Forwards 780309 B&W Rept Documenting Postulated Loss of Ground Which Could Cause Failure of Nuclear Instrumentation/ Reactor Protection Sys
ML19220C062
Person / Time
Site: Davis Besse, Oconee, Arkansas Nuclear, Crystal River, Rancho Seco, Crane  Duke Energy icon.png
Issue date: 05/19/1978
From: Butler W
Office of Nuclear Reactor Regulation
To: Reid R
Office of Nuclear Reactor Regulation
References
NUDOCS 7904280157
Download: ML19220C062 (1)


Text

.. -

O 1b6g

2, W e

/u If.AY 1 3 1973 n..: ;

.MSICRNiDUtt.FORi' R. W. Reid, Chief, Operating Reactors Branch f4,

, j. -

, Division of Operating Reactors FR04:. ' ( $..

W. R. Dutler, Chief, Plant Systess Branch

',,..,,., Division of Operating Reactors

SUBJECT:

.. '*. BABCOCK & VII.COX HOTIFICATION UNDER 10 CFR 21

' RE: REACTOR PROTECTION SYSTEM GROUNDING Plant Names: Arkansas - 1 Crystal River - 3 Davis-Eesse - 1 j

Oconee - 1/2/3 i

Rancho Seco Three Mile Island 1 & 2 i

Docket Hu:Iers: 50-313, 50-302, 50-346 50-2 G7, 50-312 j

i Babetdk1 Milcox (B5W), cy letter dated March 9.1978 submitted a-report regarding an item which B & V believes to be reportable under the provisions of 10 CFR Part 21. The report docu=ented the evaluation of a B & W concarn wherein it was postulated that a loss of ground b

could cause the Nuclear Instru=entation/ Reactor Protection System (MI/RPS) of certain B & W nuclear plants to fail to perform its intended ll function. A copy of the report is provided as Enclosure 1.

Also, certain additional infomation submitted by B & V concerning MI/RPS 5'

grounding is provided as Enclosure 2.

l We request that the licensee of the above listed nuclear units be provided with a copyoof these enclosures and that the licansees be requested to review the grounding system with regard to the concem raised by B & W and to sutoit their evaluatica and proposed corrective acticns where required.

Further if the licensees do not have an ongoing test program to verify, on a periodic basis, the ground continuity of the MI/RPS channels, we would require them to prec:ptly for=nlate and institute such a test program I

t 773420222 7904280 N W. R. Butler, Chief plant syste=s eranch s

- 86 210 g'>= 2 -

" ' " Par ^ti"S ""*ct r' C:n 4:t.

. S i c d....- _ _.

.mM,3077 DOR:PSBb,__

DER:l'SB/5C DOR:PSB/Ci /'CORhfDis&P -

gL ab DTCNDI @

WRButler lyM!.se}! hut

~

  • u""'t?3

-See-oext-pagir 05/ f', /78 -

05Llhl8 05/M/78

_gs/0/79

-e

~ _

K..%.../.., T.msores.,. r.g_

rac roxx ne &m mtcx a:a

-~

= - -. _ ~ ~. -

_