ML19220B959

From kanterella
Jump to navigation Jump to search
ForwardsBulletin 74-15, Misapplication of Cutler-Hammer Three Position Maintained Switch Model 10250T. W/O Encl
ML19220B959
Person / Time
Site: Crane  Constellation icon.png
Issue date: 12/06/1974
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Arnold R
METROPOLITAN EDISON CO.
References
NUDOCS 7904280008
Download: ML19220B959 (1)


Text

.

UNITED ST A Is

, d' U",

ATOMIC ENERGY COMMISSICN

,g o.uccTon a rc or ~ c cu ta ro u v c.c = 4 7:o~s g.-

yq a c c.. o ~.

C 4

saiPaw avt.us "s\\

/c KING or PRUSSI A, PEN N!Y L 2NI A 194C6

,;,-p December 6, 1974 Metropolitan Edison Cenpany Docket No. 50-320 Attention:

Mr. R. C. Arnold Vice President P. O. Ecx 542 Reading, PA 19603 Gentle =en:

The enclosed RO Sulletin requests action by you with regard to your power reactor facility (les) with operating license or construction permit.

Should you have questions regarding this Bulletin or actions requested of you, please contact this office.

Sincerely,

/

A

% James P. O'Reilly Director

Enclosure:

R0 Bulletin 74-15

" Approved by GAO, 3-130225 (RC072), clearance expires 7-31-77.

Approval was given under a blanket clearance specifically for identified generic problens."

cc:

R. L. Wayne, QA Manager, Design and Ccnstruction T. M. Crin= ins, Jr., Safety & Licensing Manager R. W. Heward, Jr., Project Manager W. A. Verrochi. Vice President, Design & Ccnstructica Gerald Charnoff, Esquire bec:

R0 Files c'DR *" Nb 7 904 2 8 o oog 3y Local PDR Reg. Reg. Rdg R=

b'E i b S, tate of Pennsylvania

.L D'k 1 (D