A RAECh A
M UNITED STATES j
- -(
NUCLEAR REGULATORY COMMISSION
",. I
l. y WASHINGTON, D. C. 20555 o q'i
'S O
/
April 9, 1979 NOTE TO:
Roger Mattson Dick Vollmer Bryan Grimes Please give me any notes appropriate to attached
.na te rial by 6: 00 P.M.
today.
Vic Stello
Attachment:
Planning Mtg -
4/9/79 cc:
IE (2) 7900 3003L 0
163 178 a
f 1.
4
,..e Plannino Meetina 4/9/79 1.
Review overdue action items from 4/8 Tech. Mgt. Meeting.
2.
Review " Items Due by 0800, 4/9/79."
3.
Distribute and discuss:
a.
"0800, 4/9/79 Task Lists" b.
4/9/79 "72-Hour Lists" 4.
Excess water
- identify / isolate leaks
- build tank farm 5.
Need Westinghouse schedule for DHR.
h 163 i/9
Page 1 Actions Items Tech. Mgt. Meeting 1700 4/8 Action 1.
Develop liquid waste transfer procedure. Modify currently Cobean available one if possible.
Herbein
- preferred method:
ccntainment sump directly to Aux.
Wilson Bldg. sump tank.
- Stop at 2 R/Hr. in piping; re-evaluate.
2.
CAP-C0 II processing system to be available Thursday.
Cobean Palmer 3.
Plant Mod descriptions (for NRC) to be available by 2400.
Cobean Palmer 4.
Aux. Building & Fuel Handling Building filter changing schedule to be available by 1900.
Palmer 5.
Determine.nethod for determining containment sump liquid Cobean level: raeeting at 2030 (Aux. Building has priority).
Wilson 6.
Schedule for redundant Aux. Building filter system at 2000.
(Equipment has arrived.)
Palmer 7.
Clean-up system for condensor air ejector discharge (HEPA, charcoal filters & heaters):
- Deliver package to plant ops:
1800 Cobean
- Plant ops review and sign off:
2400 Herbein 8.
NRC release needed on increase in boron concentration.
^
NRC 9.
Assume that NRC has until Saturday, 4/14 to review safety analysis report.
163 180
? ' 's. '
Page 2 Actions Items Tech. Mgt. Meeting 1700 4/8 Action 10.
Plant Ops needs the following support from B&W:
B&W a) Procedure for what to do if we lose level Wilson indication in "A" S.G.
b) What action should be taken regarding make-up to "B" generator.
- Site has procedure transmitters on way.
11.
Provide Bob Arnold with history of sampling secondary side of "B" generator by 2200. -
Herbein 163 18i
2 t t ni s uue Oy UbuU 4/ 9/ / 9 e
IAG Prov.de Summary of completed i tems.
Is List of completion dates for Pri. I tasks.
Determine method for determining contain-ment sump liquid level.
Develop procedure to measure gas level
~
by MU Tank Pressure.
Waste Management Identify storage required for liquid waste.
Provide due dates for all tasks.
Provide filter changing schedule.
PH. Mod.
Provide alternates for solid SG cooling system.
Deliver fina'l package for air ejector dis-charge filters.
Locate and design (2) 2500 kW diesel generators.
PH. Ops Determine source of leakage in Aux. Bldg.
Update emergency plan.
Obtain power range reading.
Provide list of bypassed interlocks.
Review and sign off air ejector filter package.
Provide history of sampling secondary side. -
Repair fitting on ma' e-up tank.
Calibrate Heise Gauge.
Draw surized and degassed primary samples.
Qual.
, men to enter Aux. Building.
Establish waste czar.
B&W Li.st of Critical Systems for present condi-tion.
Analysis of In-core thermocoupl ?s during LOF on 4/6 Provide minimum allowable RCS pressure for '1 b3 182 degassing.
Uhat action should be taken regmcding make-up to B Generator.
Analysis of what gas cone.in primary should be.
Provide stress analysis for genera tor- (Point B to C)
~
....., -.. ~,
d' 72-HOUR LIST 4/9 4/10 4/11 4/12 l
l i
i ISLAND PLT OPS Depressurize l
Return to 1000 PSI
[-d Measure Gas Level via Make-Up Tank Pressure Based on TS l-j Procedure Reactor Cooldown to 220 F.
[
Steaming Calib. Gauge /Obtain Coolant i
Sample Obtain Sample of Unit 2 Liquid Waste Tanks Restore Pressurizer Heaters Repair Fitting on Makeup Tank i
to Reactor Building Clear Southend of Warehouse HASTE MGT.
