Describes New Organizational Arrangements for Shift Activities to Improve IE Coordination
ML19221A264
Person / Time
Site: Crane 
Issue date: 04/09/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19221A263 List:
References
NUDOCS 7905210097
Download: ML19221A264 (2)


Text

-

" " %s UNIT E D ST ATES a,

yq*;

.ot NUCLEAR REGULATORY COMMISSION

}

REGION I j

Z( l 631 PARK AVENUE

  • g y ey,. j
  1. 3. fAM [ g x s u c o F PR tJ5 5 B A, PE *4 N 5 Y LV A NI A 19406

, % %*f April 9, 1979 MEMORANDUM FCR:

IE Technical Persennel at Three Mile Island Site FROM:

Boyce H. Grier, Director, IE Operations

SUBJECT:

IE SHIFT ORGANIZATICN It is necessary that steps be taken to improve coordination of the activities of IE reactor operations personnel and IE health p'iysii_s personnel on shif t as well as improve coordination of IE activities and NRR activities during the remainder of the TMI Recovery Phase.

In order to achieve these

' mprovements, the organi::ational arrangements for shift activities described i

below are to become effective immediately.

l l.

The IE Reactor Operations Section Chief on shif t is designated as the IE Shif t Supervisor.

2.

The IE Shif t Supervisor will report to the Senior NRC Operations representative en shift (V. Stello, D. Vollmer, J. Keppler).

3.

The IE Shift Supervisor is responsible for ccorslinating all IE activities on shif t and for coordination of IE activities with NRR activi"-ies.

The technical direction of all IE health physics activities will continue to be ander the supervision of George Smith. He will centinue to be assisted by A. Gibson in the area of in plant health p 'vsics and P. Stohr in the area of envircnmental surveys and analysis.

l I will continue to provide the overall direction for all IE or urations at the THI site.

Attached is a current listing of the shif t assignment for IE technical personnel. The number of personnel on shift will continue to be reduced as rapidly as operations permit.

e i

s A

B4 e H. Grier Director

Enclosure:

IE Shif t Organization cc:

NRC Operations - IMI Sita. (Denten, Stello, Vollmer) l IE - Dil Site J. C. Davis, IE :HQ Regional Directors, I, II, III, IV, V 144 325 L

n,

/'

0c '<

q90 01 0~

li April 9, 1979 l

IE SUIFT ORGANIZATION I

i 0000-0800 0800-1600 1600-2400 IE Shift Supervisor E.

McCabe R. Keimig B. Warnick Unit 2 CR Opne Surveillance L. Bettenhausen R. Conte W. Lazarus Unit 2 CR Communications D. Ilinckley C. Brown L. McGregor Unit 2 Opus Procedure Review B. Jorgensen R. Wessman J. Dyer 1.ead-In Plant llealth Physicist G. Yuhas B. Greger M. Schumacher in Plan t 11ealth P' sicist R. Thomas L. Ewald B. Axelson In Plant llealth Physicist T. Tongue G. Troup L. Thonus In Plant Ilealth Physicist L. Friedman D. Collins R. Curtis In Plant llealth Physicist P. Clemons IIP Procedure Review J. Baird R. Zavadoski R. Miller 1.ead-Environmental Surveys D. Donaldson D. Montgomery D.

Perrotti Enstronmental Surveys R.

Paul R. Woodruf f B. O'Neill Environmental Surveys D. Sreniawski

11. Young W.

Peery Environmental Surveys J. Glenn Environmental Surveys N. Terc Sample Analysis - Mobile Lab J. Everett T. Jackson J. Kottan

  • F Jx.

Na N

b