ML19220C010

From kanterella
Jump to navigation Jump to search
Finds Sections 3.5,9.0, & 10.0 of FSAR Dtd Oct 1972 Acceptable.Forwards Preliminary Review Evaluation
ML19220C010
Person / Time
Site: Crane Constellation icon.png
Issue date: 02/27/1974
From: Long C
US Atomic Energy Commission (AEC)
To: Kniel K
US Atomic Energy Commission (AEC)
Shared Package
ML19220C012 List:
References
NUDOCS 7904280063
Download: ML19220C010 (2)


Text

5 DISTRlm fl0::

Docket File p

L Reading L:CS

' ~ ~ ' ' 'a L:APCSB Docket Mc. 50-223 7.arl ';niel, Chief, Light "a'ater Keactor Project Ersach 2-2, L ACCEF"'XICE MIrJ: TERC MILE ISLAND UNIT 2 Plant Na=e: Three Mile Island Nuclear Station - Unit 2,

&tropolitan Edison Company Licensing Stage: Acceptance Ecview (CL)

Docket Nusber: 50-320 Responsible Branch:

L'-7 Project 3 ranch 2-2 Project Leader:

3. V. *='ashburn Requested Completion Date: March 5, 1974 The Aurf112ry and Power Ocuversion Systems 3rsneh has completed a review of Sec@h Standard Format,3.3, 9.0 and 10.0 for ccupleteness, in acecrdance with t Revision 1, dated October 1972. We find thase sections to be acceptable.

The attached ccewnts cite items of omission, and requiremer.ts imposed by Regulation since the CP for this plant was issued.

We reco - d these subjects be included in the ? SAL T

The time for completien of this review was three man days.

Charles G. Long, Chief Atrriliary and Power Conversion Systems 3 ranch Directorate of Licensing Zuclosure:

As Stated q 9 0 4 ~> 8 0 0 Dm pn 6_/

emcz >.ucs:ac at.. uswcS3 I I

1,. - i.. / /4 R a

sunwwc >

l L.Ccnnery 1 C.I.cng DAtt >. 2/OJ._7./.M....j. 2/.h.f[./ 7 a i...

'*3

/

(

l

~

1-uc-n m...nurc.xom

~,_,_ _.

f, -

=

Karl Kniel - 27;n ec:

(w/o Encl.)

A. Ctanbusso W. McDor.ald (w/"aci.)

J. Hendrie S. Han.tuer D. Eisenbut J. Carter S. Varga W. Sutler K. Iniel C. Iong J. Glynn I..

Connary V. Poore 7 904 2 8 0 0G7

\\

CmCI>

l

..sg...;g:g so.-1, i

om i Fore AIC-31d lRev 3 33; AIC.M 0240

..e

.exe-stess-1 unit

FE3 2 01N V. A. Moore, Assistant Director for Lis;ht Water Re-tors Group 2 Directorate of Licensing PRELD1I:IARI RZ7IEW E7ALCATION Plant Name: Three Mile Island Nuclear Station Unit 2 Licensing Stage: Acceptance acview of FSAR Project Ntnaber: 50-320 Responsible 3 ranch and Project Manager: LVI 2-2, 5. W. Washburn Responsible T1 Branch and TM,4 e,'

Reriever:

E3, I:. G. Igne Requested Cocupletion Date: 3/5/74 Description of Respass: Acceptance Review of PSAR Review Status: Cosplete Areas of Review The M~ han4-=1 Engineering 3rs=ch, Directorate of Licensing, has reviewed Sections 3.6, 3.9, 3.10, 4.2, 5.2 and 5.5 for completeness of the appf ir arion material for the Three Mile Island Nuclear Statien FSAR. The bemis used to determine completeness of these sections was the "Sr== lard For=at and Content of Safety Arts 17 sis Reports for Nuclear Power Plants" dated October 1972 (Revision 1).

Assessment of F:MR Material As measured against the Standard Fornat the applicant has supplied over 95% of the information necessary for the :G3 review.

Review Conclusion 99 have concluded that the applice.nt has provided a FSAR sufficiently complate to psoceed with the detail review.

Original sq:ed b/

h. a. M c:::Y R. R. Maccary, Assistant Director for Engineering Directorate of Licensing ec:

S. H. L n=ner, DETA Project N File F0-320 J. M. Hendrie, L L, Reading File D. 3. 7ss==11 n, L L:MI3 File

< m.,s,,,m t

_n W. G. McDodald, L

{CJ,}

emer*

L,ggy L;g33 hate"ac,

....n..

.g

__ A S. Wasm

_t anne em mnet r,

_,_g ;_ g _ g e g g j ___j___

8

  • I8"*' L 2/c m

,m...,,-

W