ML19220C702

From kanterella
Jump to navigation Jump to search
Suggests Proposed Westinghouse Decay Heat Removal Sys Design Be Modified to Better Prevent Sys Leakage.Flanged Connections Should Be Welded & Sealed Pumps Should Be Used
ML19220C702
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/30/1979
From:
Office of Nuclear Reactor Regulation
To: Harold Denton, Mattson R, Stello V
Office of Nuclear Reactor Regulation
References
NUDOCS 7905140051
Download: ML19220C702 (5)


Text

-

(/

j? ' E 0 "-

fk t-c qln g /'/d q'

z!

_s r" s "

' v '...:

' ' P..- O R :

H.

O.,t;n V.

5: 311o R.

!'.3 t t s o n F;CM:

f.RR TECHNICAL REVIEW TEAM k*as t inghcuse is proacsing to bu:Id a OMR syrt e n to serve as a backuo to tha :xis t irg OMR sys tem that.culd be operative in approxi.ratcl / 15 days._ Ihis syste.n would at best be of the saae quali ty of the existing syste:, and would not preclude 1 e:'< a g e since flarg d connections and pumps ith -echanical :cals - uld be used.

\\

'le have reviewed the proposed system design and sugcest that it be modif'rd a pr: vide as leak tight a systcm as paisible.

This would r?quir'e:

,elding of flanged cennections pressurizing between double gland valve seals sealed pu,p (i f available)

This alternate approach could tate $ to 10 days longer.

id:s the pros and cons of :he designs.

Enc;:sure IncI:sure 1 rv 2 sr:v ries ac:2?:!b:

dose l i., i t s for A;pe., dix I and ~irt 70.

It is c.e r ev : e.v.. uo spinion that as itzk tight ; s y s * :, cs p;ss ible Le desig,-c within a reasa ble t i ce restraint which we crasider to ha 30 eys r.aximum.

" R R TE CH N ! CAL R EV I EW Tf_AM 051 7905140

~\\D\\

168

=

?)0

'f ?.HR DESfCN Ti.cly Sck-Up Capability (15 Cays)

C nc mo r e* s y s t e::t which buys additior.al time down the r ca d f o r f i c.v and cooling capability.

S*sid cent.cpt buys HP advantage in installation and rer.aval.

\\

CCN - V_ OE9IG4 Not better and could be worse than existir.g system R. W. T.

Leat: age (K3ch. seals on pumps, valves with single packings (?),

and fianged connections) - patentially ur.+cceptable of fsi t e dos 2s._

Fhysically large heat e<cFanger not needed for heat but for fl ow (hard to handie) (son't fit on skid).

101 169 m

s

f_io,

$.:iC ALTE:'MTIVE Leaktight system with ir.,ard Icatage (w e l de d cor.r.ec t i o n s ).

Longer term operability 5 aller heat Rx with bypass loop could nount on one skid I

S i.,p l e r Installation G r ea te r a s s urance o'f 0.A due t o l onga r lead ti: c Setter monitoring capabilities (ISC)

_CO__N. *: R C A L T E :,':ATIVE 1.on;er time nc;-ded to obtain (p e. gs, val ves )3a s s e r.b ! e, and

'tbricate (;I 2 0- 3 0 da y s ).

Additional piping (:3 3/4) r. ceded for pos i t i ve s ea l i ng 3 cster pump r.eeded to assure leakage in proper direction.

)0\\

G P: R i C CC':S I DE:ATI C' S AdditI e.al !cading on arxi1iary buiIding Tirely clean-up of auxiliary building Functionability of AHR valves inside containment Tieing into existing lines Seismic Cens ide ra t iqn 4

\\ oto\\\\ T$1\\

_E '. ~'. 0 5 0 R E 2

_ TIME / CAYS A L L C.JA_:dE L E A K 2A TE I N G PM TO M ET APPEN31X !

FART 20

'? w

.05 1.2 15 0.17 5

30.

0.68 20 50 5.60 80

\\

10; 172

.