A.
Gunn Cond. Storage Tanks Require Liquid Waste-Removal-via truck (Determine need for shield wall at condensate demins).
B.
Radwaste g gC Cor::mit.t e e/ Toole Get Method to Process
[
8.
thristman/Shovlin Improve shuttle service for In-Plan t Employees to/from TMI e
site.
9.
Miller / Porter a.
Review list o f Proc. and determine status of each (i.e., not req'd, on-hold schedule, in progress, to PORC, NRC, issued)
Miller b.
Review De generation list each shift change w/ operator 10.
Gunn/ Catalytic Cl e ar Uh s e. at south end of 2 days site for storage of GPU rec 'd materials - Logistics group will set up office.
163 358
ITEM TASK DATE
. NO.
COOP.D.
DESCRIPTION / STATUS REQUIRED 11.
Gunn/B&R Design / install addit ional was te Issue Partial gas hold up facility at BWST area Eng. 4/4 for for t ie-in to WDC - ECM - Issued found at ion and block wall 12.
Cunn/B&R a.
Design / Install tank f arm with Conc e pt ual shield walls to act as processing design on site system. - 1 PM Meeting for re /iew Arnold
- b. Review requirements & scope with y QCANWqp2 hRC Q
w-g hwbbtd 2 13.
Miller / Dubiel Sample air arot I aux. bldg. sump to see if it should be covered.
oystAou 14.
Miller / Ops.
Test on PZR Level - Prepare procedure
& Equipment.
Lo s s o f 2nd level indicator - Go on Heisegage.
15.
Devine MU Tank & Waste Cas Decay Vent Verify MU Tank Line Design a.
b.
Verify D2 cay Tank Line Design 16.
Ibrbein IWT sump to be discharged 17.
Shovlin FH/ AB Vent Filters:
a.
Charcoal - determine available inventory Shovlin b.
HEPA Filters -
Miller c.
Sample to determine need for filter replacement Dev ine B&R/Cobean d.
Provide alternate sct of filters 18.
Miller /J. Col it z Co-ord. personnel to limit exposure of aux, operators 19.
Dev in :
a.
Determine if caustic can be used in AB Sump to maintain ac c e pt ab le lod i. a l imi t s.
Dev in e b.
Determine source of Iodine Shovlin c.
Resample for Iod ine revine e.
Analysis of existing conditions.
e
a ITEM TASK DATE NO.
COORD.
DESCRIPTION / STATUS REQUIRED 20.
w w.5/Guen Responsibility for design of filters for vacuum pu=p.
21.
Chr is tman/ Arnold Describe organizational re-sponsibilities (overall).
22.
Arnold Came plan for use of DH sys.
as cooldown mode, if required.
23.
Dev ine/ Wall ac e RMS De-sensitization 24.
Miller Provide redundant power for RC-V137 & RC-V2 - Prepare DON'T INSTALL.
25.
Miller / Dubiel Update emergency plan for measuring.
high iodine levels.
76.
Devine B6 R/ Cobean Make seismic analysis of main steam lines.
27.
Miller /Limrock Develop access list to Island Security on Island Fire Fighting.
28.
Devine What is structual concerns on
((()#
RB under vacuum.
,elseA^ 9 #[
29.
Lionel Bannon Thermocouples from Incores Neutron signals from Inc o re s.
[w [J 30.
Arnold Provide contingency ef fort lg co-ordinction.
31.
McGoey/GPU Intermediate and long range radioactive waste gas and liquid overall planning and coordination.
163 360
-5