Process Unit 1 Low level Liquid through Cap-Gun Change Existing AB Filters l
-l 163 183
~~i. '
t 72-HOUR LIST 4/9 4/10 4/11 4/12 1
1 1
1 PLT MODS - CONST Remove Unit 2 Fuel Racks
}
Install Main Cond. Vac.
Pump Filters install Vent Stack Monitor
{
Install Diesel Driven Instr.
Air Comp.
i l
AB/FH Filter
?
Staging Steel Foundation
?
Duct a
Filter / Fan g
g B&W Noise Analysis during Degassing g
Core Analysis
}
i63 184
26.
0800 4/9/79 Industry Advisory Group Task Description Priority Status /Date Due Lead Man 1
RecommenA if Pri.
sample worth Complete exposure H
Documented?
Levenson 2
Provide recommen-dation for alter-native methods of P/V control H
3 Evaluate fire in Complete containment H
Documented?
4 Provide documentation of completed items M
Ongoing
- 163 185
- Items Overdue.
~
~ ' '.
'0800 4/9/79 Technical Support Group Task Description Priority Status /Date Due Lead Man 1
Provide additional boiler capacity L
4/10 2
Develop procedure for limiting con-tainment vacuum M
4/10 3
Evaluate need for backup HPI pump (Hydrolaser/
M 4/lC 4
Provide estimate of required HPI flow for 200 to 2500 psi (degener-ated state)
M 4/10 5
Reconstruction of event 6
Increments for pressure decrease H
Complete Devine 7
How to measure rate of' degas M
Devine 8
Increase Letdown flow H
Complete Devine 9
Investigate the use of sample line to degas M
Devine 10 Calculate Reactor Coolant System spray flow M
Wallace 11 Radiation monitor system desensitiza-tion M
Devine 12 Ccnstruct brick wall at Unit 1 HX Vault M
McGuoy
\\
O
2<
0800 4/9/79 Technical Support Group Task Description Priority Status /Date Due Lead Man 13 Provide degeneration procedures A.
Fire in Contain-ment B. Fire in Auxiliary C. Fire in other areas D. Evacuation of control room E. Breach of waste systems 14 Work with B&W to determine procedure to determine gas con-centration.
Deter-1200 ndne leak paths.
H 4/8*
15 Mass Balance 16 Primary water into
~ Aux. Bldg.
17 MPR analysis of 1000 water hammer 4/9 18 Procedure for taking "A" S/G solid 4/10 19 Analysis of solid secon-dary problems 4/11 20 Contingency Plan for site evacuation 4/19 21 Updated plan for emer-gency transfer to natural circulation 4/10 22 Plan for near term NRC interaction H
L.
W.
Ha rding 23 Receive and dissemi-nate reduced plant data H
R.
Long 24 Fire in plant areas procedure H
Klingaman 163 187
- ltens Overdue.
'-A 0800 4/9/79
~
Jechnical Support Group Task Description Priority Status /Date Due Lead Man 25 Evacuation of Control Room Crimmins/
procedure H
Cunningham 26 Procedure for loss of SG Broughton/
heat sink H
Pope 27 Procedure for determining gas level in RCS by M/V Broughton/
tank pressure increase H
Lowe 28 "B" SG Closed Cooling System.
Criteria / approval (P.B.8.a.)
H Slear 29 Back-up Reactor Pressure Control System (active).
Criteria / approval (P.B.4.)
(P.C.4.)
H Slear 30 Reduce water level in Reactor Building -
Criteria H
Slear 31 System to measure water level in Reactor Building.
Criteria / approval H
C. Capodanno 32 Boron Concentration recom-mendation in Reactor Coolant System H
33 Provide criteria for deter-Natural circula-mining if natural circula-tion analysis in tion is not achieved from progress at B&W, T. Crimmins/
results of instrumentation.
H EI, W, and IG&G Cunningham and GPUSC
0800 4/9/79 Plant Operations Task Description Priority Status /Date Due Lead Man 1D Verify let-down
~
valve alignment of make-up system H
4/8 Miller lE Restore Pressurizer
~
Heater H
Ongoing Porter 2B Determine urgency regt. for primary sample Complete Herbein
'3 Improve TLD methods Grayber/
limit exposures H
Complete Bachofer 4
Determine source of high Io. dine-AB elevator H
4/8*
Miller 6
Repair fitting on make-up tank to reactor bldg.
H
. Miller 11 Qualify 5 men to enter Aux. Bldg.
