ML19220C343

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-320/76-02 on 760209-11.No Noncompliance Noted
ML19220C343
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/08/1976
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Arnold R
METROPOLITAN EDISON CO.
Shared Package
ML19220C344 List:
References
NUDOCS 7904300452
Download: ML19220C343 (2)


See also: IR 05000320/1976002

Text

$

UNITED ST ATFS

,

NUCLEAR REGULATORY COMMISSION

h

h[

'

F4EGloN t

.

631 PARK AVENUE

KPNG OF PRUSSI A. PENNSYLVANI A 19406

i

f

-

IIAR 8 U76

,

.

.

License No. CPPR-66

Metropolttan Edison Co=pany

Attention:

Mr. R. C. Arnold

Inspection No. 76-02

4

Vice President

Eocket No. 50-320

P.O. Box 542

Reading, Pennnylvania 19603

Centlemen:

-

This refers to the inspection conducted by Mr. W. Sanders of this office

on February 9-11, 1976 at Middletown, Pennsylvania f activities author-

o

ized by NRC License No. CPPR-66 and to the d.iscussions of our findings

held by Mr. W. Sanders with Mr. Levin of your staff at the conclusion of

'

the inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective exam-

inations of procedures and representative records, interviews with

i

personnel, and observations by the inspector.

'

Within the scope of this inspection, no items of noncumpliance were

l

observed.

.

j

In accordance with Section 2.790 of the NRC's " Rules of Practico", Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspecticu report will be placed in the NRC's Public Document

Room. If this report contains any informatien that you (or your con-

tractor) believe to be proprietary, it is necessary that you make a

written application within 20 days to this office to withhold such

.

,

Information from public disclosure. Any such application must include a

full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that pro-

prietary information identified in the application is contained in a

l

separate part of the docunent.

If vc do not hear from you in this

regard within the specified period, the report vill be placed in the

.

Public Document Room.

I

!

.

e

.

I

on

o?

.

Q g%g

-

,

<

p

e

easma

.

Q vf;

_

q

-

- '

.

.

%.#

1904300e/M

-

,

.

-

-

Metropolitan Edison Company

~2-

-

i

3

.

No reply to this letter is required; however, should you have any

questions concerning this inspection, we will be pleased to discuss

them with you.

,

,

Sincerely,

_-

deP).

w

Robert T. Carlson, Chief

Reactor Constructica and

'

Engineering Support Branch

Enclosure:

IE Inspection Report No. 50-320/76-02

.

cc:

R. L. Wayne, QA Manager, Design and Construction

T. M. Cri-, ins, Jr. , Saf ety and Licensing Manager

R. W. Eevard, Jr. , Proj ect Manager

W. A. Verrochi, Vice President, Desigr. and Construction

Cerald Charnoff, Esquire

Miss Mary V. Southard, Chairman Citizens for a Safe

Environment (Without Report)

_

.

. , _ . . .

..

. , . .

. . . . .

.

bec: (W/encis)

IE Mail & Files (For Appropriate Distribution)

PDR

Local PDR

NSIC

TIC

REC:I Reading Room

Miss Mary V. Southard, Chair =an Citizens for a

Safe Environment

State of Pennsylvania

.

.

.,

.

'

.

.

-

.

.

.

-

(

.

.

' *

C, \\

-

'

t

.

-

-

-

-

.

-

,

.

l

.

.-

.

-

_ _ . _ _ _

_ . _ _ -

_ . _ -

_ _ _ _

._

N