h Docket No. 50-320 Feb ruary 14, 19 7t.
Assistant '.,irec:cr, Engineering, TR Assistant Cirec:cr, Reactor Safety, TR Assis tr.:. Direc:cr, Containment Safe ty, TR Assistant Eirec:cr, Site Safety, TR Chief, Antitrust and Inde:nity Chief, Plans and Schedules Chief, Field Supper and Enforce en: 3 ranch, EO ACCEPTA';CR RE7IE'i 0F FSAR FC.R THREE YI' E ISLA';D, CSIT 2 (D'I-2)
Metropolitan Edisen Co. will t'endar, en February 15, its applica:ica for a permit to operate D:I-2.
Participan:s in the acceptance review wi 1 receive a ecpy cf the FSAR en February 19.
To meet the 3C-day limit for our deter =ination of the adequacy of this applica icn, ccepleted evaluation reports containing specific findings and "~
endations will be required not later than March 5, 1974. Any findings relating to ince:pleteness of this app'ica:icn cus:
be adequately discussed in these reports so as to enable the applican:
to properly respond in revisica cf the application.
Two copies of these reports shculd be provided to the Project Manager.
All review participants are requested to attend an initial co-ordina-
~
tien zeeting cn February 20. 1974, (Enclosure 1).
The prcpesed review schedule (Enclosure 2) and any special problems anticipated in perferring the acceptance review on the required schedule will be discusses. We will also provide additienal review guidance based upon open iters and specific ccucerns of the ACES frc the cons tructicn permit review, findings during Regulatory Cperations inspections, tes timeny at hearings and potential backfitting considerations.
The TMI Envirencental Report was sub=itted en October 1,1970, and supplemented en Dece:ber 13, 1971.
Se applicant was infor~ed en Sep tembe r 10, 1973, of the need to sub=1: an updated Environ: ental Report.
Submittal date for the upcated report is es ti=ated by the applican t te be April 1, 1975.
]f
< k.d.%(V W 9
v
- 3. Washburn, Project Mana::er
Enclosures:
Light k.ater Reactors 3 ranch 2-2 1.
Meeting
,,c tice a
2.
Review Schedule SB 20 790430007/%
i
{
i e
ps
t t
Oceka t No. 50-320 Feb rua.rj 14, 1974 Assistant Director, Engineering. TF Assistant Director, Reactor Safaty, TR Assistant Director, Contain ent Safet;, TR Assistant Director, Site Safety, TR Chief, Antitrust and Inde=nity Chief, Plans and Schedules Chief, Field Scyport and Enforcement 3 ranch, R0 ACCE?" ANC', RE7ITJ OF FSAR FCR THREZ mil.E ISIXiD, C"IT 2 (IMI-2)
Metropolitan Edison Co. vil' tender, on February 15, its applicatico for a per=it to operate TMI-2.
Participants in the acceptance review will receive a copy of the FSAR on February 19.
~
="--
To meet the 30-day linit for our determination of the adequa:7 of this application, completed evalustion reports containing specific findings and rewaudations vill be rea' ired not later than March 5, 1974. Any findings relating to incompleteness of this application must be adequately diacussed in these reports so as to enable the a7plicant to properly respond in revisio 2 of the application. tro copics of these reports chould be providad to the Project Manager.
All review participants pre requested to attend an initial co-ordina-tion neeting on February 20. 1974, (Enclosure 1).
'Iha proposed review schedule (Znclosure 2) and any special proble=s anticipated in perfor=ing L
the acceptance review on the required schedule vill be discussed. We ill also provide additional rtviev guidance based upon open items and specific ecucarns of the ACES frosa the construction permit review, findings during Raguincory Operations inspections, testi=ony at hearings and potential backfitting considerations.
Ihe Df1 Environ = ental Report was subnitted cn October 1,1970, and supplemented on December 13, 1971.
~&c applicant was infor=ed on Sep ra=he r 10, 1973, of the need to subnit an updated Envirtx: mental
, Report. Sub=1ttal date for the updated report if, estimated by the applicant to be April 1, 1975.
(,
- /
A B. Washburn. Pro.iect Manaser o,,c e.l _ Meeting Nod' ice Ligha Water Reactors Branch 2-2 2.
Review Schedule o.Y t *
.{ &.. _Qg}_C _,,,.