H Limroth 14 Clear south end warehouse M
Gunn 16 Design / Install filters at vacuum pump dis-charge M
Gunn 19A Control / room Island access 1st M
Limroth B
Security M
Stacy C
Fire-fighting readi-ness / procedures M
Miller 22A Develop list of
}[
Plant changes M
Miller B
Establish control
\\
room change control log M
Miller H16A H16A Define Organization and Charter M
Troffer B
Develop list - Backfit to 3/28 trip M
Porter /Tro f fer
- Items Overdue.
~
0800 4/9/79 Plant Operations Task Description Pzicrity Status /Date Due Lead Man 23 Procedure for Plant condition upon evacu-ation.
Update emer-gency plan H
Miller 15 Install portable IWT system M
Gunn Draw primary sample H
4/8*
Obtain readings from 8 chambers of Power Range H.
4/8*
Obtain "B"
OTSG diller/
Sample H
4/7*
Shift Supt.
Provide list of interlocks being 1200*
bypassed H
4/8 Water out o f sump H15 Ensure tagging and valve positioning to maintain contain-Miller /
ment integrity H
Shift Supt.
H19 Prepare Organization charts:
M flaint.
B.
Shoolin Manpower C.
Colitry Quality Control D.
Tro6fer Security E.
Stacy TWG Incl. S/U rqmts.
A. To o l e/ tiel s o n H23 Calculate curie release parameters to ensure acceptable limits.
Prepare sample procedure Graber/
for air / liquid release Porter /
rates - in/out plant M
Faulkner 163 190
- Items Overdus.
S e
~'_
0800 4/9/79 9
Plant Operations Task Description Priority Status /Date Du_e Lead Man H7B Determine when W can access Aux. Bldg.
Notify Gunn/
Cobean Limroth HSB Supply list of pressure instrument on Rx vessel -
span - actual reading -
preferred instrument H4 A. Establish spill ctrl.
procedure Limroth B. Provide organization set-up on Turb. Bldg. Operating floor Graker C. Get Geli set-up at south bridge Graker H3A Take primary sample to Miller /
evaluate core conditions H+
Staff Supt.
H6A Arrange MSA to test new Gunn/Graker/
filters - (00P test)
M Palmer H1C Review ventilation effects when FH o/s door is opened -
also survey request by HP H
Limroth I63 19i
-=...
~
0800 4/9/79 Waste Management Group Liquid Waste Task Description Priority Status /Date Due Lead M'n a
ll Tank Inventory McGoey -
Status H
Underway Plant Opr.
23 Assessment CAP-GUN McGoey -
system H
Underway Tornes 14 Arrangement Study-RB Contaminated Water M
18 Flush System for AB Components M
8 Determine Leakage Paths from Unit 2 to Unit 1 L
16 D/C Liquid Wastes Processing System Long Term 19 Additive to Primary Water Long Term 21 Reac*.or Building Sump Le. vel Measurement Long Term Gas Waste 1
AB & FHB Filter Trains
.H Underway Hirst /Dorn 4
Evaluate and Upgrade Gas Release Monitors H
Underway Yarborough 5
Replace Charcoal Pavlick/
Filters H
Underway Fitrull 15 D/C Emergency RB j g z 1 oq Gas Purge Clean-up IUs I/L System H
Underway B&R e
'N' 0800 4/9/79 3
Waste Management Group Gas Waste Task Description Priority Status /Date Due Lead Man,
7 Condensor Off-Gas Discharge Filter M
Underway Hirst 9
Preheaters to FHB Vent Filters M
10 Preheaters to FHB Vent Filters M
General 20 Develop Waste Manage-ment Game Plan Long Term Palmer 24 Organize an Inte-grated QA'd Radia-tion Survey H
Lee / Palmer
. Sample AB/FH Bldg.
for filter replace-ment indicating acceptable operation H
McConnell Provide alternate set of filters M'
McConnell Determine best solu-tion to be used in Aux.~ Bldg. to main-tain acceptable iodine limits' H
Comple te McConnell Design Shield Wall at condensate domineral-izers M
McConnell Provide 1 page descrip-1600*
tion of cach Plt Mod.
4/E Obtain water sample from Unit 2 Contain-ment Sump H
Prepare contingency plan for Direct Water juJ47 f n j-Transfer from U-2 to y
Fuel Pool M
- 1tems Overdue.
0800 4/9/79 Waste fianaaement Group General Task Description Prioritt Status /Date D e Lepd Man Determine disposition of water:
short term H
medium term H
Determine sources of leakage to environment H
Provide Filter Changing 0800 Schedule H
4/9*
Tank Farm in Fuel Pool "A" H
Design underway Snyder 163 194
- Items Overdue.
