ML19220B960

From kanterella
Jump to navigation Jump to search
Forwards Final Deficiency Rept on Use of Unapproved QC Procedures,Reportable Under 10CFR50.55(e)
ML19220B960
Person / Time
Site: Crane Constellation icon.png
Issue date: 09/06/1974
From: Arnold R
Metropolitan Edison Co
To: Knuth D
US Atomic Energy Commission (AEC)
Shared Package
ML19220B961 List:
References
GQL-0310, GQL-310, NUDOCS 7904280009
Download: ML19220B960 (1)


Text

+,,

J-

- *.,,. - (

jfa * :.7g _i

, y. m r

~,, c x au METROPOLITAN EDISON COMPtNY 200 Oc::c5 3cX 542 P E A cl*JG, PE'. ;SY LV ANI A

  • 9600 TELEPHCNE 215 - 9^9CCCI SEP 6 1974 GCI 0310 Dr. D. F. Knuth, Director Oirectorate cf Regulatcry Operaticns Office of Regulation United States Atcmic Energy C 4ssion Washin *,.cc, D. C.

205h5 e

Dear Dr. Knuth:

Constructica Fer=it CFFE-66 Ecchet :To. 50-320 Cn k;gast 8,197L, ycu were.netified of a situaticn involving the use cf unappreved precedures.(a eccditica which we cen-sider te be reportable under 10 CFE 50.55(e)). In accordance with 10 CFE 50 55(e)(3), additicnal infernation regareing this ccnditien is sut=it*,ed herein; and this ccnstitutes our cc=plete reper..

Sincerely,

{\\ b

('

v-

3. C. [Inc1d Vice President ECA:JF7:sh Fsclosure: Ceficiency Report ec:

5'r. J. F. C ' Eeilly 7 904380067 Biw H 84 181 a44-

_m. _u

'