Forwards IE Insp Rept 50-320/77-26 on 770620-24,30,0701 & 05-08.No Noncompliance Noted
ML19220C035
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/11/1977
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Herbein J
METROPOLITAN EDISON CO.
Shared Package
ML19220C036 List:
References
NUDOCS 7904280095
Download: ML19220C035 (2)


See also: IR 05000320/1977026

Text

C CMA/L FI LE3

.

f ** M

i

UNITED ST ATES

g

,#

d

NUCLEAR REGULATORY COMMtsslON

,

.grgi i

nE=~ i

.

p

$31 P AR K AVE NUC

e

g

KING OF PRUSSI A. PENNSY LV ANI A 19406

.,

q

.....-

AUG 111977

Docket No. 50-320

-

Metropolitan Edison Company

ATTN: Mr. J. G. Herbein

~

Vice President

P. O. Box 542

Reading, Pennsylvania 19603

Gentlemen:

Subject:

Inspection 50-320/77-26

~

This refers to the inspection conducted by Mr. R. Conte of this office

on June 20-24, June 30, July 1 and July 5-8, 1977, at Three Mile Island

2, Middletown, Pennsylvania, of activities authorized by NRC License No.

CPPR-66 and to the discussions of our findings held by Messrs. Conte and

Higgins of this office with Mr. J. Hilbish and other members of your

staff at the conclusion of the inspection, and to a subsequent telephone

discussion between Mr. Hilbish, Station Nuclear Engineer and Mr. Conte

i

'

'

on July 11,12 and 13,1977 and between Mr. G. Miller, Station Super-

intendent and Mr. Conte on July 13, 1977.

Areas examined during this inspection are described in the Office of

Inspection ard Enforcement Inspection Report which is enclosed with this

l etter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, arid observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

1

observed.

.

In accordance with Section 2.790 of the !!RC's " Rules of Practice", Part

-

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your con-

tractor) believe to be proprietary, it is necessary that you mke a

written application within 20 days to this office to withhold such

information from public disclosure.

Any sul.. application must be ac-

companied by an affidavit executed by the owner of the information,

which identifies the document or part sought to be withheld, and which

_

$._k

(-

. - - -

%

Obl

'

. ,

.

&

.

,

~

790428(10 6

_

f 7'WAC 2

h

Metropolitan Edison Company

2

AUG 111977

contains a statement of reasons which addresses with specificity the

items which will be considered by the Commission as listed in subpara-

graph (b)(4) of Section 2.790. The information sought to be withheld

shall be incorporated as far as possible into a separate part of the

affidavit.

If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.

No reply to this letter is required; however, if you should have any

questions conce-ning this inspection, we will be pleased to discuss them

with you.

Sincerely,

{,_

sJ

l c/i v. Brunner, Chief

Res6 tor Operations and Nuclear

Shpport Branch

Enclosure: Office of Inspection and Enforcement

Inspection Report Number 50-320/77-26

cc w/ encl:

R. L. Wayne, QA Manager, Design & Construction

T. M. Crintains, Jr., Safety & Licensing Menager

R. W. Heward, Jr., Project Manager

l'. C. Arnold, Vice President, Design & Construction

L. L. Lawyer, Manager, Generation Operations - Nuclear

G. P. Miller, Superintendent

Gerald Charnoff, Esquire

Miss Mary V. Southard, Chairman, Citizens for a Safe Environment

(WithoutReport)

.