0800 4/9/79 s.
Plant Modifications Task Description Priority Status /Date Due Lead Man WG-l' Install new AB/FH
'ilter/ structure H
4/1 Tie-in to HVAC WG-2 Decon. Aux. Bldg.
- Frickle, using cap-gun Ion
- Shlosher, exchange process H
4/16 Squilauti TS-1 Recommend methods to improve relia-bility of implant electrical supply H
4/11 TS Develop package for secondary side cooling of S/G3B H
4/12 TS-3 Develop Package for use of secondary services cooler 4/'9 TS-4 Design system for measuring water level in containment L
4/10 TS-5 Develop method for flooding containment with'10b ft of water L
4/10 3
TS -6 Desigdinstall system for pressure make-up control of RCS H
4/10 106' Design / procure HEPA and charcoal filters for con-denser VP discharge Complete Install same 4/B*
1064 Review S/G cool-down scheme for reliability Complete 1082 Recommend portable filters for Aux. Bldg.
(location, type, power source, etc.)
Comple te
- Items Overdue.
163 195
0800 4/9/79 Plant Modifications Task Description Priority Status /Date Due Lead Man 1085 Design temporary On schedule shielding covers complete 4/7 for DHR pits 1103 Evaluate line-up
(?)
'o use one decay heat and one spray pump on Hold 1004 Get design for waste gas to' Cont.
Bldg.
Complete 1108 Review B&W natural circulation cooldown proc.
Complete 19 Determine Aux. Bldg.
TV locations to moni-tor DHR components (Mark up General Arr. )
Complete 39 Provide electrical 80% on hold since power supply for not needed for 2 cross connecting RB
- weeks, with FHB purge filte rs 45 Determine leakage paths Unit 2--Unit 1 Complete 52 Design supports for John Lucena to Cond. H line to sur-arrive site 4/7 face condenser H hot with sketches CO-C-IB to make it as calcs seismically capable as feasible 53 Investigate supply of new charcoal trays for Aux. purge in fuel handling system Complete 56 Examine lE diesel generator to determine if BOP loads can be added Initiated 4/4 j g )7 ~ jof i U l /0 S
n
.V.
0800 4/9/79
~
Plant Modifications Task Description Priority Status /Date Due Lead Man 64 Review alternate cooling source for secondary Initiated 4/4 65 Design waste gas system for pump down of ItB to fuel pool Iilit ia ted 4/4 63 Supports for M.S.
system in Turbine bldg. when filled (related to #52) 66 Location for secon-dary plant diesel Assigned 4/4 70 Max P&T for DiiR downstream of Valve DH-V3 Assigned 4/5 73 Badk-up Power Source for secondary plant loads Assigned 4/5 74 Review fire protec-tion for charcoal filter Complete Design / Fab / Install shield plugs at Dil vaults M
Provide 1 page description of each Pl! modification H
Complete Static and active level control criteria H 4/10 163 197 O
8 e
0800 4/9/79 Plant Modifications Task Description Priority Status /0 ate Due Lead Man TS-7 Augment instrument air system (design)
Completed TS-8 Design / install aircraft hardened decay heat system Design - 4/20 housing H
Install - 5/31 TS-9 Procure / erect augmented instrument air system 4/10 TS-10 Locate and design (2) 2500 kW diesel generators 4/8*
TS-11 Develop Electrical Distribu-tion System.
Install cable /
switchgear (2) 2500 kW diesel generators 4/10 WG-3 Containmert vent stack moni-tor HPR-219 recovery system 4/10 WG-4 Prepare status board 4/8*
WG-5 Determine decrease in structural margin for the Aux. Bldg.
(Aircraft impact) 4/11 WG-6 Install storage vessels - fuel storage pool of Unit 2 (Pool "A")
4/10 163 198
- Items Overdue.
{
. -u...,
-x t
.-.8.
c
- 5. 5. N,,.. f/C,,l,_, 1.2, 7 2. 4-c-w t U ','
I'
{
i
.)as. ! "/ 7*i hC/
~~
.w. :.
i
. A. _.g.._ '...._.. r g 3
- ;;(s...,.
. n4s ~.
r
~.
....s w
"' ",- _ "'~~'
n B.- _.C.I m'...._c.o.:n, 1._a p v> d
!'O.'?._ M Q k.6 c._..._
~
_ w cw.5...-
=
" 2. l%.;;;fJmi%.&-
C> P 0 -. ^.. - -_ --..
___5. %,. fr}v
%....,.e.7 L e w %.. fd;>. ']- -.. -. :. " ~
v3
.__f A -
P ;WD-o] n P; 9 d c w.-_-,'.
.. _.. '. _... '.)()f.-Ufl*+a' &. _ _ -__..._
-- -.Q
(
- tt
(
4 a
_ f. O_ra%_r %_ P c r -i-J h d h i w {...
- u l _. * - _.
7
.:m i r ( c c. [c
'. G P...-
O 1
__,.n,, a~ d
._. % da d e d c h n D H S *l s_ __
(,-Po-W p w t.c.
7A. %._k...'d..r ~.w--d h & 'fr..h..
- -._ *.7)%.-..._ 5_. & _.-
S cl..Oc=ni i p_ma.6 Icc A 6x- # 4-c.- - l u.g 50e M 3..__
A.
1 o...__
..1_O /Tr r%q.e_..~.(>.r. W ed. On~5 W-
._. o_..._ Dh..._.. r w e.h.s p u b.
.v e. eA. s..
W
~
I _.
C o.' 4.d c. @..p :- S u o e d e A s ~- t a\\ w
~
p.
D 13
- k. dc v w E b. b_ T T D ' (>-FDT.TT' 5 N'.I t'o.,
S M u pT N_ V,EL f_cO './ ht V E_.. _ '.. L ). -
1 Y
_ _ __i. __ tr.C. u.o w
.P2..O d U M*T
...; ( E~d_..>f N GT? G P e 'T Q A T M P % M.a; #, h d- $ S'lc.w.A t
.G. _
C b57 tin for$a.h!C kc"_. c.2 lr.
_. l (,
td
.. l
..1_....
...__.a_.
/
./
_ - -. _.C v M/r.
,s
. _ _... _._. _. _._.. i d.. M _ L ' t i L. R. Q i
E.
'.'s'
}[ _~.,_*s.,_.. _,....;* ' -.
. ~. _.. _. _ -. _ _
w--
O.s
.c.
.u..
s
.q,
'. p r. [.,
- ~
~ ', -
1:
- . ;;. *~;;'--*----
. v..,, m. 4..:..i.a.c..=.
1
.i..
- s,.._.g..
_...s v,
^.
p a.,..
_... _..... _. _... _. - ~ _..
~.
.. ~.
...... _.... _. ~., _..
- 2..:. ;- 7. %.4. 4 ;. -r..-n. p.i;,.,
.,5,
'~
~
y.
.Y
- < :-(,'
m---..
~. =q =,,..--...(.,.
--'.-~.'<rp--.
o s,.
.- -- - ; :...uw ___..
..~y.. ~p.n. g.....:.,..<
,,.s.
....c er.
._- _ s
. ;.?.E.'\\ {..
'_~;__'_...,-
- .., f;_.,_.
. _. _,, _'^.Tj
~~ { :" A': 1,.. *g.?'.
y.
.av...-
y.y,
'?
... i u,
}
,^
l*?*''
e
.,...6".
~. t v-p,.
m.
....g-
_..._..._g ogha
.he... _. N.h.
..-_..-g
..e.6
....e g g y
grep..
-eg g._g6Ne_m.
e e.
g
.9/
Y e
',f 0800 4/9/79 B & W Task Description Priority _
StatusfDate Due Lead Man 1
Analysis of gas conc. in Primary System H
4/8*
2 Provide list of critical systems for present conditions H
4/8*
3 Analyze In-core Complete - Traces thermocouples dur-provide no useful ing LOF/ON.4/6 H
info.
Documented?
4 Provide minimum allowable RCS pressure for degassing H
4/8*
5 Provide stress Analy-sis for generator (points BtoC)
H 4/9*
6 Determine minimum pri-mary system pressure (point D, Base Plan)
M 4/9*
7 Prov'ide noise analy-s s.of pressure during dagassing H
4/7-4/8*
8 Document of sequence of Plant conditions in base plan L
9
. Develop procedure to determine pressurizer level using Heise Gauge H
4/9*
Rogers 10 Develop procedure for cooldown using OTSG's on natural circulation H 4/8*
Rogers 11 Core Analysis Program M
4/10 Rogers A.'Thermocouples from Incores B.
Neutron signals from Incores 163 J200
- Items Overdue.
- *, -77 0800 4/9/79 B & W Task Description Priority Status /Da te Due Lead Man 12 Provide safety analysis showing long-term cooling is safe, maintain-able, etc. (NRC Review)
H 4/11 13 Reco.mendation regard-ing makeup to B generator H
4/9*
163 201
- ltems Overdue.